## In short

State power distributors pay NHPC for hydropower at tariffs set by the regulator; of every ₹100 that comes in (including ₹14.5 of accounting items), generation and other running costs take ₹32.9 and ₹25.4 is profit for shareholders.

- The regulator CERC fixes each station's annual charges from five parts: return on equity, depreciation, interest on loans, operation and maintenance, and interest on working capital.
- NHPC's borrowings rose from ₹39,434 crore on 31 Mar 2025 to ₹57,220 crore on 30 Sep 2026, and 8,954 MW of projects were under construction in Nov 2026.

## Key facts

**What does NHPC do?**

NHPC Limited, a government-controlled company based in Faridabad, Haryana, builds and runs hydroelectric power stations and sells the electricity in bulk. NHPC had 9,583 MW of installed capacity in Nov 2026, of which 9,021 MW was hydro and 562 MW solar and wind. [S1, S11]

**How does NHPC make money?**

NHPC earns most of its money from tariffs set by the Central Electricity Regulatory Commission (CERC), which cover a station's return on equity, depreciation, interest on loans, operation and maintenance, and interest on working capital. NHPC's revenue from operations was ₹11,615 crore in FY26. [S1]

**Who are NHPC's customers?**

NHPC's three largest customers in FY26 were Uttar Pradesh Power Corporation (15.1% of revenue), Jammu & Kashmir's Power Development Department and JK Power Corporation (12.3%), and MP Power Management Company (11.2%), together 38.66% of NHPC's revenue. [S1]

**How big is NHPC?**

In FY26 NHPC's consolidated revenue was ₹11,615 crore and its profit for shareholders ₹3,766 crore, up from ₹10,380 crore and ₹3,007 crore in FY25. [S1]

**Who owns NHPC?**

On 30 Sep 2026 the President of India (the central government) held 61.39% of NHPC. Domestic institutions held 14.27%, foreign portfolio investors 13.17%, companies controlled by central or state governments 1.13%, and individuals and other non-institutional holders 10.04%. [S28]

**What is NHPC's regulatory deferral account?**

NHPC's regulatory deferral account holds costs that CERC rules let it recover from buyers through later tariffs. Movements in the account added ₹983 crore to NHPC's FY26 profit of ₹4,220 crore (including minority partners' share). [S1]

**What is NHPC's Subansiri Lower project?**

Subansiri Lower is NHPC's 2,000 MW hydro project of eight 250 MW units in Assam and Arunachal Pradesh. Five of its units, 1,250 MW, were in commercial operation from 23 Oct 2026. [S31, S11]

**What is NHDC, NHPC's subsidiary?**

NHDC Ltd is 51.08% owned by NHPC and runs the Indirasagar (1,000 MW) and Omkareshwar (520 MW) hydro stations in Madhya Pradesh. NHDC's FY26 revenue was ₹1,305 crore and its profit ₹936 crore, according to NHPC's Nov 2026 presentation. [S1, S11]

**What dividend did NHPC pay for FY26?**

NHPC paid dividends of ₹1.61 a share for FY26 (an interim of ₹1.40 and a final of ₹0.21), against ₹1.91 a share for FY25. [S1, S2]

## What does NHPC sell?

NHPC builds and runs hydroelectric power stations, mostly in the Himalayan states, and sells the electricity in bulk to state power distributors. A hydro station uses flowing river water to spin turbines that make electricity.

- **Hydropower from NHPC's own stations:** 7,501.2 MW across 22 hydro stations in Nov 2026, including 1,250 MW of Subansiri Lower and 800 MW of Parbati-II. FY27 tariffs range from ₹1.97 a unit (Teesta-V) to ₹10.61 (Nimoo Bazgo), averaging ₹3.99. [S11]
- **Hydropower from NHDC (51.08% owned):** Indirasagar (1,000 MW) and Omkareshwar (520 MW) in Madhya Pradesh. In FY26 NHPC's own stations accounted for ₹3,133 crore (74.24%) of the group's ₹4,220 crore profit, NHDC for ₹643 crore (15.25%) after intra-group eliminations, and minority partners for ₹455 crore (10.77%). [S1, S11]
- **Solar and wind power:** 562 MW in Nov 2026, including the 300 MW Karnisar solar plant near Bikaner, commissioned in FY26. Solar made 782 MU and wind 57 MU of the group's 29,600 MU in FY26. [S11, S1]

## Who pays NHPC?

- **Uttar Pradesh Power Corporation (15.1% of revenue):** Uttar Pradesh's state power company: 15.1% of NHPC's FY26 revenue (₹1,754 crore). [S1]
- **Jammu & Kashmir power utilities (12.3% of revenue):** Power Development Department, J&K Govt, and JK Power Corporation: 12.3% of FY26 revenue (₹1,431 crore). [S1]
- **MP Power Management Company (11.2% of revenue):** Madhya Pradesh's state power buyer: 11.2% of FY26 revenue (₹1,305 crore). [S1]
- **Other buyers, mainly other states' distributors (61.3% of revenue):** 61.3% of FY26 revenue (Cityfort calculation: 100% − 38.66% for the three largest customers (S1)). ICRA describes NHPC's buyers as mainly state distribution utilities. [S1, S29]
- **Customer concentration:** largest customer 15.1% of revenue. Three customers each gave NHPC more than 10% of FY26 revenue, 38.66% together (₹4,491 crore). On 30 Sep 2026 the five largest debtors were J&K (₹700 crore), Uttar Pradesh (₹668 crore), Rajasthan (₹657 crore, of which ₹252 crore was more than 45 days old), Punjab (₹394 crore) and Madhya Pradesh (₹382 crore). ICRA says a tripartite agreement substantially mitigates the counterparty risk. [S1, S11, S29]

## Where the money went (FY26)

1. In FY26 NHPC brought in ₹11,615 crore of revenue and ₹1,071 crore of other income.
2. Two accounting items added more: ₹983 crore of regulatory deferral income and a ₹1,165 crore deferred-tax credit.
3. Generation and other running costs took ₹4,881 crore, including ₹822 crore of Subansiri Lower transmission charges. Employees took ₹1,498 crore.
4. Depreciation took ₹1,976 crore, interest ₹1,423 crore and current tax ₹839 crore. Minority partners in subsidiaries took ₹455 crore.
5. What was left for NHPC's shareholders was ₹3,766 crore of profit.

Sources: S1.

## Key numbers by year (₹ crore)

Financials: consolidated, ₹ crore. Financial year runs April to March (March year end). — = not shown on the page.

| Year | Revenue | EBITDA | EBITDA margin | Net profit | Net margin | EPS (₹ per share) | Operating cash flow | Capital spending | Free cash flow | Sources |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| FY22 | 9,144 | 5,186 | 56.7% | 3,524 | 38.5% | — | 4,590 | 3,701 | 888 | S4 |
| FY23 (restated) | 10,607 | 6,263 | 59.0% | 3,903 | 36.8% | — | 4,705 | 4,975 | −271 | S3 |
| FY24 (restated) | 9,631 | 5,185 | 53.8% | 3,596 | 37.3% | — | 7,252 | 6,969 | 283 | S2 |
| FY25 (restated) | 10,380 | 5,637 | 54.3% | 3,007 | 29.0% | 2.99 | 5,026 | 8,851 | −3,825 | S1 |
| FY26 | 11,615 | 5,238 | 45.1% | 3,766 | 32.4% | 3.75 | 3,294 | 11,572 | −8,279 | S1 |

- EBITDA = profit before interest, tax and wear-and-tear of assets.
- Net profit is the share belonging to the company's owners.
- FY26: Total profit includes the share of minority partners in subsidiaries, mostly NHDC.

## Balance sheet (as of 30 Sep 2026, ₹ crore)

On 30 Sep 2026 NHPC's net debt of ₹52,575 crore was about 16 times its FY26 operating cash flow (Cityfort calculation: ₹52,575 ÷ ₹3,294 crore (S5, S1)). [S5, S1, S2, S29]

| Item | Value |
| --- | --- |
| Total debt | 57,220 |
| Cash and investments | 4,645 |
| Net debt (debt minus cash) | 52,575 |
| Net worth (shareholders' money) | 43,741 |
| Debt to equity (times) | 1.31 |
| Interest cover (times) | 3.05 |

- Borrowings rose from ₹39,434 crore on 31 Mar 2025 to ₹52,134 crore on 31 Mar 2026 and ₹57,220 crore on 30 Sep 2026. Lease liabilities (₹193 crore on 31 Mar 2026) are outside borrowings.
- Cash = cash and equivalents (₹2,751 crore) plus other bank balances (₹1,894 crore) on 30 Sep 2026.
- Debt to equity 1.31 (Cityfort calculation: ₹57,220 crore borrowings ÷ ₹43,741 crore equity of NHPC shareholders on 30 Sep 2026 (S5)); including minority partners' equity (₹50,752 crore in total) it is 1.13.
- Interest coverage 3.05 (Cityfort calculation: (₹2,910 crore FY26 profit before tax and regulatory deferral movements + ₹1,423 crore interest) ÷ ₹1,423 crore (S1)). A further ₹1,772 crore of FY26 interest was added to the cost of projects under construction.
- ICRA put NHPC's FY26 total debt at 9.99 times its operating profit (OPBDIT), against 7.12 in FY25, and rates it [ICRA]AAA (Stable) (1 Jul 2026).
- Regulatory deferral debit balances, amounts NHPC expects to recover from buyers through later tariffs, were ₹8,818 crore on 30 Sep 2026, up from ₹8,416 crore on 31 Mar 2026.

## Who owns NHPC? (shareholding, Q2 FY27)

| Holder | % of shares |
| --- | --- |
| Promoters | 61.39% |
| Promoter shares pledged (% of promoter shares) | 0.0% |
| Foreign institutions (FII) | 13.17% |
| Indian institutions (DII) | 14.27% |
| Public | 10.04% |
| Companies controlled by central or state governments | 1.13% |

Sources: S28, S27, S26, S25, S24, S23, S22, S21, S20, S19, S18, S29.

## What could go wrong

### Delays and cost overruns on big projects

Subansiri Lower was approved at ₹6,285 crore (Dec 2002 prices) and is now expected to cost ₹30,072 crore. In Nov 2024 management expected it complete by May 2026; the Nov 2026 presentation shows the last three units in Q1 FY28. ICRA says further lapses on hydro projects cannot be ruled out. [S11, S16, S29]

What to watch: Commercial operation of Subansiri Lower's last three units, and Pakal Dul (Q1 FY28) and Kiru (Q4 FY27).

### Waiting for CERC tariff decisions

Subansiri Lower and Parbati-II revenue is booked provisionally until CERC issues final tariffs. ICRA says timely CERC approval of capital costs is key, and any material disallowance could hit returns; stricter future tariff norms, such as a lower return on equity, could cut profit. [S5, S29]

What to watch: CERC's final tariff orders for Subansiri Lower and Parbati-II.

### Rising debt

Borrowings rose from ₹39,434 crore on 31 Mar 2025 to ₹57,220 crore on 30 Sep 2026. ICRA put FY26 total debt at 9.99 times operating profit, against 7.12 in FY25, and said leverage will stay high with capex of ₹13,000–15,000 crore a year. [S1, S5, S29, S11]

What to watch: Borrowings each quarter against the ₹15,000 crore FY27 capex target.

### Payments from state distributors

Three state buyers gave NHPC 38.66% of FY26 revenue. ICRA names counterparty risk from state distribution utilities with relatively weak credit profiles, and says the tripartite agreement is due for renewal for some states in FY27. [S1, S29, S11]

What to watch: Trade receivables (₹4,283 crore on 30 Sep 2026, ₹290 crore over 45 days).

### Floods, landslides and tunnel hazards

Teesta-V (510 MW) was fully shut from 4 Oct 2023 after a glacial lake flood and an upstream dam breach; all three units were back in commercial operation from 16 Jul 2026. On 20 Jul 2026 a suspected methane burst in the Teesta-VI tunnel trapped 25 people; NHPC reported 10 casualties at the time. [S1, S33, S32]

What to watch: NHPC said a detailed investigation will be undertaken to find the cause of the Teesta-VI incident.

### Profit depends on regulatory accounting

Regulatory deferral movements were 23.3% of FY26 profit (Cityfort calculation: ₹983 ÷ ₹4,220 crore (S1)). The balances to be recovered from buyers were ₹8,818 crore on 30 Sep 2026. NHPC names demand risk and regulatory risk for recovering the Subansiri Lower amounts. [S1, S5]

What to watch: Regulatory deferral debit balances each half-year.

## What to watch

Next: Q3 FY27 results, Date not announced yet.

- **Subansiri Lower's last three units:** Five of eight units were running from 23 Oct 2026; NHPC's Nov 2026 presentation shows the next three in Q1 FY28.
- **CERC tariff orders:** Q2 FY27 sales of ₹678 crore from Subansiri Lower and ₹553 crore from Parbati-II were booked provisionally.
- **Borrowings and capex:** Borrowings were ₹57,220 crore on 30 Sep 2026. NHPC's FY27 capex target is ₹15,000 crore on its presentation's own measure; the cash flow statement's capex line was ₹5,685 crore in H1 FY27.

## Sources

- S1: Annual Report FY26 (incl. BRSR). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17859081100.pdf (published 5 Aug 2026)
- S2: Annual Report FY25. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17544630290.pdf (published 6 Aug 2025)
- S3: Annual Report FY24 (IR copy uploaded 29 Jul 2025; 48th AGM 28 Aug 2024). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17537821590.pdf (published 29 Jul 2025)
- S4: Annual Report FY23 (IR copy uploaded 29 Jul 2025). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17537820850.pdf (published 29 Jul 2025)
- S5: Unaudited financial results Q2 and H1 FY27 (standalone and consolidated). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17938035090.pdf (published 4 Nov 2026)
- S6: Unaudited financial results Q1 FY27 (standalone and consolidated). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17859054100.pdf (published 4 Aug 2026)
- S7: Unaudited financial results Q3 and 9M FY26. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17702051100.pdf (published 4 Feb 2026)
- S8: Unaudited financial results Q2 and H1 FY26. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17624300070.pdf (published 6 Nov 2025)
- S9: Audited financial results Q4 and FY25. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17477601670.pdf (published 20 May 2025)
- S10: Unaudited financial results Q3 and 9M FY25. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17389394980.pdf (published 7 Feb 2025)
- S11: Investor Presentation September 2026. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17938026250.pdf (published 4 Nov 2026)
- S13: Transcript, Q4 FY26 earnings call (18 May 2026). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17797050360.pdf (published 25 May 2026)
- S15: Transcript, Q4 FY25 earnings call (21 May 2025). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17484344190.pdf (published 28 May 2025)
- S16: Transcript, Q2 FY25 earnings call (8 Nov 2024). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17319254910.pdf (published 18 Nov 2024)
- S18: Shareholding pattern, quarter ended 31 Mar 2024. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17135033290.pdf (published 19 Apr 2024)
- S19: Shareholding pattern, quarter ended 30 Jun 2024. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17212062860.pdf (published 17 Jul 2024)
- S20: Shareholding pattern, quarter ended 30 Sep 2024. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17296756920.pdf (published 23 Oct 2024)
- S21: Shareholding pattern, quarter ended 31 Dec 2024. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17371140200.pdf (published 17 Jan 2025)
- S22: Shareholding pattern, quarter ended 31 Mar 2025. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17448936000.pdf (published 17 Apr 2025)
- S23: Shareholding pattern, quarter ended 30 Jun 2025. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17528444750.pdf (published 18 Jul 2025)
- S24: Shareholding pattern, quarter ended 30 Sep 2025. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17605979560.pdf (published 16 Oct 2025)
- S25: Shareholding pattern, quarter ended 31 Dec 2025. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17681925470.pdf (published 12 Jan 2026)
- S26: Shareholding pattern, quarter ended 31 Mar 2026. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17767749880.pdf (published 21 Apr 2026)
- S27: Shareholding pattern, quarter ended 30 Jun 2026. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17845264010.pdf (published 20 Jul 2026)
- S28: Shareholding pattern, quarter ended 30 Sep 2026. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17920748010.pdf (published 15 Oct 2026)
- S29: ICRA rationale: NHPC Limited, rating reaffirmed [ICRA]AAA (Stable). ICRA Ltd. https://www.icra.in/Rating/ShowRationalReportFilePdf/144051 (published 1 Jul 2026)
- S30: NSE security-wise bhavcopy (full), 11 Nov 2026. National Stock Exchange of India. https://nsearchives.nseindia.com/products/content/sec_bhavdata_full_11112026.csv (published 11 Nov 2026)
- S31: Update on commissioning of Subansiri Lower HE Project (Unit 5 COD 23 Oct 2026). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17929900630.pdf (published 21 Oct 2026)
- S32: Press release: Incident at Teesta VI HE Project (500 MW), Sikkim. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17846236840.pdf (published 21 Jul 2026)
- S33: Resumption of commercial operation of last unit (170 MW) of Teesta-V Power Station. NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17841947890.pdf (published 16 Jul 2026)
- S34: Investment approval for Kamala Hydro Electric Project (1720 MW). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17757103470.pdf (published 8 Apr 2026)
- S35: Change in status of material litigation under arbitration (award 1 Sep 2026, BGS-SGS-SOMA). NHPC Ltd (company IR site; same filing made to NSE/BSE). https://www.nhpcindia.com/assests/pzi_public/gallery/17884074130.pdf (published 2 Sep 2026)