# Tata Power: how the business works

> For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

The Tata Power Company Limited · NSE: TATAPOWER · BSE: 500400 · Sector: Power

Updated for Q2 FY27 · checked 12 Nov 2026

This is the plain-text version of https://cityfort.in/stocks/tata-power. Source ids in [brackets] refer to the list at the end. Credit: "Cityfort, Tata Power: how the business works", with the page URL.

## In short

Homes, businesses and state power buyers pay Tata Power for electricity; buying power and fuel takes ₹43.2 of every ₹100, and ₹5.7 is left for shareholders.

- Electricity networks in Mumbai, Delhi, Odisha and Ajmer, plus power trading, brought in 60.4% of FY26 segment revenue.
- FY26 revenue fell 4.7% to ₹62,429 crore. The 4,150 MW Mundra coal plant was shut for overhaul from 3 Jul 2025 until 1 Apr 2026.

## Key facts

**What does Tata Power do?**

The Tata Power Company Limited, based in Mumbai, makes electricity from coal, water, sun and wind, runs power networks in Mumbai, Delhi, Odisha and Ajmer, and makes solar cells and modules. Tata Power's FY26 revenue from operations was ₹62,429 crore. [S1, S7, S19]

**How does Tata Power make money?**

Tata Power earns most of its revenue by supplying electricity to homes and businesses. In FY26, transmission and distribution was 60.4% of Tata Power's segment revenue, renewables 22.0%, thermal and hydro generation 17.0% and other businesses 0.6%. Tata Power's FY26 segment result, its profit before interest and tax, was ₹10,599 crore. [S7, S1]

**Who are Tata Power's customers?**

Tata Power's distribution companies served 13.3 million customers in Mumbai, Delhi, Odisha and Ajmer as of Sep 2026. Its power plants sell mainly to state electricity distribution companies under long-term contracts. [S19, S37]

**How big is Tata Power?**

Tata Power's FY26 revenue from operations was ₹62,429 crore and its profit for shareholders was ₹3,747 crore. Including minority partners' share, Tata Power's FY26 profit was ₹5,118 crore. Its installed capacity was 17.4 GW in Sep 2026. [S7, S1, S19]

**Who owns Tata Power?**

As of Sep 2026, Tata Power's promoter group, led by Tata Sons with 45.21%, owned 46.86% of its shares, with none pledged. Foreign investors held 10.13% and Indian institutions 18.48%, including LIC with 5.72%. [S25]

**Why did Tata Power's revenue fall in FY26?**

Tata Power's FY26 revenue fell 4.7%, from ₹65,478 crore to ₹62,429 crore. Its Thermal & Hydro segment revenue fell from ₹19,739 crore to ₹11,636 crore while the 4,150 MW Mundra plant was shut for overhaul from 3 Jul 2025 to 1 Apr 2026. [S7, S11, S1, S4]

**How much debt does Tata Power have?**

On 30 Sep 2026 Tata Power's consolidated borrowings were ₹73,846 crore and its cash, bank balances and current investments ₹11,165 crore, so net debt was ₹62,681 crore. Net debt was ₹45,092 crore on 31 Mar 2025. [S5, S19, S11]

**How much power capacity does Tata Power have?**

Tata Power's Q2 FY27 investor presentation gives 17.4 GW of installed capacity as of Sep 2026: thermal 8.8 GW, solar 5.8 GW, wind 1.3 GW, hydro 0.9 GW and waste heat 0.6 GW. Other Tata Power filings give lower totals on different bases. [S19, S44, S37]

**What dividend did Tata Power pay for FY26?**

Tata Power's board recommended a dividend of ₹2.50 per share for FY26 on 12 May 2026, up from ₹2.25 per share for FY25. [S18, S1]

## What does Tata Power sell?

Tata Power makes electricity and delivers it. It owns power plants, the wires that carry power, and the local networks that bring it to homes. It also makes solar panels and installs them on rooftops.

- **Electricity to homes and businesses:** Runs local power networks in Mumbai, Delhi, Odisha and Ajmer, with 13.3 million customers. Partners own 49% of the Delhi and Odisha companies. [S19]
- **Power from coal and water:** 8.8 GW of coal and gas plants, including the 4,150 MW Mundra plant, and 0.9 GW of hydro plants. Buyers include state distribution companies such as GUVNL. [S19, S1]
- **Solar and wind power:** 5.8 GW of solar and 1.3 GW of wind plants as of Sep 2026, selling power under long-term contracts. [S19, S37]
- **Solar cells, modules and rooftop systems:** A factory with about 4.9 GW a year of cell and module capacity. About 5.1 GWp of rooftop solar installed for customers so far. [S19]
- **Transmission lines:** High-voltage lines that carry power across regions: 5,724 circuit km operating and 2,170 under construction. [S19]
- **EV charging:** 6,223 public chargers and 2,87,508 home chargers installed so far. [S19]

## Who pays Tata Power?

- **Electricity users and power-trading buyers (60.4% of revenue):** Homes, shops and factories in Mumbai, Delhi, Odisha and Ajmer, plus buyers of traded power and transmission users. Share is of FY26 segment revenue before removing sales between segments. [S7, S1]
- **Buyers of solar and wind power, panels and rooftop systems (22.0% of revenue):** State distribution companies and businesses buying renewable power, buyers of solar modules, rooftop customers and EPC (build-for-others) clients. [S7, S1]
- **Buyers of thermal and hydro power (17.0% of revenue):** Mainly state distribution companies buying power from coal, gas and hydro plants, such as GUVNL for Mundra. Includes coal and shipping income. [S7, S1]
- **Others (0.6% of revenue):** Project services and satellite communication (Nelco). [S7, S1]
- **Customer concentration:** Tata Power does not disclose revenue by customer. CARE's June 2026 report says MSEDCL (14%) and GUVNL (13%) are the largest buyers in its renewables contracts, with none above 15%. [S37]

## Where the money went (FY26)

1. In FY26 Tata Power's businesses brought in ₹62,429 crore of revenue, plus ₹1,743 crore of other income.
2. Regulatory income of ₹1,252 crore, which regulators let it recover later through tariffs, and ₹708 crore from part-owned companies added ₹1,960 crore.
3. Power bought and transmission charges took ₹21,115 crore, fuel ₹7,498 crore and materials and construction ₹8,577 crore.
4. Employees and other running costs took ₹12,143 crore. Interest, depreciation and one-off items took ₹10,162 crore.
5. After ₹1,518 crore of income tax and ₹1,370 crore for minority partners, ₹3,747 crore was left for Tata Power's shareholders.

Sources: S7, S1.

## Key numbers by year (₹ crore)

Financials: consolidated, ₹ crore. Financial year runs April to March (March year end). — = not shown on the page.

| Year | Revenue | EBITDA | EBITDA margin | Net profit | Net margin | EPS (₹ per share) | Operating cash flow | Capital spending | Free cash flow | Sources |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| FY22 | 42,816 | 9,064 | 21.2% | 1,741 | 4.1% | 5.36 | 6,693 | 7,268 | −575 | S17, S3 |
| FY23 | 55,109 | 11,830 | 21.5% | 3,336 | 6.1% | 10.43 | 7,159 | 7,656 | −497 | S16, S2 |
| FY24 | 61,449 | 12,328 | 20.1% | 3,696 | 6.0% | 11.56 | 12,596 | 13,333 | −737 | S15, S2 |
| FY25 | 65,478 | 13,625 | 20.8% | 3,971 | 6.1% | 12.42 | 12,680 | 17,273 | −4,593 | S11, S1 |
| FY26 | 62,429 | 14,961 | 24.0% | 3,747 | 6.0% | 11.72 | 5,993 | 13,695 | −7,702 | S7, S1 |

- EBITDA = profit before interest, tax and wear-and-tear of assets.
- Net profit is the share belonging to the company's owners.
- FY26: Total profit includes ₹1,370 crore for minority partners, who own 11.43% of the renewables arm and 49% of the Delhi and Odisha distribution companies.

## Balance sheet (as of 30 Sep 2026, ₹ crore)

On 30 Sep 2026 Tata Power's net debt was ₹62,681 crore, 1.27 times its total equity, the company's own measure. [S5, S19, S7, S11, S1]

| Item | Value |
| --- | --- |
| Total debt | 73,846 |
| Cash and investments | 11,165 |
| Net debt (debt minus cash) | 62,681 |
| Net worth (shareholders' money) | 49,331 |
| Debt to equity (times) | 1.5 |

- Total debt is borrowings, excluding ₹5,295 crore of lease liabilities. Cash and investments are cash, other bank balances and current investments.
- Net worth (₹49,331 crore) includes ₹7,883 crore belonging to minority partners. Debt to equity of 1.5 is a Cityfort calculation: total debt ÷ net worth.
- Net debt was ₹45,092 crore on 31 Mar 2025 and ₹56,122 crore on 31 Mar 2026.
- On 31 Mar 2026 group current liabilities were ₹39,224 crore against current assets of ₹30,571 crore. The auditor named the going-concern assessment a key audit matter.
- The company puts net debt at 3.40 times its underlying EBITDA for H1 FY27 (its own measure), up from 2.75 in FY24.

## Who owns Tata Power? (shareholding, Q2 FY27)

| Holder | % of shares |
| --- | --- |
| Promoters | 46.86% |
| Promoter shares pledged (% of promoter shares) | 0.0% |
| Foreign institutions (FII) | 10.13% |
| Indian institutions (DII) | 18.48% |
| Public | 24.53% |

Sources: S25, S26, S27, S28, S29, S30, S31, S32, S33, S34, S35, S36.

## What could go wrong

### Mundra runs on temporary orders

The 4,150 MW Mundra plant runs under government directions extended to 31 Dec 2026. Its new supply deal covers GUVNL; approvals from the other buyers were still in progress at the Q2 FY27 results. CARE says the GUVNL deal covers about 48% of the plant. [S4, S42, S37]

What to watch: New supply deals with Mundra's other buyers, and what happens after 31 Dec 2026.

### Arbitration award of USD 490 million

A Singapore tribunal held that Tata Power breached certain clauses of non-disclosure agreements with Kleros, and ordered it to pay USD 490.32 million plus interest and costs. Tata Power has appealed and made no provision, citing legal advice. [S4, S46]

What to watch: The Singapore Court of Appeal hearing listed for 19 Jan 2027.

### Rising debt

Net debt rose from ₹45,092 crore in Mar 2025 to ₹62,681 crore in Sep 2026. Interest cost was ₹5,257 crore in FY26. CARE names refinancing and interest-rate risk as weaknesses. [S11, S5, S7, S37]

What to watch: Net debt and interest cost each half year (net debt ₹62,681 crore in Sep 2026).

### Profit depends on regulators' decisions

Regulatory income swung from −₹976 crore in FY25 to +₹1,252 crore in FY26. Regulatory assets still to be recovered through tariffs were ₹8,139 crore on 31 Mar 2026. [S11, S7, S1]

What to watch: The regulatory income line in each quarterly result.

### A growing share goes to minority partners

Minority partners' share of profit rose from ₹804 crore in FY25 to ₹1,370 crore in FY26. Partners own 11.43% of the renewables arm and 49% of the Delhi and Odisha companies. [S11, S7, S2, S19]

What to watch: Profit for Tata Power shareholders against total profit each quarter.

### Building new capacity on time

Management missed its aim of nearly 7 GW of operating renewables by Mar 2026, citing transmission and right-of-way delays. Management said in the 28 Jul 2026 call it aims to cross 9 GW by Mar 2027; installed renewables were 7.2 GW in Sep 2026. [S24, S37, S22, S21, S19]

What to watch: Renewables capacity added each quarter.

## What to watch

Next: Q3 FY27 results (date not announced), Date not announced yet.

- **Mundra supply deals:** Government directions for Mundra run to 31 Dec 2026. Management said at the Q2 FY27 results (11 Nov 2026) it expects deals with the buyers other than GUVNL in that period.
- **Renewables capacity:** Installed renewables were 7.2 GW in Sep 2026. The CEO said in Jul 2026 that it would cross 9 GW by Mar 2027.
- **CEO handover:** Sanjay Banga joined the board as CEO Designate on 11 Nov 2026. He is to become CEO & MD from 1 May 2027, subject to shareholder approval.

## Sources

- S1: Integrated Annual Report FY26 (2025-26), incl. consolidated financial statements. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/annual_reports/AR_29380_TATAPOWER_2025_2026_A_16197784_10062026203510.pdf (published 10 Jun 2026)
- S2: Integrated Annual Report FY24 (2023-24), incl. consolidated financial statements. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/annual_reports/AR_24164_TATAPOWER_2023_2024_21062024194840.pdf (published 21 Jun 2024)
- S3: Integrated Annual Report FY23 (2022-23), incl. consolidated financial statements (zip on NSE). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/annual_reports/AR_21931_TATAPOWER_2022_2023_27052023145227.zip (published 27 May 2023)
- S4: Unaudited consolidated and audited standalone results Q2 FY27 (quarter and half year to 30 Sep 2026). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_11112026172001_outcome_final.pdf (published 11 Nov 2026)
- S5: Consolidated results XBRL Q2 FY27 (integrated filing). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INTEGRATED_FILING_INDAS_1756234_11112026070341_WEB.xml (published 11 Nov 2026)
- S6: Consolidated results XBRL Q1 FY27 (integrated filing). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INTEGRATED_FILING_INDAS_1702185_27072026053807_WEB.xml (published 27 Jul 2026)
- S7: Consolidated results XBRL Q4 FY26 and FY26 (integrated filing). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INTEGRATED_FILING_INDAS_1666126_12052026065920_WEB.xml (published 12 May 2026)
- S8: Consolidated results XBRL Q3 FY26 (integrated filing). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INTEGRATED_FILING_INDAS_1618185_04022026052514_WEB.xml (published 4 Feb 2026)
- S9: Consolidated results XBRL Q2 FY26 (integrated filing). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INTEGRATED_FILING_INDAS_1571448_11112025064023_WEB.xml (published 11 Nov 2025)
- S10: Consolidated results XBRL Q1 FY26 (integrated filing). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INTEGRATED_FILING_INDAS_1500277_01082025050523_WEB.xml (published 1 Aug 2025)
- S11: Consolidated results XBRL Q4 FY25 and FY25 (integrated filing). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INTEGRATED_FILING_INDAS_1438808_14052025063241_WEB.xml (published 14 May 2025)
- S12: Consolidated results XBRL Q3 FY25. NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INDAS_118595_1370400_04022025044754.xml (published 4 Feb 2025)
- S13: Consolidated results XBRL Q2 FY25. NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INDAS_114029_1294670_30102024062859.xml (published 30 Oct 2024)
- S14: Consolidated results XBRL Q1 FY25. NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INDAS_110510_1214241_06082024055132.xml (published 6 Aug 2024)
- S15: Consolidated results XBRL Q4 FY24 and FY24. NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INDAS_105471_1118265_08052024062005.xml (published 8 May 2024)
- S16: Consolidated results XBRL Q4 FY23 and FY23. NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INDAS_91195_837430_04052023063725.xml (published 4 May 2023)
- S17: Consolidated results XBRL Q4 FY22 and FY22. NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/INDAS_84051_651714_06052022062529_WEB.xml (published 6 May 2022)
- S18: Audited results Q4 FY26 and FY26 (outcome of board meeting 12 May 2026, incl. dividend recommendation). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_12052026164148_Outcome.pdf (published 12 May 2026)
- S19: Analyst presentation Q2 FY27. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_11112026173256_Analyst_Presentation_Q2_FY27.pdf (published 11 Nov 2026)
- S20: Analyst presentation Q1 FY27. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_27072026170004_Analyst_PPT.pdf (published 27 Jul 2026)
- S21: Earnings call transcript Q1 FY27 (call of 28 Jul 2026). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_31072026201434_TranscriptsQ1FY27.pdf (published 31 Jul 2026)
- S22: Earnings call transcript Q4 FY26 (call of 12 May 2026). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_15052026181403_Earning_Call_Transcript.pdf (published 15 May 2026)
- S23: Earnings call transcript Q3 FY26 (call of 4 Feb 2026). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_09022026170456_Earning_Call_Transcript.pdf (published 9 Feb 2026)
- S24: Earnings call transcript Q2 FY26 (call of 11 Nov 2025). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_16112025164458_Q2FY26_Earning_Call_Transcript.pdf (published 16 Nov 2025)
- S25: Shareholding pattern Sep 2026 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_1742704_21102026020328_WEB.xml (published 21 Oct 2026)
- S26: Shareholding pattern Jun 2026 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_1698230_21072026035332_WEB.xml (published 21 Jul 2026)
- S27: Shareholding pattern Mar 2026 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_1656901_21042026103928_WEB.xml (published 21 Apr 2026)
- S28: Shareholding pattern Dec 2025 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_1607309_21012026052838_WEB.xml (published 21 Jan 2026)
- S29: Shareholding pattern Sep 2025 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_1554672_21102025121546_WEB.xml (published 21 Oct 2025)
- S30: Shareholding pattern Jun 2025 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_1489813_21072025085405_WEB.xml (published 21 Jul 2025)
- S31: Shareholding pattern Mar 2025 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_198571_1420527_21042025104525_WEB.xml (published 21 Apr 2025)
- S32: Shareholding pattern Dec 2024 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_195430_1351769_20012025121540_WEB.xml (published 20 Jan 2025)
- S33: Shareholding pattern Sep 2024 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_192803_1277084_18102024022214_WEB.xml (published 18 Oct 2024)
- S34: Shareholding pattern Jun 2024 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_190219_1193593_19072024122008_WEB.xml (published 19 Jul 2024)
- S35: Shareholding pattern Mar 2024 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_187540_1098478_18042024044027_WEB.xml (published 18 Apr 2024)
- S36: Shareholding pattern Dec 2023 (XBRL). NSE (XBRL). https://nsearchives.nseindia.com/corporate/xbrl/SHP_184915_1028626_19012024124919_WEB.xml (published 19 Jan 2024)
- S37: CARE Ratings press release: The Tata Power Company Limited, ratings reaffirmed CARE AA+; Stable. CARE Ratings Ltd. https://www.careratings.com/upload/CompanyFiles/PR/202606120624_The_Tata_Power_Company_Limited.pdf (published 18 Jun 2026)
- S38: Business Responsibility and Sustainability Report FY26 (consolidated boundary). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_10062026204631_BRSR_FY26.pdf (published 10 Jun 2026)
- S39: NSE CM bhavcopy, 11 Nov 2026 (TATAPOWER EQ close ₹360.00). NSE. https://nsearchives.nseindia.com/content/cm/BhavCopy_NSE_CM_0_0_0_20261111_F_0000.csv.zip (published 11 Nov 2026)
- S40: Reg 30: BSR & Co. LLP appointed statutory auditors from the 108th AGM (SRBC completes second term). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_04022026174501_Statutory_auditors_appt.pdf (published 4 Feb 2026)
- S41: Reg 30: Sanjay Banga appointed Additional Director and CEO Designate; CEO & MD from 1 May 2027. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/KSTPCL_11112026190124_MD_APPT_-_Reg_30.pdf (published 11 Nov 2026)
- S42: Reg 30: Mundra Section 11 directions extended to 31 Dec 2026. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_26092026141636_Letter_to_SE_update_on_Mundra_Plant.pdf (published 26 Sep 2026)
- S43: Clarification on media reports: Gujarat cabinet approved Mundra supplementary PPA. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_20032026162219_Clarification_Letter_March_20_2026.pdf (published 20 Mar 2026)
- S44: Reg 30: board approves investment in 1,800 MW Shirwata pumped storage project. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_11112026174200_Reg_30_Capacity_Addition_Shirwata.pdf (published 11 Nov 2026)
- S45: Reg 30: Kleros arbitration, SICC dismisses challenge to awards. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_26082026185023_Reg_3026082026.pdf (published 26 Aug 2026)
- S46: Reg 30: Kleros arbitration, appeal filed, enforcement and attachment notices. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_07112026184018_reg_30_07-11-2026.pdf (published 7 Nov 2026)
- S47: Reg 30: acquisition of 100% of Ryapte Power Transmission Limited (SPV). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_30072026172400_Reg-30_Acquistion_RPTL.pdf (published 30 Jul 2026)
- S48: Reg 30: TPREL adopts new line of business, PV ingot and wafer manufacturing. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_30042026181504_Reg_30_-New_line_of_Business.pdf (published 30 Apr 2026)
- S49: Reg 30: proposed 40% stake in SPV with Druk Green Power Corporation (Bhutan). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_11112025173135_Reg_30SPVDGPCAcquisition.pdf (published 11 Nov 2025)
- S50: Reg 30: Supreme Court judgment on regulatory assets (TPDDL writ petition). NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_12082025145726_Disclosure_under_Reg_30_Supreme_Court_order_on_TPDDL.pdf (published 12 Aug 2025)
- S51: Press release Q2 FY27 results. NSE (company filing, nsearchives.nseindia.com). https://nsearchives.nseindia.com/corporate/VPTPCL_11112026173937_Press_Release.pdf (published 11 Nov 2026)