Compare · Power
NHPC vs NTPC: how their businesses differ
The same facts for both companies, in the same order, from each company's own page and filings. It is not a ranking.
How they differ
In FY26, NTPC's revenue of ₹187,385 cr was about 16 times NHPC's ₹11,615 cr (Cityfort calculation: one divided by the other).
NTPC's largest segment is Generation of energy, 94.7% of revenue in FY26.
NHPC's largest payer group is Other buyers, mainly other states' distributors, 61.3% of revenue (FY26); NTPC's largest payer group is Electricity buyers, mainly state distribution companies, 94.7% of revenue (FY26).
Neither page lists the other among its competitors.
Each company in 5 points
NHPC
1 · What it sells
NHPC sells electricity made mostly from river water: 9,021 MW of its 9,583 MW installed capacity in Nov 2026 was hydro, and FY26 revenue was ₹11,615 crore.
Sources and detail on the NHPC page2 · Who pays it
In FY26, Uttar Pradesh Power Corporation paid 15.1% of NHPC's revenue, Jammu & Kashmir's power utilities 12.3%, MP Power Management 11.2%, and other buyers, mainly state distributors, 61.3%.
Sources and detail on the NHPC page3 · What it keeps from ₹100
Of every ₹100 that came in during FY26, NHPC kept ₹25.4 as profit for shareholders, a figure that includes ₹983 crore of regulatory deferral income and a ₹1,165 crore deferred-tax credit; operating profit (EBITDA) was ₹5,238 crore.
Sources and detail on the NHPC page4 · Where the operating profit comes from
In FY26, NHPC's own stations accounted for ₹3,133 crore (74.24%) of the group's ₹4,220 crore profit and NHDC for ₹643 crore (15.25%) after intra-group eliminations, while minority partners took ₹455 crore (10.77%).
Sources and detail on the NHPC page5 · The one thing to watch
NHPC's borrowings rose from ₹52,134 crore on 31 Mar 2026 to ₹57,220 crore on 30 Sep 2026, while five of Subansiri Lower's eight units were running by 23 Oct 2026 and NHPC's Nov 2026 presentation shows the last three in Q1 FY28.
Sources and detail on the NHPC page
NTPC
1 · What it sells
NTPC sells electricity made mostly from coal: 65,224 MW of the group's 87,787 MW gross capacity on 31 Mar 2026 was coal-fired, and FY26 revenue was ₹187,385 crore.
Sources and detail on the NTPC page2 · Who pays it
In FY26, electricity buyers, mainly state power distribution companies, paid for 94.7% of NTPC's segment revenue, and buyers of its consultancy, trading, oil and gas, and coal paid 5.3%.
Sources and detail on the NTPC page3 · What it keeps from ₹100
Of every ₹100 that came in during FY26, NTPC kept ₹14.0 as profit for shareholders after ₹48.0 for fuel, a figure that nets a one-off ₹7,410 crore deferred-tax credit against a ₹7,169 crore regulatory charge; profit before tax and regulatory accounts was ₹27,134 crore.
Sources and detail on the NTPC page4 · Where the operating profit comes from
Electricity generation earned ₹40,437 crore of NTPC's ₹41,671 crore FY26 segment result, and consultancy, trading, oil and gas, and coal mining earned ₹1,234 crore.
Sources and detail on the NTPC page5 · The one thing to watch
NTPC's borrowings rose from ₹267,258 crore on 31 Mar 2026 to ₹275,634 crore on 30 Sep 2026, while the group added 2,398 MW in H1 FY27; management planned about 9,557 MW for FY27 on 23 May 2026 and on 31 Oct 2026 said it expects "close to 8 GW".
Sources and detail on the NTPC page
Where each ₹100 went
Each company's own receipt for its latest full financial year, with matching lines in the same order where both have them.
NHPC
Where ₹100 went · FY26
| Employees | ₹10.1 |
|---|---|
| Depreciation | ₹13.3 |
| Interest on borrowings | ₹9.6 |
| Generation and other running costs | ₹32.9 |
| Minority partners' share | ₹3.1 |
| Current tax | ₹5.7 |
| Kept as profit for NHPC shareholders (incl. ₹14.5 of accounting items, see note) | ₹25.4 |
| Total | ₹100 |
Money in here is more than revenue plus other income. Cityfort calculation from the FY26 annual report (S1): each line ÷ ₹14,837 crore of money in × 100. Money in is revenue (₹78.3 of each ₹100), other income (₹7.2), regulatory deferral income net of tax (₹6.6), a deferred-tax credit (₹7.9) and joint ventures' profit (under ₹0.1); the deferral income and tax credit together are ₹14.5. The deferral income is costs, such as ₹822 crore of Subansiri Lower transmission charges, that CERC rules let NHPC recover from buyers in later tariffs. The tax credit comes from re-measuring deferred tax at the rates of the new tax regime NHPC chose from FY27. Current tax (₹839 crore) is shown as its own line.
NTPC
Where ₹100 went · FY26
| Employees | ₹3.6 |
|---|---|
| Depreciation | ₹10.2 |
| Interest on borrowings | ₹7.2 |
| Fuel (mostly coal) | ₹48.0 |
| Other running costs, incl. power bought for resale | ₹16.9 |
| Tax, regulatory accounts and minority share (net) | ₹0.0 |
| Kept as profit for NTPC shareholders | ₹14.0 |
| Total | ₹100 |
Of every ₹100 that came in during FY26: revenue (₹187,385 crore), other income (₹2,414 crore) and NTPC's share of joint ventures' profit (₹2,864 crore). Tax was a net credit of ₹2,876 crore after a ₹7,410 crore deferred-tax credit for an expected move to the new tax regime. Regulatory deferral accounts (amounts to be recovered from, or returned to, buyers later) cut profit by ₹2,464 crore, and minority partners took ₹493 crore (Cityfort calculation: ₹27,546 crore total profit − ₹27,053 crore for shareholders (S1)). The receipt shows the three together.
Line items differ because each company groups its costs its own way in its filings. Only on NHPC's receipt: Generation and other running costs; Current tax; Minority partners' share; Kept as profit for NHPC shareholders (incl. ₹14.5 of accounting items, see note). Only on NTPC's receipt: Fuel (mostly coal); Other running costs, incl. power bought for resale; Tax, regulatory accounts and minority share (net); Kept as profit for NTPC shareholders.
Revenue, net profit and free cash flow
Up to five financial years for each company, drawn on one shared scale per measure. Amounts in ₹ crore as each company reports them.
Revenue
NHPC
NTPC
See the numbers
Net profit
NHPC
NTPC
See the numbers
Free cash flow
NHPC
NTPC
See the numbers
Growth and net margin, FY22 to FY26
Worked out over the years both pages cover, so the two growth figures use the same span. Net margin is net profit as a share of revenue, as on each page.
NHPC
- Revenue, per year
- +6.2%
- Net profit, per year
- +1.7%
NTPC
- Revenue, per year
- +9.0%
- Net profit, per year
- +12.9%
Cityfort calculation: compound growth per year from FY22 to FY26 (4 years), from each page's yearly numbers, as reported.
Net margin by year
Latest quarter, against the same quarter a year earlier
Each page's latest quarter as reported; the change is a Cityfort calculation.
NHPC
Q2 FY27, the quarter to 30 Sep 2026, against Q2 FY26
| Measure | Q2 FY27 | Q2 FY26 | Change |
|---|---|---|---|
| Revenue | ₹4,483 cr | ₹3,365 cr | +33.2% |
| Net profit | ₹1,549 cr | ₹1,021 cr | +51.7% |
NTPC
Q2 FY27, the quarter to 30 Sep 2026, against Q2 FY26
| Measure | Q2 FY27 | Q2 FY26 | Change |
|---|---|---|---|
| Revenue | ₹54,270 cr | ₹44,784 cr | +21.2% |
| Net profit | ₹7,030 cr | ₹5,067 cr | +38.7% |
Who pays each company
NHPC
- Uttar Pradesh Power Corporation · 15.1% of revenueUttar Pradesh's state power company: 15.1% of NHPC's FY26 revenue (₹1,754 crore).
- Jammu & Kashmir power utilities · 12.3% of revenuePower Development Department, J&K Govt, and JK Power Corporation: 12.3% of FY26 revenue (₹1,431 crore).
- MP Power Management Company · 11.2% of revenueMadhya Pradesh's state power buyer: 11.2% of FY26 revenue (₹1,305 crore).
- Other buyers, mainly other states' distributors · 61.3% of revenue61.3% of FY26 revenue (Cityfort calculation: 100% − 38.66% for the three largest customers (S1)). ICRA describes NHPC's buyers as mainly state distribution utilities.
NTPC
- Electricity buyers, mainly state distribution companies · 94.7% of revenueState power distribution companies (discoms), state electricity boards and power departments buy most of NTPC's power under long-term contracts; Indian Railways and private distributors buy some too. Share = generation segment's share of FY26 segment revenue.
- Buyers of consultancy, trading, oil and gas, and coal · 5.3% of revenueNTPC's 'others' segment: consultancy, power trading, oil and gas, and coal mining. Share = the segment's share of FY26 segment revenue.
Revenue by segment
NHPC
Not on the NHPC page.
NTPC
FY26
| Segment | Revenue | Share |
|---|---|---|
| Generation of energy | ₹175,730 cr | 94.7% |
| Others | ₹9,745 cr | 5.3% |
Sources: NTPC S1
Borrowings and cash
NHPC
- Borrowings
- ₹57,220 cr
- Cash and investments
- ₹4,645 cr
On 30 Sep 2026.
On 30 Sep 2026 NHPC's net debt of ₹52,575 crore was about 16 times its FY26 operating cash flow (Cityfort calculation: ₹52,575 ÷ ₹3,294 crore (S5, S1)).
NTPC
- Borrowings
- ₹275,634 cr
- Cash and investments
- ₹7,763 cr
On 30 Sep 2026.
On 30 Sep 2026 NTPC's net debt of ₹267,870 crore was about 5.3 times its FY26 operating cash flow (Cityfort calculation: ₹267,870 ÷ ₹50,902 crore (S7, S1)).
Who owns each company
NHPC
- Promoters: 61.4%
- Foreign institutional investors (FIIs): 13.2%
- Indian institutions (DIIs): 14.3%
- Public: 10.0%
- Companies controlled by central or state governments: 1.1%
- Pledged: 0.0% of the promoter holding.
- Shareholding pattern at the end of Q2 FY27.
NTPC
- Promoters: 51.1%
- Foreign institutional investors (FIIs): 16.3%
- Indian institutions (DIIs): 29.4%
- Public: 3.2%
- Pledged: 0.0% of the promoter holding.
- Shareholding pattern at the end of Q1 FY27.
Sources: NHPC S28, S27, S26, S25, S24, S23, S22, S21, S20, S19, S18, S29 · NTPC S30, S29, S28, S27, S26, S25, S24, S23, S22, S21, S20
What protects each business
What each page lists as protecting the business from competitors, each with its written reason. These describe business traits, not the share.
NHPC
- Scale in hydropower
NHPC's stations were 16.85% of India's installed hydro capacity (8,771 of 52,065 MW, CEA data for 30 Sep 2026, quoted by NHPC). ICRA calls it the country's largest hydropower company.
- Regulated cost-plus tariffs
CERC tariffs cover return on equity, depreciation, interest, operation and maintenance, and working-capital interest; currency changes and taxes are also recoverable from buyers.
- Government backing
The central government held 61.39% in Sep 2026, and ICRA notes long-term loans from the government at concessional rates for some Jammu & Kashmir projects.
NTPC
- Scale
CARE puts the group's capacity at 89.1 GW, about 17% of India's 533 GW of installed capacity.
- Regulated two-part tariffs
CARE says the capacity charge, including a post-tax return on equity, is fully recovered when plants are available 85% of the time. Standalone coal plants were available 90.12% of the time in FY26.
- Cost of borrowing
NTPC is rated CARE AAA; Stable and IND AAA/Stable. Management put its weighted average borrowing rate at 5.72% in H1 FY27.
- Payment security
Sales are backed by letters of credit and tri-partite agreements between the central government, RBI and states, valid till Oct 2016. The government approved them for "another period of 10 years", and 29 of 31 states and union territories had signed. Late-payment surcharge rules of June 2022 also apply.
- Own coal mines
NTPC sourced 43.50 million tonnes of coal from its captive mines in FY26; the mines are now held by NTPC Mining Ltd.
Sources: NHPC S11, S29, S1, S28 · NTPC S17, S15, S18, S10, S1, S8
Where growth could come from
Each page's growth drivers. The status compares progress with what the company itself said it would do; it is not a view on the share.
NHPC
- Subansiri Lower (2,000 MW) · Mixed: partly on track1,250 of 2,000 MW running (23 Oct 2026)
- Parbati-II (800 MW) · Working: on track against what the company said₹553 crore of Q2 FY27 sales, from ₹218 crore
- Subsidiary projects in Jammu & Kashmir · Behind: behind the company's own plan3,014 MW under construction (Nov 2026 presentation)
- Solar plants · Early: too early to judge1,190 MW under construction (Nov 2026)
- Large new hydro projects · Early: too early to judgeDibang 2,880 MW, due Q4 FY32
NTPC
- Solar and wind (NTPC Green Energy) · Mixed: partly on track11,577 MW (Mar 2026), from 3,528 MW (Mar 2024)
- New coal plants · Working: on track against what the company said17 GW of coal under construction (Oct 2026)
- Hydro · Working: on track against what the company said4,475 MW (Mar 2026), from 3,725 MW
- Nuclear · Early: too early to judge2,800 MW tender (15 Jul 2026)
- Bought plants: Sinnar · Early: too early to judge1,350 MW (Feb 2026)
- Data centres · New: recently announced100 MW planned
Sources: NHPC S11, S31, S5, S1, S13, S29, S34 · NTPC S1, S10, S11, S36
Dividends, buybacks, auditor and credit rating
Dividends per share and buybacks for up to five years, the statutory auditor and the latest credit rating, as each page records them.
NHPC
- Dividends per shareFY23: ₹1.85 · FY24: ₹1.90 · FY25: ₹1.91 · FY26: ₹1.61
- BuybacksNone on the page in the last five years.
- AuditorJoint statutory auditors appointed by the C&AG for FY26: S N Dhawan & Co. LLP, S Jaykishan and Dharam Raj & Co.
- Credit ratingICRA: [ICRA]AAA, outlook Stable (1 Jul 2026)
NTPC
- Dividends per shareFY22: ₹7.00 · FY23: ₹7.25 · FY24: ₹7.75 · FY25: ₹8.35 · FY26: ₹9.00
- BuybacksNone on the page in the last five years.
- AuditorJoint auditors appointed by the C&AG each year: six firms for FY26 (Agasti & Associates, Goyal Parul & Co., J K S S & Associates, M. C. Bhandari & Co., S.N. Kapur & Associates, Vinod Kumar & Associates)
- Credit ratingCARE Ratings: CARE AAA, outlook Stable (22 May 2026)
Sources: NHPC S4, S3, S2, S1, S29 · NTPC S5, S4, S3, S2, S1, S17
Risks only one page tracks
Risks whose type the other company's page does not list. Both pages track risks of these types: execution, regulation, debt, customer or supplier concentration. Every risk is on each company's page.
NHPC
- Floods, landslides and tunnel hazards (other)Teesta-V (510 MW) was fully shut from 4 Oct 2023 after a glacial lake flood and an upstream dam breach; all three units were back in commercial operation from 16 Jul 2026. On 20 Jul 2026 a suspected methane burst in the Teesta-VI tunnel trapped 25 people; NHPC reported 10 casualties at the time.
NTPC
- Coal supply and fuel costs (commodity costs)Coal plants were 65,224 MW of the group's 87,787 MW gross capacity on 31 Mar 2026, and fuel cost ₹92,490 crore in FY26. CARE says the energy charge passes fuel costs to buyers only within CERC's norms. Standalone coal plants ran at 72.04% of capacity (PLF) in FY26, down from 77.44% in FY25.
- Leadership and board appointments (governance)CMD Gurdeep Singh's tenure was extended for six months from 1 Aug 2026, or until a regular CMD takes charge. BSE and NSE fined NTPC over board composition for the quarters ended 31 Mar and 30 Jun 2026; NTPC said the President of India appoints its directors.
Sources: NHPC S1, S33, S32 · NTPC S1, S17, S15, S7, S35, S32, S33
Key facts
- How does NHPC make money compared with NTPC?
- NHPC's revenue by payer: Uttar Pradesh Power Corporation 15.1%, Jammu & Kashmir power utilities 12.3%, MP Power Management Company 11.2%, Other buyers, mainly other states' distributors 61.3%. NTPC's revenue by segment in FY26: Generation of energy 94.7%, Others 5.3%.
- Which is bigger by revenue, NHPC or NTPC?
- NHPC reported revenue of ₹11,615 cr in FY26, and NTPC reported revenue of ₹187,385 cr in FY26.
- How much net profit did NHPC and NTPC report?
- NHPC reported a net profit of ₹3,766 cr in FY26, and NTPC reported ₹27,053 cr in FY26.
- How much of every ₹100 did NHPC and NTPC keep as profit?
- NHPC kept ₹25.4 of every ₹100 that came in during FY26, and NTPC kept ₹14.0 in FY26 (Cityfort calculation from each company's annual report).
- How much do NHPC and NTPC owe, and how much cash do they hold?
- NHPC had borrowings of ₹57,220 cr and cash and investments of ₹4,645 cr on 30 Sep 2026. NTPC had borrowings of ₹275,634 cr and cash and investments of ₹7,763 cr on 30 Sep 2026.
- Who owns NHPC and NTPC?
- Promoters held 61.4% of NHPC's shares at the end of Q2 FY27, with none of it pledged. Promoters held 51.1% of NTPC's shares at the end of Q1 FY27, with none of it pledged. Both come from the shareholding patterns the companies filed with NSE and BSE.
- When do NHPC's and NTPC's financial years end?
- NHPC and NTPC both use the Indian financial year, April to March. The latest full year is FY26 on the NHPC page and FY26 on the NTPC page.
Sources: NHPC S4, S3, S2, S1, S29, S5 · NTPC S4, S3, S2, S1, S19, S17, S7, S10
Built from each company's page. NHPC updated 12 Nov 2026; NTPC updated 11 Nov 2026.
Sources
NHPC
- S1Annual Report FY26 (incl. BRSR), NHPC Ltd (company IR site; same filing made to NSE/BSE), 5 Aug 2026
- S2Annual Report FY25, NHPC Ltd (company IR site; same filing made to NSE/BSE), 6 Aug 2025
- S3Annual Report FY24 (IR copy uploaded 29 Jul 2025; 48th AGM 28 Aug 2024), NHPC Ltd (company IR site; same filing made to NSE/BSE), 29 Jul 2025
- S4Annual Report FY23 (IR copy uploaded 29 Jul 2025), NHPC Ltd (company IR site; same filing made to NSE/BSE), 29 Jul 2025
- S5Unaudited financial results Q2 and H1 FY27 (standalone and consolidated), NHPC Ltd (company IR site; same filing made to NSE/BSE), 4 Nov 2026
- S6Unaudited financial results Q1 FY27 (standalone and consolidated), NHPC Ltd (company IR site; same filing made to NSE/BSE), 4 Aug 2026
- S7Unaudited financial results Q3 and 9M FY26, NHPC Ltd (company IR site; same filing made to NSE/BSE), 4 Feb 2026
- S8Unaudited financial results Q2 and H1 FY26, NHPC Ltd (company IR site; same filing made to NSE/BSE), 6 Nov 2025
- S11Investor Presentation September 2026, NHPC Ltd (company IR site; same filing made to NSE/BSE), 4 Nov 2026
- S13Transcript, Q4 FY26 earnings call (18 May 2026), NHPC Ltd (company IR site; same filing made to NSE/BSE), 25 May 2026
- S18Shareholding pattern, quarter ended 31 Mar 2024, NHPC Ltd (company IR site; same filing made to NSE/BSE), 19 Apr 2024
- S19Shareholding pattern, quarter ended 30 Jun 2024, NHPC Ltd (company IR site; same filing made to NSE/BSE), 17 Jul 2024
- S20Shareholding pattern, quarter ended 30 Sep 2024, NHPC Ltd (company IR site; same filing made to NSE/BSE), 23 Oct 2024
- S21Shareholding pattern, quarter ended 31 Dec 2024, NHPC Ltd (company IR site; same filing made to NSE/BSE), 17 Jan 2025
- S22Shareholding pattern, quarter ended 31 Mar 2025, NHPC Ltd (company IR site; same filing made to NSE/BSE), 17 Apr 2025
- S23Shareholding pattern, quarter ended 30 Jun 2025, NHPC Ltd (company IR site; same filing made to NSE/BSE), 18 Jul 2025
- S24Shareholding pattern, quarter ended 30 Sep 2025, NHPC Ltd (company IR site; same filing made to NSE/BSE), 16 Oct 2025
- S25Shareholding pattern, quarter ended 31 Dec 2025, NHPC Ltd (company IR site; same filing made to NSE/BSE), 12 Jan 2026
- S26Shareholding pattern, quarter ended 31 Mar 2026, NHPC Ltd (company IR site; same filing made to NSE/BSE), 21 Apr 2026
- S27Shareholding pattern, quarter ended 30 Jun 2026, NHPC Ltd (company IR site; same filing made to NSE/BSE), 20 Jul 2026
- S28Shareholding pattern, quarter ended 30 Sep 2026, NHPC Ltd (company IR site; same filing made to NSE/BSE), 15 Oct 2026
- S29ICRA rationale: NHPC Limited, rating reaffirmed [ICRA]AAA (Stable), ICRA Ltd, 1 Jul 2026
- S31Update on commissioning of Subansiri Lower HE Project (Unit 5 COD 23 Oct 2026), NHPC Ltd (company IR site; same filing made to NSE/BSE), 21 Oct 2026
- S32Press release: Incident at Teesta VI HE Project (500 MW), Sikkim, NHPC Ltd (company IR site; same filing made to NSE/BSE), 21 Jul 2026
- S33Resumption of commercial operation of last unit (170 MW) of Teesta-V Power Station, NHPC Ltd (company IR site; same filing made to NSE/BSE), 16 Jul 2026
- S34Investment approval for Kamala Hydro Electric Project (1720 MW), NHPC Ltd (company IR site; same filing made to NSE/BSE), 8 Apr 2026
NTPC
- S1Integrated Annual Report FY26, NTPC Ltd (company IR site; same document filed with BSE/NSE), 4 Aug 2026
- S2Integrated Annual Report FY25, NTPC Ltd (company IR site; same document filed with BSE/NSE), 8 Aug 2025
- S3Annual Report FY24, NTPC Ltd (company IR site; same document filed with BSE/NSE), 5 Aug 2024
- S447th Annual Report FY23, NTPC Ltd (company IR site; same document filed with BSE/NSE), 30 Aug 2023
- S5Annual Report FY22, NTPC Ltd (company IR site; same document filed with BSE/NSE), 4 Aug 2022
- S7Unaudited financial results Q2 FY27 and interim dividend (board outcome 31 Oct 2026), NTPC Ltd (filed with BSE), 31 Oct 2026
- S8Unaudited financial results Q1 FY27 (board outcome 24 Jul 2026), NTPC Ltd (filed with BSE), 24 Jul 2026
- S9Unaudited financial results Q3 FY26 (board outcome 30 Jan 2026), NTPC Ltd (company IR site; same document filed with BSE/NSE), 30 Jan 2026
- S10Transcript of Q2 FY27 conference call held 31 Oct 2026, NTPC Ltd (filed with BSE), 6 Nov 2026
- S11Transcript of 22nd Annual Analysts and Institutional Investors Meet held 27 Jul 2026, NTPC Ltd (filed with BSE), 2 Aug 2026
- S15Operational & Financial Snapshot Q4 FY26, NTPC Ltd (company IR site; same document filed with BSE/NSE), 23 May 2026
- S17CARE Ratings press release: NTPC Limited, ratings reaffirmed CARE AAA; Stable, CARE Ratings Ltd, 22 May 2026
- S18Intimation of credit rating: India Ratings affirms IND AAA/Stable (press release 16 Feb 2026), NTPC Ltd (company IR site; same document filed with BSE/NSE), 17 Feb 2026
- S19Business Responsibility and Sustainability Report FY26, NTPC Ltd (filed with NSE), 4 Aug 2026
- S20Shareholding pattern, quarter ended 30 Jun 2026 (BSE XBRL rendering), BSE Ltd (filed by NTPC), 14 Jul 2026
- S21Shareholding pattern, quarter ended 31 Mar 2026, NTPC Ltd (company IR site; same document filed with BSE/NSE), 15 Apr 2026
- S22Shareholding pattern, quarter ended 31 Dec 2025, NTPC Ltd (company IR site; same document filed with BSE/NSE), 14 Jan 2026
- S23Shareholding pattern, quarter ended 30 Sep 2025, NTPC Ltd (company IR site; same document filed with BSE/NSE), 17 Oct 2025
- S24Shareholding pattern, quarter ended 30 Jun 2025, NTPC Ltd (company IR site; same document filed with BSE/NSE), 17 Jul 2025
- S25Shareholding pattern, quarter ended 31 Mar 2025, NTPC Ltd (company IR site; same document filed with BSE/NSE), 22 Apr 2025
- S26Shareholding pattern, quarter ended 31 Dec 2024, NTPC Ltd (company IR site; same document filed with BSE/NSE), 24 Jan 2025
- S27Shareholding pattern, quarter ended 30 Sep 2024, NTPC Ltd (company IR site; same document filed with BSE/NSE), 5 Nov 2024
- S28Shareholding pattern, quarter ended 30 Jun 2024, NTPC Ltd (company IR site; same document filed with BSE/NSE), 17 Jul 2024
- S29Shareholding pattern, quarter ended 31 Mar 2024, NTPC Ltd (company IR site; same document filed with BSE/NSE), 16 Apr 2024
- S30Shareholding pattern, quarter ended 31 Dec 2023, NTPC Ltd (company IR site; same document filed with BSE/NSE), 17 Jan 2024
- S32Imposition of fine by BSE & NSE, quarter ended 31 Mar 2026 (Reg 17(1)), NTPC Ltd (company IR site; same document filed with BSE/NSE), 27 May 2026
- S33Imposition of fine by BSE & NSE, quarter ended 30 Jun 2026 (Reg 17(1)), NTPC Ltd (company IR site; same document filed with BSE/NSE), 26 Aug 2026
- S35Extension of tenure of Chairman & Managing Director, NTPC Ltd (company IR site; same document filed with BSE/NSE), 28 Jul 2026
- S36Completion of acquisition of Sinnar Thermal Power Ltd by MAHAGENCO-NTPC consortium, NTPC Ltd (company IR site; same document filed with BSE/NSE), 25 Feb 2026
Disclaimer
For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.
Investing in securities involves risk, including loss of capital. Before making any investment decision, do your own research and consider consulting a SEBI-registered investment adviser.
Cityfort, its owners and contributors may or may not hold securities of companies covered. Content is not an offer or solicitation to buy or sell any security.
Read the full disclaimerHide the full disclaimer
Cityfort publishes educational content that explains how listed companies work. Cityfort is not registered with the Securities and Exchange Board of India (SEBI) as an Investment Adviser or Research Analyst and does not provide investment advice, recommendations, ratings, price targets or any opinion on whether to buy, sell or hold any security.
All information is taken from publicly available sources, mainly company filings on BSE and NSE, which are listed on each page with dates. We work to keep it accurate and correct errors publicly, but we do not guarantee that it is complete, accurate or up to date. Any market price or price-based ratio shown is dated, may be out of date by the time you read it, and is included only to explain concepts.
Statements by company management are reported as statements, with their date and source; they are not our forecasts.