Skip to content
New: 30 more Indian companies explained, from Ather and Pine Labs to IDBI Bank

Power · NSE: NHPC · BSE: 533098

NHPC: how the business works

NHPC builds and runs hydropower stations and sells the electricity in bulk, mostly to state power distributors; its FY26 revenue was ₹11,615 crore.

Follow NHPC

Email me when NHPC's page is updated after results.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

NHPC Limited · Faridabad, Haryana · Founded 1975

Updated for Q2 FY27 · checked

Revenue, FY26
₹11,615 cr
Profit to shareholders, FY26
₹3,766 cr
Installed capacity, Nov 2026 (company figure)
9,583 MW
Founded
1975
Promoter: President of India, Sep 2026
61.39%

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

The short version

NHPC in 5 points

  1. 1 · What it sells

    NHPC sells electricity made mostly from river water: 9,021 MW of its 9,583 MW installed capacity in Nov 2026 was hydro, and FY26 revenue was ₹11,615 crore.

    More: what it sells

  2. 2 · Who pays it

    In FY26, Uttar Pradesh Power Corporation paid 15.1% of NHPC's revenue, Jammu & Kashmir's power utilities 12.3%, MP Power Management 11.2%, and other buyers, mainly state distributors, 61.3%.

    More: who pays it

  3. 3 · What it keeps from ₹100

    Of every ₹100 that came in during FY26, NHPC kept ₹25.4 as profit for shareholders, a figure that includes ₹983 crore of regulatory deferral income and a ₹1,165 crore deferred-tax credit; operating profit (EBITDA) was ₹5,238 crore.

    More: what it keeps from ₹100

  4. 4 · Where the operating profit comes from

    In FY26, NHPC's own stations accounted for ₹3,133 crore (74.24%) of the group's ₹4,220 crore profit and NHDC for ₹643 crore (15.25%) after intra-group eliminations, while minority partners took ₹455 crore (10.77%).

    More: where the operating profit comes from

  5. 5 · The one thing to watch

    NHPC's borrowings rose from ₹52,134 crore on 31 Mar 2026 to ₹57,220 crore on 30 Sep 2026, while five of Subansiri Lower's eight units were running by 23 Oct 2026 and NHPC's Nov 2026 presentation shows the last three in Q1 FY28.

    More: the one thing to watch

Sources: From NHPC's FY26 annual report, its Q2 FY27 results and Nov 2026 presentation, and ICRA's Jul 2026 rating report · checked

01Where the money goes · FY26

Where does ₹100 of NHPC's money go?

Of every ₹100 that came in (revenue plus other income), this is where it went.

NHPC · FY26

Receipt for every ₹100

Where ₹100 of NHPC's money went in FY26
Generation and other running costs₹32.9
Employees₹10.1
Depreciation₹13.3
Interest on borrowings₹9.6
Current tax₹5.7
Minority partners' share₹3.1
Kept as profit for NHPC shareholders (incl. ₹14.5 of accounting items, see note)₹25.4
Total₹100

Each line = amount ÷ total money in × 100. Lines may not add to exactly ₹100 because of rounding.

How this is worked out

Money in here is more than revenue plus other income. Cityfort calculation from the FY26 annual report (S1): each line ÷ ₹14,837 crore of money in × 100. Money in is revenue (₹78.3 of each ₹100), other income (₹7.2), regulatory deferral income net of tax (₹6.6), a deferred-tax credit (₹7.9) and joint ventures' profit (under ₹0.1); the deferral income and tax credit together are ₹14.5. The deferral income is costs, such as ₹822 crore of Subansiri Lower transmission charges, that CERC rules let NHPC recover from buyers in later tariffs. The tax credit comes from re-measuring deferred tax at the rates of the new tax regime NHPC chose from FY27. Current tax (₹839 crore) is shown as its own line.

Save this receipt as an image

Embed this receipt or the key numbers

Paste this code into a blog or website to show the card you choose, with a link back to this page.

Each week: the next company due to report results, explained in 5 points.

We'll email you once a week with what changed on Cityfort. Facts only, no tips. Unsubscribe any time.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

02The business in one line

What does NHPC do?

State power distributors pay NHPC for hydropower at tariffs set by the regulator; of every ₹100 that comes in (including ₹14.5 of accounting items), generation and other running costs take ₹32.9 and ₹25.4 is profit for shareholders.

  • The regulator CERC fixes each station's annual charges from five parts: return on equity, depreciation, interest on loans, operation and maintenance, and interest on working capital.
  • NHPC's borrowings rose from ₹39,434 crore on 31 Mar 2025 to ₹57,220 crore on 30 Sep 2026, and 8,954 MW of projects were under construction in Nov 2026.

03Who pays it

Who pays NHPC?

  • Uttar Pradesh Power Corporation

    15.1%

    of revenue

    Uttar Pradesh's state power company: 15.1% of NHPC's FY26 revenue (₹1,754 crore).

  • Jammu & Kashmir power utilities

    12.3%

    of revenue

    Power Development Department, J&K Govt, and JK Power Corporation: 12.3% of FY26 revenue (₹1,431 crore).

  • MP Power Management Company

    11.2%

    of revenue

    Madhya Pradesh's state power buyer: 11.2% of FY26 revenue (₹1,305 crore).

  • Other buyers, mainly other states' distributors

    61.3%

    of revenue

    61.3% of FY26 revenue (Cityfort calculation: 100% − 38.66% for the three largest customers (S1)). ICRA describes NHPC's buyers as mainly state distribution utilities.

  • Uttar Pradesh Power Corporation15.1%
  • Jammu & Kashmir power utilities12.3%
  • MP Power Management Company11.2%
  • Other buyers, mainly other states' distributors61.3%

Customer concentration

Three customers each gave NHPC more than 10% of FY26 revenue, 38.66% together (₹4,491 crore). On 30 Sep 2026 the five largest debtors were J&K (₹700 crore), Uttar Pradesh (₹668 crore), Rajasthan (₹657 crore, of which ₹252 crore was more than 45 days old), Punjab (₹394 crore) and Madhya Pradesh (₹382 crore). ICRA says a tripartite agreement substantially mitigates the counterparty risk.

Largest customer
15%

04How it makes money

How does NHPC make money?

Regulated returns: CERC sets each station's tariff to cover its costs plus a return on the equity invested in it.

CERC fixes annual charges from return on equity, depreciation, interest, operation and maintenance, and working-capital interest. ICRA says full recovery depends on meeting a normative availability level, with incentives above it and for generation beyond design energy. ICRA put NHPC's regulated equity at ₹18,309 crore in FY26.

Electricity generated, million units (consolidated)

27,13929,600

FY22 to FY26

  1. NHPC builds a station with borrowed money and its own equity.
  2. CERC approves the capital cost and sets the tariff for a five-year block.
  3. Buyers, mostly state distributors, pay annual charges that include a return on equity.
  4. Meeting availability norms recovers fixed costs; doing better earns incentives.
  5. Profit and new loans fund the next projects.

↺ Step 5 feeds back into step 1.

05The numbers · Consolidated · ₹ crore

How has NHPC done?

Revenue

₹11,615 crFY26

Revenue fell from ₹10,607 crore in FY23 to ₹9,631 crore in FY24, then rose to ₹11,615 crore in FY26; Q2 FY27 revenue was ₹4,483 crore against ₹3,365 crore a year earlier.

₹ crore

See the numbers
Revenue (₹ crore)
PeriodRevenue (₹ cr)
FY22₹9,144
FY23₹10,607
FY24₹9,631
FY25₹10,380
FY26₹11,615
Q3 FY25₹2,287
Q4 FY25₹2,347
Q1 FY26₹3,214
Q2 FY26₹3,365
Q3 FY26₹2,221
Q4 FY26₹2,816
Q1 FY27₹3,808
Q2 FY27₹4,483

Net profit

₹3,766 crFY26

Profit for shareholders ranged from ₹3,007 crore (FY25) to ₹3,903 crore (FY23); in Q3 FY26 a ₹1,176 crore regulatory deferral credit turned an ₹855 crore loss before it into a ₹321 crore profit (₹219 crore for shareholders).

₹ crore

See the numbers
Net profit (₹ crore)
PeriodNet profit (₹ cr)EPS (₹)
FY22₹3,524–
FY23₹3,903–
FY24₹3,596–
FY25₹3,007₹2.99
FY26₹3,766₹3.75
Q3 FY25₹231–
Q4 FY25₹854–
Q1 FY26₹1,065–
Q2 FY26₹1,021–
Q3 FY26₹219–
Q4 FY26₹1,460–
Q1 FY27₹1,096–
Q2 FY27₹1,549–

Net profit for every ₹100 of revenue

₹32.4FY26

EBITDA per ₹100 of revenue (Cityfort calculation: profit before tax and regulatory deferral movements + interest + depreciation − other income (S1–S4)) fell from ₹59.0 in FY23 to ₹45.1 in FY26, a year whose costs included ₹822 crore of Subansiri Lower transmission charges offset in the deferral account.

Net margin: ₹ of net profit per ₹100 of revenue

See the numbers
Net profit for every ₹100 of revenue (Net margin: ₹ of net profit per ₹100 of revenue)
YearNet marginEBITDA margin
FY2238.5%56.7%
FY2336.8%59.0%
FY2437.3%53.8%
FY2529.0%54.3%
FY2632.4%45.1%

Free cash flow

−₹8,279 crFY26

Free cash flow (operating cash flow minus capex) was −₹8,279 crore in FY26, with capex of ₹11,572 crore against operating cash flow of ₹3,294 crore.

₹ crore · cash from operations minus spending on plants and equipment

See the numbers
Free cash flow (₹ crore · cash from operations minus spending on plants and equipment)
YearCash from operationsCapital spendingFree cash flow
FY22₹4,590₹3,701₹888
FY23₹4,705₹4,975−₹271
FY24₹7,252₹6,969₹283
FY25₹5,026₹8,851−₹3,825
FY26₹3,294₹11,572−₹8,279
See all yearly numbers
NHPC annual financials, FY22–FY26, ₹ crore
YearRevenueEBITDANet profitEPS (₹)Net income, total (₹ cr)Operating cashCapexFree cash
FY22₹9,144₹5,186₹3,524–₹3,774₹4,590₹3,701₹888
FY23 (restated)₹10,607₹6,263₹3,903–₹4,261₹4,705₹4,975−₹271
FY24 (restated)₹9,631₹5,185₹3,596–₹4,000₹7,252₹6,969₹283
FY25 (restated)₹10,380₹5,637₹3,007₹2.99₹3,412₹5,026₹8,851−₹3,825
FY26₹11,615₹5,238₹3,766₹3.75₹4,220₹3,294₹11,572−₹8,279

EBITDA = profit before interest, tax and wear-and-tear of assets. Financial year runs April to March (March year end). Net profit is the share belonging to the company's owners. Total net income differs from net profit to the company's owners: Total profit includes the share of minority partners in subsidiaries, mostly NHDC.

06Who runs it

Who runs NHPC, and did they deliver?

  • Bhupender Gupta

    Chairman & Managing Director · since 2025

    CMD from 4 Sep 2025; also holds additional charge as CMD of SJVN Ltd since 1 May 2025.

  • Mahesh Kumar Sharma

    Director (Finance) and Chief Financial Officer

  • Sanjay Kumar Singh

    Director (Projects)

    Gave the opening remarks on the Q4 FY26 call (18 May 2026).

What they said, and what happened

2 missed · 1 too early to tell

  1. Said on 8 Nov 2024

    R.K. Chaudhary, then CMD, said NHPC hoped to commission three Subansiri Lower units by March 2025 "and rest of the units one by one by May'26".

    What happened

    The first three units started commercial operation on 23 Dec 2025, 1 Feb 2026 and 20 Mar 2026, and the fifth on 23 Oct 2026. The Nov 2026 presentation shows the last three in Q1 FY28.

    Missed
  2. Said on 21 May 2025

    R.K. Chaudhary, then CMD, said restoration of Teesta-V, shut since the Oct 2023 flood, was "expected to be completed by January'26".

    What happened

    All three Teesta-V units resumed commercial generation from 16 Jul 2026.

    Missed
  3. Said on 18 May 2026

    Sanjay Kumar Singh, Director (Projects), said the remaining four Subansiri Lower units were "expected to be commissioned one-by-one till March'27".

    What happened

    Unit 5 started commercial operation on 23 Oct 2026. NHPC's 4 Nov 2026 presentation shows the next three units in Q1 FY28 (Apr–Jun 2027).

    Too early to tell

07What could go wrong

What could go wrong for NHPC?

  • Execution

    Delays and cost overruns on big projects

    Subansiri Lower was approved at ₹6,285 crore (Dec 2002 prices) and is now expected to cost ₹30,072 crore. In Nov 2024 management expected it complete by May 2026; the Nov 2026 presentation shows the last three units in Q1 FY28. ICRA says further lapses on hydro projects cannot be ruled out.

    Watch Commercial operation of Subansiri Lower's last three units, and Pakal Dul (Q1 FY28) and Kiru (Q4 FY27).

  • Regulation

    Waiting for CERC tariff decisions

    Subansiri Lower and Parbati-II revenue is booked provisionally until CERC issues final tariffs. ICRA says timely CERC approval of capital costs is key, and any material disallowance could hit returns; stricter future tariff norms, such as a lower return on equity, could cut profit.

    Watch CERC's final tariff orders for Subansiri Lower and Parbati-II.

  • Debt

    Rising debt

    Borrowings rose from ₹39,434 crore on 31 Mar 2025 to ₹57,220 crore on 30 Sep 2026. ICRA put FY26 total debt at 9.99 times operating profit, against 7.12 in FY25, and said leverage will stay high with capex of ₹13,000–15,000 crore a year.

    Watch Borrowings each quarter against the ₹15,000 crore FY27 capex target.

  • Concentration

    Payments from state distributors

    Three state buyers gave NHPC 38.66% of FY26 revenue. ICRA names counterparty risk from state distribution utilities with relatively weak credit profiles, and says the tripartite agreement is due for renewal for some states in FY27.

    Watch Trade receivables (₹4,283 crore on 30 Sep 2026, ₹290 crore over 45 days).

  • Other

    Floods, landslides and tunnel hazards

    Teesta-V (510 MW) was fully shut from 4 Oct 2023 after a glacial lake flood and an upstream dam breach; all three units were back in commercial operation from 16 Jul 2026. On 20 Jul 2026 a suspected methane burst in the Teesta-VI tunnel trapped 25 people; NHPC reported 10 casualties at the time.

    Watch NHPC said a detailed investigation will be undertaken to find the cause of the Teesta-VI incident.

  • Regulation

    Profit depends on regulatory accounting

    Regulatory deferral movements were 23.3% of FY26 profit (Cityfort calculation: ₹983 ÷ ₹4,220 crore (S1)). The balances to be recovered from buyers were ₹8,818 crore on 30 Sep 2026. NHPC names demand risk and regulatory risk for recovering the Subansiri Lower amounts.

    Watch Regulatory deferral debit balances each half-year.

08Supporters and critics

What do supporters and critics point to?

Facts each side points to. We don't say which side is right.

What supporters point to

  • ICRA reaffirmed NHPC's [ICRA]AAA (Stable) rating on 1 Jul 2026, citing government ownership and the regulated cost-plus tariff framework.
  • Q2 FY27 revenue was ₹4,483 crore against ₹3,365 crore a year earlier, and H1 FY27 hydro generation was 23,132 MU against 20,491 MU.
  • Five of Subansiri Lower's eight units (1,250 MW) were running by 23 Oct 2026, and it generated 3,083 MU in H1 FY27, the most of any NHPC station.
  • NHPC's stations were 16.85% of India's installed hydro capacity on 30 Sep 2026.

What critics point to

  • Borrowings rose to ₹57,220 crore on 30 Sep 2026, and free cash flow was −₹8,279 crore in FY26.
  • Subansiri Lower's expected cost is ₹30,072 crore against ₹6,285 crore approved in 2002, and its completion has moved from May 2026 to Q1 FY28.
  • FY26 profit included ₹983 crore of regulatory deferral income and a ₹1,165 crore deferred-tax credit.
  • Subansiri Lower and Parbati-II revenue is provisional until CERC issues final tariffs.

09What to watch next

What should you watch next at NHPC?

Next event

Q3 FY27 results

Date not announced yet.

  • Subansiri Lower's last three units

    Five of eight units were running from 23 Oct 2026; NHPC's Nov 2026 presentation shows the next three in Q1 FY28.

  • CERC tariff orders

    Q2 FY27 sales of ₹678 crore from Subansiri Lower and ₹553 crore from Parbati-II were booked provisionally.

  • Borrowings and capex

    Borrowings were ₹57,220 crore on 30 Sep 2026. NHPC's FY27 capex target is ₹15,000 crore on its presentation's own measure; the cash flow statement's capex line was ₹5,685 crore in H1 FY27.

10Key facts

Key facts about NHPC

What does NHPC do?
NHPC Limited, a government-controlled company based in Faridabad, Haryana, builds and runs hydroelectric power stations and sells the electricity in bulk. NHPC had 9,583 MW of installed capacity in Nov 2026, of which 9,021 MW was hydro and 562 MW solar and wind.
How does NHPC make money?
NHPC earns most of its money from tariffs set by the Central Electricity Regulatory Commission (CERC), which cover a station's return on equity, depreciation, interest on loans, operation and maintenance, and interest on working capital. NHPC's revenue from operations was ₹11,615 crore in FY26.
Who are NHPC's customers?
NHPC's three largest customers in FY26 were Uttar Pradesh Power Corporation (15.1% of revenue), Jammu & Kashmir's Power Development Department and JK Power Corporation (12.3%), and MP Power Management Company (11.2%), together 38.66% of NHPC's revenue.
How big is NHPC?
In FY26 NHPC's consolidated revenue was ₹11,615 crore and its profit for shareholders ₹3,766 crore, up from ₹10,380 crore and ₹3,007 crore in FY25.
Who owns NHPC?
On 30 Sep 2026 the President of India (the central government) held 61.39% of NHPC. Domestic institutions held 14.27%, foreign portfolio investors 13.17%, companies controlled by central or state governments 1.13%, and individuals and other non-institutional holders 10.04%.
What is NHPC's regulatory deferral account?
NHPC's regulatory deferral account holds costs that CERC rules let it recover from buyers through later tariffs. Movements in the account added ₹983 crore to NHPC's FY26 profit of ₹4,220 crore (including minority partners' share).
What is NHPC's Subansiri Lower project?
Subansiri Lower is NHPC's 2,000 MW hydro project of eight 250 MW units in Assam and Arunachal Pradesh. Five of its units, 1,250 MW, were in commercial operation from 23 Oct 2026.
What is NHDC, NHPC's subsidiary?
NHDC Ltd is 51.08% owned by NHPC and runs the Indirasagar (1,000 MW) and Omkareshwar (520 MW) hydro stations in Madhya Pradesh. NHDC's FY26 revenue was ₹1,305 crore and its profit ₹936 crore, according to NHPC's Nov 2026 presentation.
What dividend did NHPC pay for FY26?
NHPC paid dividends of ₹1.61 a share for FY26 (an interim of ₹1.40 and a final of ₹0.21), against ₹1.91 a share for FY25.

Terms on this page

Each explains the term in plain English, with the same number from other companies on Cityfort.

Go deeper

More detail from the same filings. Open any section.

11What it sells

11What it sells

What does NHPC sell?

NHPC builds and runs hydroelectric power stations, mostly in the Himalayan states, and sells the electricity in bulk to state power distributors. A hydro station uses flowing river water to spin turbines that make electricity.
  • Hydropower from NHPC's own stations

    7,501.2 MW across 22 hydro stations in Nov 2026, including 1,250 MW of Subansiri Lower and 800 MW of Parbati-II. FY27 tariffs range from ₹1.97 a unit (Teesta-V) to ₹10.61 (Nimoo Bazgo), averaging ₹3.99.

  • Hydropower from NHDC (51.08% owned)

    Indirasagar (1,000 MW) and Omkareshwar (520 MW) in Madhya Pradesh. In FY26 NHPC's own stations accounted for ₹3,133 crore (74.24%) of the group's ₹4,220 crore profit, NHDC for ₹643 crore (15.25%) after intra-group eliminations, and minority partners for ₹455 crore (10.77%).

  • Solar and wind power

    562 MW in Nov 2026, including the 300 MW Karnisar solar plant near Bikaner, commissioned in FY26. Solar made 782 MU and wind 57 MU of the group's 29,600 MU in FY26.

Think of it like this

A bit like a landlord whose rent is set by a regulator: the yearly charge covers the building's costs plus a return on the owner's money, as long as the building stays available.

What it does

  • Does: Generates electricity from 24 hydro stations and 7 solar and wind plants (Nov 2026)
  • Does: Sells power under long-term agreements, mostly to state distribution companies, at CERC tariffs
  • Does: Builds new hydro projects itself and through subsidiaries: 8,954 MW was under construction in Nov 2026
  • Does: Also does power trading, consultancy and project management, which are not reported as separate segments

What it does not do

  • Does not: Does not supply electricity to homes directly; state distribution companies do that
  • Does not: Does not set its own tariffs for its hydro stations; CERC does
  • Does not: Does not run coal or gas plants: its capacity is hydro, solar and wind
  • Does not: Does not report revenue station by station
12How the money flows

12How the money flows · FY26

How does money flow through NHPC?

Money in

  • Revenue from operations₹11,615 cr
  • Regulatory deferral income, net of tax (costs to be recovered from buyers later)₹983 cr
  • Deferred-tax credit (re-measured for the new tax regime)₹1,165 cr
  • Share of joint ventures' profit₹2 cr
  • Other income₹1,071 cr

The company

NHPC

₹14,836 cr came in

Money out

  • Generation and other running costs₹4,881 cr
  • Employee costs₹1,498 cr
  • Depreciation (wear-and-tear of stations)₹1,976 cr
  • Interest on borrowings₹1,423 cr
  • Current tax₹839 cr
  • Minority partners' share of profit₹455 cr
  • Net profit for NHPC shareholders₹3,766 cr
  1. In FY26 NHPC brought in ₹11,615 crore of revenue and ₹1,071 crore of other income.
  2. Two accounting items added more: ₹983 crore of regulatory deferral income and a ₹1,165 crore deferred-tax credit.
  3. Generation and other running costs took ₹4,881 crore, including ₹822 crore of Subansiri Lower transmission charges. Employees took ₹1,498 crore.
  4. Depreciation took ₹1,976 crore, interest ₹1,423 crore and current tax ₹839 crore. Minority partners in subsidiaries took ₹455 crore.
  5. What was left for NHPC's shareholders was ₹3,766 crore of profit.
13What it needs to run

13What it needs to run

What does NHPC need to run?

  • River water

    Output depends on water flow, and NHPC's results say its business is seasonal. Hydro generation was 23,132 MU in H1 FY27 (Apr–Sep), against 28,761 MU in all of FY26.

  • Borrowed money

    Borrowings were ₹57,220 crore on 30 Sep 2026. In FY26 NHPC added ₹1,772 crore of interest to the cost of projects being built, on top of ₹1,423 crore charged as an expense.

  • Tariff orders from CERC

    Tariffs run in five-year blocks. NHPC has filed petitions for 2024–29; stations without new orders bill at the charges that applied on 31 Mar 2024.

  • People

    3,876 employees and 8,592 workers (793 of them permanent) on a standalone basis in FY26.

14Where growth could come from

14Where growth could come from

Where could NHPC's growth come from?

NHPC's investor presentation of 4 Nov 2026 gives a consolidated capex target of ₹15,000 crore for FY27, on the presentation's own capex measure (₹13,689 crore for FY26). It shows the last three Subansiri Lower units in Q1 FY28 (Apr–Jun 2027).
Management statement, 4 Nov 2026. Reported as a statement, not our forecast.
  • Subansiri Lower (2,000 MW)

    Mixed

    1,250 of 2,000 MW running (23 Oct 2026)

    Five of eight units started between 23 Dec 2025 and 23 Oct 2026. It generated 3,083 MU in H1 FY27, the most of any NHPC station. Q2 FY27 sales of ₹678 crore were booked provisionally, pending CERC's tariff.

    Status: Mixed, partly on track.

  • Parbati-II (800 MW)

    Working

    ₹553 crore of Q2 FY27 sales, from ₹218 crore

    Commissioned in FY26. CERC set an interim tariff of ₹6.88 a unit on 5 Feb 2026; sales are booked provisionally until the final order.

    Status: Working, on track against what the company said.

  • Subsidiary projects in Jammu & Kashmir

    Behind

    3,014 MW under construction (Nov 2026 presentation)

    Kiru (624 MW, Q4 FY27), Pakal Dul (1,000 MW, Q1 FY28), Kwar (540 MW, Q1 FY29) and Ratle (850 MW, Q3 FY29): 3,014 MW (Cityfort calculation: 624 + 1,000 + 540 + 850 (S11)). On 18 May 2026 management gave Pakal Dul as Q4 FY27 and Kwar as March 2028.

    Status: Behind, behind the company's own plan.

  • Solar plants

    Early

    1,190 MW under construction (Nov 2026)

    Seven solar projects, after the 300 MW Karnisar plant began in FY26. ICRA said on 1 Jul 2026 they were expected in phases in FY27, with land and transmission critical.

    Status: Early, too early to judge.

  • Large new hydro projects

    Early

    Dibang 2,880 MW, due Q4 FY32

    ₹5,504 crore was spent on Dibang to Sep 2026. NHPC told exchanges on 8 Apr 2026 that the government approved ₹26,069.50 crore for the 1,720 MW Kamala project, to be built in 96 months.

    Status: Early, too early to judge.

Status compares progress with what the company itself said it would do: Working = on track against what the company said; Mixed = partly on track; Behind = behind the company's own plan; New = recently announced; Early = too early to judge.

15Financial strength and debt

15Financial strength · 30 Sep 2026

How much debt does NHPC have?

On 30 Sep 2026 NHPC's net debt of ₹52,575 crore was about 16 times its FY26 operating cash flow (Cityfort calculation: ₹52,575 ÷ ₹3,294 crore (S5, S1)).
  • Total debt₹57,220 cr
  • Cash and investments₹4,645 cr
  • Net debt (debt minus cash)₹52,575 cr
  • Net worth (shareholders' money)₹43,741 cr
Debt to equity
1.31×
₹ of debt for every ₹1 of shareholders' money
Interest cover
3.1×
how many times operating profit covers interest
  • Borrowings rose from ₹39,434 crore on 31 Mar 2025 to ₹52,134 crore on 31 Mar 2026 and ₹57,220 crore on 30 Sep 2026. Lease liabilities (₹193 crore on 31 Mar 2026) are outside borrowings.
  • Cash = cash and equivalents (₹2,751 crore) plus other bank balances (₹1,894 crore) on 30 Sep 2026.
  • Debt to equity 1.31 (Cityfort calculation: ₹57,220 crore borrowings ÷ ₹43,741 crore equity of NHPC shareholders on 30 Sep 2026 (S5)); including minority partners' equity (₹50,752 crore in total) it is 1.13.
  • Interest coverage 3.05 (Cityfort calculation: (₹2,910 crore FY26 profit before tax and regulatory deferral movements + ₹1,423 crore interest) ÷ ₹1,423 crore (S1)). A further ₹1,772 crore of FY26 interest was added to the cost of projects under construction.
  • ICRA put NHPC's FY26 total debt at 9.99 times its operating profit (OPBDIT), against 7.12 in FY25, and rates it [ICRA]AAA (Stable) (1 Jul 2026).
  • Regulatory deferral debit balances, amounts NHPC expects to recover from buyers through later tariffs, were ₹8,818 crore on 30 Sep 2026, up from ₹8,416 crore on 31 Mar 2026.
16Who owns it

16Who owns it · Q2 FY27

Who owns NHPC?

  • Promoters (founders or parent company)61.4%
  • Foreign institutions (FII)13.2%
  • Indian institutions (DII)14.3%
  • Public and others11.2%

Promoter pledge

No promoter shares were pledged in Q2 FY27.

How ownership changed
NHPC shareholding by quarter, %
QuarterPromotersFIIDIIPublicOthers†Pledged*
Q4 FY2467.4%6.8%11.3%13.2%1.3%0.0%
Q1 FY2567.4%9.0%10.3%12.1%1.3%0.0%
Q2 FY2567.4%9.4%9.8%12.3%1.1%0.0%
Q3 FY2567.4%8.8%10.0%12.7%1.1%0.0%
Q4 FY2567.4%8.8%10.6%12.1%1.1%0.0%
Q1 FY2667.4%9.3%10.7%11.5%1.1%0.0%
Q2 FY2667.4%10.1%10.6%10.9%1.1%0.0%
Q3 FY2667.4%10.4%10.3%10.8%1.1%0.0%
Q4 FY2667.4%10.3%10.5%10.6%1.1%0.0%
Q1 FY2761.4%12.3%14.6%10.6%1.1%0.0%
Q2 FY2761.4%13.2%14.3%10.0%1.1%0.0%

* Pledged = share of the promoters' own holding reported as pledged. In older filings this can include shares “otherwise encumbered”; the governance flags say when.

† Others = Companies controlled by central or state governments.

17What it does with profit

17What it does with profit

What does NHPC do with its profit?

FY26 dividends were ₹1.61 a share (interim ₹1.40, final ₹0.21), ₹1,617 crore in total and 44.70% of standalone profit; FY25's ₹1.91 was 62.21% of standalone profit. NHPC's policy is to pay the higher of 30% of profit or 4% of net worth, following a government (DIPAM) guideline.

Dividend per share

₹1.61FY26

Dividend paid for each share, by financial year.

₹ per share

See the numbers
Dividend per share (₹ per share)
YearDividend per shareShare of profit paid out
FY23₹1.85–
FY24₹1.90–
FY25₹1.91–
FY26₹1.61–

No buybacks or fund raises in the period covered.

18Governance signals

18Governance signals

What do NHPC's governance filings show?

Auditor
Joint statutory auditors appointed by the C&AG for FY26: S N Dhawan & Co. LLP, S Jaykishan and Dharam Raj & Co.
Auditor changes
None in the period covered
Audit qualifications
None reported
Related-party dealings
NHPC's related parties include its subsidiaries (such as NHDC, Chenab Valley Power Projects, Ratle Hydroelectric Power Corporation and Jalpower Corporation) and its joint venture and associate. This page does not summarise the related-party amounts in the FY26 annual report.
Credit rating
ICRA [ICRA]AAA (outlook Stable), 1 Jul 2026

A credit rating describes the company's ability to repay debt. It is not a rating of the share.

Flags to know about

  • regulatory · 5 Aug 2026

    Exchange fines over board composition

    The FY26 secretarial audit says NHPC did not have the required number of independent directors, including a woman independent director, under SEBI LODR Regulation 17(1) from 1 Apr 2025 to 31 Mar 2026. BSE and NSE fined NHPC for different quarters under Regulations 17(1), 18(1) and 19(1)/19(2). NHPC told the exchanges the shortfall was not due to its negligence, as appointments are not in the Board's control, and asked for waivers. The FY26 governance report says all fines were waived except those under Regulation 17(1) for the six quarters ended 31 Dec 2024 to 31 Mar 2026.

  • disclosure · 5 Aug 2026

    Regulatory accounts move profit

    NHPC books movements in regulatory deferral accounts (amounts to be recovered from, or returned to, buyers later) after tax. They added ₹983 crore to FY26 profit and ₹277 crore to FY25 profit, and took ₹1,210 crore from FY22 profit.

  • disclosure · 4 Nov 2026

    Some revenue booked provisionally

    Subansiri Lower sales (₹678 crore in Q2 FY27) and Parbati-II sales (₹553 crore) were recognised provisionally, pending CERC's final tariff orders.

  • other · 2 Sep 2026

    Arbitral award on a Subansiri Lower contract

    On 1 Sep 2026 an arbitral tribunal awarded BGS-SGS-SOMA ₹392.31 crore plus €15,36,530, including 10% interest from 9 Sep 2021 to 31 Aug 2026, against a claim of ₹796.87 crore plus €28,76,497. NHPC said the amount is allowable as project cost and recoverable through tariff under CERC's 2024 regulations.

  • disclosure · 5 Aug 2026

    Restated and reclassified years

    Each year uses the latest figures NHPC reported: FY23 as restated in the FY24 report, FY24 as restated in the FY25 report, and FY25 as reclassified in the FY26 report (other income and other expenses each ₹114.70 crore lower, profit unchanged). FY24 and earlier were not reclassified, so EBITDA margins before FY25 are on the older basis.

  • disclosure · 15 Oct 2026

    Shareholding data on this page

    The scanned shareholding patterns hide some subtotals. The non-institutional share for Jun 2024 to Mar 2025, Jun 2025, Dec 2025 and Mar 2026 is a Cityfort calculation: 100% − promoter − domestic institutions − foreign investors − government-controlled companies; Mar 2026 domestic institutions are the sum of their listed lines.

19What the market paid

19What the market paid · price as of 11 Nov 2026

What did the market pay for NHPC on 11 Nov 2026?

Price as of 11 Nov 2026 (shown for education; prices change daily).

Price as of 11 Nov 2026: ₹77.90, the NSE closing price. Market value: ₹78,251 crore (Cityfort calculation: ₹77.90 × 10,045,034,805 shares (S30, S28)). P/E is the share price divided by one year's profit per share: 20.77 (Cityfort calculation: ₹77.90 ÷ FY26 EPS of ₹3.75 (S30, S1)). P/B divides the price by shareholders' equity per share: 1.79 (Cityfort calculation: ₹77.90 ÷ ₹43.54, which is ₹43,741 crore equity on 30 Sep 2026 ÷ 10,045,034,805 shares (S30, S5, S28)). The FY26 dividend of ₹1.61 a share was 2.07% of the 11 Nov 2026 price (Cityfort calculation: ₹1.61 ÷ ₹77.90 (S1, S30)). EV/EBITDA is not shown.

Share price
₹77.90
Market value (market cap)
₹78,251 cr
P/E
20.8×
P/B
1.8×

Source: NSE security-wise bhavcopy (full), 11 Nov 2026; Shareholding pattern, quarter ended 30 Sep 2026; Annual Report FY26 (incl. BRSR) and 1 more

20How it got here

20How it got here

How did NHPC get here?

  1. 1975

    Milestone

    NHPC set up

    Began as National Hydroelectric Power Corporation Private Limited, to build the Salal, Bairasiul and Loktak projects.

  2. 2023

    Crisis

    Teesta-V shut by a flood

    On 4 Oct 2023 a glacial lake outburst flood and the breach of the Teesta Urja-III dam upstream shut the 510 MW Teesta-V station.

  3. 2024

    Milestone

    Government sold 3.55%

    In Jan–Feb 2024 the central government's stake fell from 70.95% to 67.40% through an offer for sale.

  4. 2024

    Milestone

    Navratna status

    In Aug 2024 the government upgraded NHPC from a Miniratna Category I company to a Navratna company, ICRA notes.

  5. 2025

    Business-model change

    Parbati-II and Karnisar solar start

    In FY26 NHPC commissioned the 800 MW Parbati-II hydro station and the 300 MW Karnisar solar plant.

  6. 2025

    Business-model change

    Subansiri Lower starts up

    The first 250 MW unit of the 2,000 MW project began commercial operation on 23 Dec 2025; the fifth followed on 23 Oct 2026.

  7. 2026

    Milestone

    Government sold about 6.01%

    Through an offer for sale on 2–3 Jun 2026 the government sold about 60.4 crore shares for about ₹4,360 crore; its stake fell from about 67.40% to about 61.39%, ICRA says.

  8. 2026

    Crisis

    Teesta-V back, Teesta-VI incident

    All three Teesta-V units resumed commercial generation from 16 Jul 2026. On 20 Jul 2026 a suspected methane burst in the Teesta-VI tunnel trapped 25 people; 10 casualties were reported at the time.

21Sources and changes

Where every number on this page comes from

Sources (32 documents)
  1. S1Annual Report FY26 (incl. BRSR) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 5 Aug 2026
  2. S2Annual Report FY25 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 6 Aug 2025
  3. S3Annual Report FY24 (IR copy uploaded 29 Jul 2025; 48th AGM 28 Aug 2024) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 29 Jul 2025
  4. S4Annual Report FY23 (IR copy uploaded 29 Jul 2025) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 29 Jul 2025
  5. S5Unaudited financial results Q2 and H1 FY27 (standalone and consolidated) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 4 Nov 2026
  6. S6Unaudited financial results Q1 FY27 (standalone and consolidated) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 4 Aug 2026
  7. S7Unaudited financial results Q3 and 9M FY26 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 4 Feb 2026
  8. S8Unaudited financial results Q2 and H1 FY26 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 6 Nov 2025
  9. S9Audited financial results Q4 and FY25 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 20 May 2025
  10. S10Unaudited financial results Q3 and 9M FY25 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 7 Feb 2025
  11. S11Investor Presentation September 2026 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 4 Nov 2026
  12. S13Transcript, Q4 FY26 earnings call (18 May 2026) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 25 May 2026
  13. S15Transcript, Q4 FY25 earnings call (21 May 2025) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 28 May 2025
  14. S16Transcript, Q2 FY25 earnings call (8 Nov 2024) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 18 Nov 2024
  15. S18Shareholding pattern, quarter ended 31 Mar 2024 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 19 Apr 2024
  16. S19Shareholding pattern, quarter ended 30 Jun 2024 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 17 Jul 2024
  17. S20Shareholding pattern, quarter ended 30 Sep 2024 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 23 Oct 2024
  18. S21Shareholding pattern, quarter ended 31 Dec 2024 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 17 Jan 2025
  19. S22Shareholding pattern, quarter ended 31 Mar 2025 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 17 Apr 2025
  20. S23Shareholding pattern, quarter ended 30 Jun 2025 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 18 Jul 2025
  21. S24Shareholding pattern, quarter ended 30 Sep 2025 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 16 Oct 2025
  22. S25Shareholding pattern, quarter ended 31 Dec 2025 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 12 Jan 2026
  23. S26Shareholding pattern, quarter ended 31 Mar 2026 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 21 Apr 2026
  24. S27Shareholding pattern, quarter ended 30 Jun 2026 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 20 Jul 2026
  25. S28Shareholding pattern, quarter ended 30 Sep 2026 · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 15 Oct 2026
  26. S29ICRA rationale: NHPC Limited, rating reaffirmed [ICRA]AAA (Stable) · ICRA Ltd · Tier 2: rating agency or regulator · 1 Jul 2026
  27. S30NSE security-wise bhavcopy (full), 11 Nov 2026 · National Stock Exchange of India · Tier 1: company or exchange filing · 11 Nov 2026
  28. S31Update on commissioning of Subansiri Lower HE Project (Unit 5 COD 23 Oct 2026) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 21 Oct 2026
  29. S32Press release: Incident at Teesta VI HE Project (500 MW), Sikkim · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 21 Jul 2026
  30. S33Resumption of commercial operation of last unit (170 MW) of Teesta-V Power Station · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 16 Jul 2026
  31. S34Investment approval for Kamala Hydro Electric Project (1720 MW) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 8 Apr 2026
  32. S35Change in status of material litigation under arbitration (award 1 Sep 2026, BGS-SGS-SOMA) · NHPC Ltd (company IR site; same filing made to NSE/BSE) · Tier 1: company or exchange filing · 2 Sep 2026
Changes to this page (v1 · 12 Nov 2026)
  1. v1 · 12 Nov 2026First version. (first version)

Numbers come only from tier 1 and tier 2 sources. Read how we research.

Disclaimer

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

Investing in securities involves risk, including loss of capital. Before making any investment decision, do your own research and consider consulting a SEBI-registered investment adviser.

Cityfort, its owners and contributors may or may not hold securities of companies covered. Content is not an offer or solicitation to buy or sell any security.

Read the full disclaimer

Cityfort publishes educational content that explains how listed companies work. Cityfort is not registered with the Securities and Exchange Board of India (SEBI) as an Investment Adviser or Research Analyst and does not provide investment advice, recommendations, ratings, price targets or any opinion on whether to buy, sell or hold any security.

All information is taken from publicly available sources, mainly company filings on BSE and NSE, which are listed on each page with dates. We work to keep it accurate and correct errors publicly, but we do not guarantee that it is complete, accurate or up to date. Any market price or price-based ratio shown is dated, may be out of date by the time you read it, and is included only to explain concepts.

Statements by company management are reported as statements, with their date and source; they are not our forecasts.