Power · NSE: NTPC · BSE: 532555
NTPC: how the business works
NTPC generates electricity, mostly from coal, and sells it in bulk to state power distributors; its FY26 revenue was ₹187,385 crore.
Follow NTPC
Email me when NTPC's page is updated after results.
We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.
NTPC Limited · New Delhi · Founded 1975
Updated for Q2 FY27 · checked
- Revenue, FY26
- ₹187,385 cr
- Profit to shareholders, FY26
- ₹27,053 cr
- Group installed capacity, 30 Sep 2026 (company figure)
- 91,506 MW
- Founded
- 1975
- Promoter: President of India, Jun 2026
- 51.10%
The short version
NTPC in 5 points
1 · What it sells
NTPC sells electricity made mostly from coal: 65,224 MW of the group's 87,787 MW gross capacity on 31 Mar 2026 was coal-fired, and FY26 revenue was ₹187,385 crore.
2 · Who pays it
In FY26, electricity buyers, mainly state power distribution companies, paid for 94.7% of NTPC's segment revenue, and buyers of its consultancy, trading, oil and gas, and coal paid 5.3%.
3 · What it keeps from ₹100
Of every ₹100 that came in during FY26, NTPC kept ₹14.0 as profit for shareholders after ₹48.0 for fuel, a figure that nets a one-off ₹7,410 crore deferred-tax credit against a ₹7,169 crore regulatory charge; profit before tax and regulatory accounts was ₹27,134 crore.
4 · Where the operating profit comes from
Electricity generation earned ₹40,437 crore of NTPC's ₹41,671 crore FY26 segment result, and consultancy, trading, oil and gas, and coal mining earned ₹1,234 crore.
5 · The one thing to watch
NTPC's borrowings rose from ₹267,258 crore on 31 Mar 2026 to ₹275,634 crore on 30 Sep 2026, while the group added 2,398 MW in H1 FY27; management planned about 9,557 MW for FY27 on 23 May 2026 and on 31 Oct 2026 said it expects "close to 8 GW".
Sources: From NTPC's FY26 annual report, its Q4 FY26 and Q2 FY27 results and calls, and CARE's May 2026 rating report · checked
Sources (6)
- Integrated Annual Report FY26
- Business Responsibility and Sustainability Report FY26
- Audited financial results Q4 and FY26 (board outcome 23 May 2026)
- Unaudited financial results Q2 FY27 and interim dividend (board outcome 31 Oct 2026)
- Transcript of Q2 FY27 conference call held 31 Oct 2026
- Transcript of Q4 FY26 conference call held 23 May 2026
01Where the money goes · FY26
Where does ₹100 of NTPC's money go?
NTPC · FY26
Receipt for every ₹100
| Fuel (mostly coal) | ₹48.0 |
|---|---|
| Employees | ₹3.6 |
| Other running costs, incl. power bought for resale | ₹16.9 |
| Depreciation | ₹10.2 |
| Interest on borrowings | ₹7.2 |
| Tax, regulatory accounts and minority share (net) | ₹0.0 |
| Kept as profit for NTPC shareholders | ₹14.0 |
| Total | ₹100 |
Each line = amount ÷ total money in × 100. Lines may not add to exactly ₹100 because of rounding.
How this is worked out
Of every ₹100 that came in during FY26: revenue (₹187,385 crore), other income (₹2,414 crore) and NTPC's share of joint ventures' profit (₹2,864 crore). Tax was a net credit of ₹2,876 crore after a ₹7,410 crore deferred-tax credit for an expected move to the new tax regime. Regulatory deferral accounts (amounts to be recovered from, or returned to, buyers later) cut profit by ₹2,464 crore, and minority partners took ₹493 crore (Cityfort calculation: ₹27,546 crore total profit − ₹27,053 crore for shareholders (S1)). The receipt shows the three together.
Save this receipt as an image
Embed this receipt or the key numbers
Paste this code into a blog or website to show the card you choose, with a link back to this page.
Each week: the next company due to report results, explained in 5 points.
We'll email you once a week with what changed on Cityfort. Facts only, no tips. Unsubscribe any time.
We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.
02The business in one line
What does NTPC do?
State power distributors pay NTPC for electricity at tariffs set by the regulator; fuel takes ₹48.0 of every ₹100 that comes in, and ₹14.0 is profit.
- For coal, gas and hydro plants, the regulator CERC sets tariffs that cover costs plus a post-tax return on equity, CARE said on 22 May 2026.
- NTPC's borrowings reached ₹275,634 crore on 30 Sep 2026, up from ₹247,575 crore on 31 Mar 2025, as it builds new plants.
03Who pays it
Who pays NTPC?
Electricity buyers, mainly state distribution companies
94.7%
of revenue
State power distribution companies (discoms), state electricity boards and power departments buy most of NTPC's power under long-term contracts; Indian Railways and private distributors buy some too. Share = generation segment's share of FY26 segment revenue.
Buyers of consultancy, trading, oil and gas, and coal
5.3%
of revenue
NTPC's 'others' segment: consultancy, power trading, oil and gas, and coal mining. Share = the segment's share of FY26 segment revenue.
- Electricity buyers, mainly state distribution companies94.7%
- Buyers of consultancy, trading, oil and gas, and coal5.3%
How spread out the customers are
No single customer gave NTPC 10% or more of revenue in FY26 or FY25. NTPC does not disclose revenue by customer or by state. Its trading arm NVVN exported ₹1,231 crore of power to Nepal and Bangladesh in FY26.
04How it makes money
How does NTPC make money?
Regulated returns: for most of its plants, NTPC is paid its costs plus a set return on the equity it invested.
For coal, gas and hydro plants, CERC sets a two-part tariff. The capacity charge covers depreciation, interest, running costs and a post-tax return on equity, paid in full when a plant is available 85% of the time. The energy charge passes fuel costs to buyers, within CERC's norms.
Group regulated equity, ₹ crore (company figure)
116,022121,786
Sep 2025 to Sep 2026
- NTPC builds a plant with borrowed money and its own equity.
- The equity in running plants is its regulated equity: ₹121,786 crore for the group on 30 Sep 2026.
- Buyers pay a capacity charge when the plant is available 85% of the time (standalone coal plants: 90.12% in FY26).
- They also pay an energy charge that passes fuel costs through, within norms.
- The capacity charge includes a post-tax return on equity, which becomes profit.
- Profit pays dividends and part of the equity for new plants.
↺ Step 6 feeds back into step 1.
05Business segments · FY26
Which businesses make up NTPC?
Generation of energy
94.7%Electricity sold from the group's power stations. Its segment result (the profit NTPC reports for each segment) was ₹40,437 crore of the ₹41,671 crore total (Cityfort calculation: ₹40,437 + ₹1,234 crore (S1)).
Revenue ₹175,730 cr · Operating profit ₹40,437 cr
Others
5.3%Consultancy, power trading, oil and gas, and coal mining; segment result ₹1,234 crore in FY26. Segment revenue adds to ₹185,474 crore, less than the ₹187,385 crore revenue from operations, so shares use the segment total.
Revenue ₹9,745 cr · Operating profit ₹1,234 cr
How the mix changed
- Generation of energy
- Others
Revenue by segment, FY22 to FY26.
₹ crore
See the numbers
06The numbers · Consolidated · ₹ crore
How has NTPC done?
Revenue
₹187,385 crFY26
Revenue rose from ₹132,669 crore in FY22 to ₹188,138 crore in FY25, was ₹187,385 crore in FY26, and reached ₹54,270 crore in Q2 FY27 against ₹44,784 crore a year earlier.
₹ crore
See the numbers
Net profit
₹27,053 crFY26
Profit for shareholders rose every year, from ₹16,676 crore in FY22 to ₹27,053 crore in FY26; Q4 FY26's ₹10,486 crore includes a deferred-tax credit largely offset in regulatory accounts.
₹ crore
See the numbers
Net profit for every ₹100 of revenue
₹14.4FY26
Net profit per ₹100 of revenue ranged from ₹9.6 in FY23 to ₹14.4 in FY26; EBITDA (Cityfort calculation: profit before tax + interest + depreciation − other income, including joint-venture profit (S1–S4)) ranged from ₹27.5 to ₹31.1.
Net margin: ₹ of net profit per ₹100 of revenue
See the numbers
Free cash flow
₹6,852 crFY26
Free cash flow fell from ₹22,333 crore in FY23 to ₹6,852 crore in FY26 as capex rose to ₹44,050 crore, and FY22 cash flow is on the basis used before the FY23 restatement.
₹ crore · cash from operations minus spending on plants and equipment
See the numbers
See all yearly numbers
EBITDA = profit before interest, tax and wear-and-tear of assets. Financial year runs April to March (March year end). Net profit is the share belonging to the company's owners. Total net income differs from net profit to the company's owners: Total profit includes the share of minority partners in subsidiaries such as NTPC Green Energy and THDC India.
Sources (8)
- 47th Annual Report FY23
- Annual Report FY24
- Integrated Annual Report FY25
- Integrated Annual Report FY26
- Unaudited financial results Q3 FY26 (board outcome 30 Jan 2026)
- Audited financial results Q4 and FY26 (board outcome 23 May 2026)
- Unaudited financial results Q1 FY27 (board outcome 24 Jul 2026)
- Unaudited financial results Q2 FY27 and interim dividend (board outcome 31 Oct 2026)
07Who runs it
Who runs NTPC, and did they deliver?
Gurdeep Singh
Chairman & Managing Director
Tenure extended for six months from 1 Aug 2026, "or till assumption of charge of the post by the regular incumbent".
What they said, and what happened
1 partly delivered · 4 too early to tell
Said on 30 Oct 2025
Add 9,844 MW of group capacity in FY26 (2,019 MW by NTPC and 7,825 MW by joint ventures and subsidiaries).
Partly deliveredWhat happened
The group added 9,618 MW in FY26: 1,823 MW by NTPC and 7,795 MW by joint ventures and subsidiaries, management said on 23 May 2026.
Said on 23 May 2026
Add about 9,557 MW of group capacity in FY27 (1,070 MW thermal, 250 MW hydro, 8,237 MW renewable).
Too early to tellWhat happened
The group added 2,398 MW in H1 FY27. On 31 Oct 2026 management cut its FY27 estimate from about 9.5 GW to "close to 8 GW".
Said on 23 May 2026
Add 10,039 MW of group capacity in FY28.
Too early to tellWhat happened
On 31 Oct 2026 management put FY28 group additions at 9,639 MW.
Said on 31 Oct 2026
Turn around the Sinnar plant: "targeting by December this year or January next", in answer to a question on the turnaround timeline.
Too early to tellWhat happened
Not yet reported.
Said on 23 May 2026
NTPC Green Energy capex of ₹35,800 crore in FY27, ₹46,000 crore in FY28 and ₹48,000 crore in FY29.
Too early to tellWhat happened
Not yet reported.
08What could go wrong
What could go wrong for NTPC?
- Concentration
Payments from state distributors
NTPC's buyers are mostly state-owned distribution companies, and CARE names their finances (counterparty risk) as a rating weakness. NTPC relies on letters of credit, a tri-partite agreement with the central government, RBI and states, and late-payment surcharge rules. Trade receivables were ₹41,253 crore on 30 Sep 2026, up from ₹36,616 crore on 31 Mar 2026.
Watch Trade receivables each half-year (₹41,253 crore on 30 Sep 2026).
- Debt
Rising debt for new plants
Borrowings rose from ₹247,575 crore on 31 Mar 2025 to ₹275,634 crore on 30 Sep 2026. CARE puts NTPC's planned capex at about ₹266,558 crore for FY26–FY28 and names leverage as a weakness: total debt was 4.62 times PBILDT (profit before interest, lease rentals, depreciation and tax) in FY25.
Watch Total borrowings each quarter and the average borrowing rate (5.72% in H1 FY27).
- Execution
New capacity arriving late
On 23 May 2026 management planned about 9,557 MW of group capacity additions for FY27; the group added 2,398 MW in H1 FY27. On 31 Oct 2026 management cut the FY27 estimate to "close to 8 GW" and said about 1.5 GW of renewables was held up by transmission delays.
Watch Group capacity added each quarter against management's FY27 estimate of close to 8 GW (31 Oct 2026).
- Regulation
Tariff rules set by the regulator
CERC sets the tariff for NTPC's coal, gas and hydro plants, including the return on equity, under its 2024–29 regulations. Rule changes move costs and revenue: CERC's 20 Mar 2026 amendment on ash-transport costs changed how ash revenue is booked, part of the rise in other expenses from ₹20,182 crore in FY25 to ₹26,870 crore in FY26.
Watch CERC tariff orders and amendments, and plant availability against the 85% norm.
- Raw-material prices
Coal supply and fuel costs
Coal plants were 65,224 MW of the group's 87,787 MW gross capacity on 31 Mar 2026, and fuel cost ₹92,490 crore in FY26. CARE says the energy charge passes fuel costs to buyers only within CERC's norms. Standalone coal plants ran at 72.04% of capacity (PLF) in FY26, down from 77.44% in FY25.
Watch Fuel cost each quarter (₹28,628 crore in Q2 FY27) and coal sourced from captive mines (43.50 million tonnes in FY26).
- Governance
Leadership and board appointments
CMD Gurdeep Singh's tenure was extended for six months from 1 Aug 2026, or until a regular CMD takes charge. BSE and NSE fined NTPC over board composition for the quarters ended 31 Mar and 30 Jun 2026; NTPC said the President of India appoints its directors.
Watch Appointment of a regular CMD and of directors to meet the board-composition rule.
Sources (10)
- CARE Ratings press release: NTPC Limited, ratings reaffirmed CARE AAA; Stable
- Integrated Annual Report FY26
- Unaudited financial results Q2 FY27 and interim dividend (board outcome 31 Oct 2026)
- Transcript of Q2 FY27 conference call held 31 Oct 2026
- Transcript of Q4 FY26 conference call held 23 May 2026
- Audited financial results Q4 and FY26 (board outcome 23 May 2026)
- Operational & Financial Snapshot Q4 FY26
- Extension of tenure of Chairman & Managing Director
- Imposition of fine by BSE & NSE, quarter ended 31 Mar 2026 (Reg 17(1))
- Imposition of fine by BSE & NSE, quarter ended 30 Jun 2026 (Reg 17(1))
09Supporters and critics
What do supporters and critics point to?
What supporters point to
- CARE says NTPC recovers its capacity charge, including a post-tax return on equity, when plants are available 85% of the time; standalone coal plants were available 90.12% of the time in FY26.
- Management reported group regulated equity of ₹121,786 crore on 30 Sep 2026, up from ₹116,022 crore a year earlier.
- Profit for shareholders rose every year from ₹16,676 crore in FY22 to ₹27,053 crore in FY26.
- Renewable capacity rose from 3,528 MW in FY24 to 11,577 MW in FY26, with 15,040 MW under execution on 31 Mar 2026.
- NTPC is rated AAA by CARE and India Ratings, and FY26 was its 33rd consecutive year of dividends.
What critics point to
- Borrowings rose from ₹247,575 crore on 31 Mar 2025 to ₹275,634 crore on 30 Sep 2026.
- Free cash flow fell from ₹22,333 crore in FY23 to ₹6,852 crore in FY26, less than the ₹8,759 crore paid as dividends in FY26.
- Coal plants were 65,224 MW of the group's 87,787 MW gross capacity on 31 Mar 2026.
- CARE names the finances of state distribution companies, NTPC's main buyers, as a rating weakness.
- The group added 9,618 MW in FY26 against management's 9,844 MW target of 30 Oct 2025, and on 31 Oct 2026 management cut its FY27 estimate from about 9.5 GW to "close to 8 GW".
10What to watch next
What should you watch next at NTPC?
Next event
Q3 FY27 results
Date not announced yet.
Capacity added against the FY27 plan
The group added 2,398 MW in H1 FY27. Management planned about 9,557 MW for FY27 on 23 May 2026, then said on 31 Oct 2026 that it expects "close to 8 GW".
Borrowings and money owed by buyers
Borrowings were ₹275,634 crore and trade receivables ₹41,253 crore on 30 Sep 2026.
A regular chairman
Gurdeep Singh's extension runs six months from 1 Aug 2026, or until a regular CMD takes charge.
11Key facts
Key facts about NTPC
- What does NTPC do?
- NTPC Limited, a government-controlled company based in New Delhi, generates electricity from coal, gas, hydro, solar and wind plants. NTPC sells the power in bulk, mainly to state power distribution companies. NTPC's FY26 revenue from operations was ₹187,385 crore.
- How does NTPC make money?
- NTPC earns most of its money from tariffs that the regulator CERC sets for its coal, gas and hydro plants. According to CARE (22 May 2026), a capacity charge covers costs plus a post-tax return on equity when a plant is available 85% of the time, and an energy charge passes fuel costs through. Electricity generation was 94.7% of NTPC's FY26 segment revenue.
- Who are NTPC's customers?
- NTPC sells mainly to state power distribution companies, state electricity boards and power departments, and also to Indian Railways and private distributors, according to its FY26 BRSR. No single customer gave NTPC 10% or more of FY26 revenue.
- How big is NTPC?
- NTPC's FY26 consolidated revenue was ₹187,385 crore and its profit for shareholders was ₹27,053 crore. The NTPC group's installed capacity was 91,506 MW on 30 Sep 2026, according to management.
- Who owns NTPC?
- On 30 Jun 2026 the President of India (the Government of India) held 51.10% of NTPC, with none of it pledged. Domestic institutions held 29.44% (including 0.12% held by the central government outside the promoter holding), foreign institutions 16.30% and other shareholders 3.15%.
- How much debt does NTPC have?
- NTPC's consolidated borrowings were ₹275,634 crore on 30 Sep 2026, against ₹213,471 crore of shareholders' equity. NTPC's weighted average borrowing rate was 5.72% in H1 FY27, according to management.
- What did NTPC report for Q2 FY27?
- In Q2 FY27 (Jul–Sep 2026) NTPC's consolidated revenue was ₹54,270 crore, against ₹44,784 crore a year earlier. NTPC's profit for shareholders was ₹7,030 crore, against ₹5,067 crore in Q2 FY26.
- Does NTPC pay dividends?
- NTPC paid dividends of ₹9.00 a share for FY26, ₹8,727 crore in total, its 33rd consecutive year of dividends. For FY27 NTPC declared a first interim dividend of ₹3.00 a share, with a record date of 6 Nov 2026.
- What is NTPC's credit rating?
- CARE Ratings reaffirmed NTPC's long-term rating at CARE AAA; Stable on 22 May 2026. India Ratings affirmed NTPC at IND AAA/Stable on 16 Feb 2026.
Sources (7)
- Integrated Annual Report FY26
- Business Responsibility and Sustainability Report FY26
- CARE Ratings press release: NTPC Limited, ratings reaffirmed CARE AAA; Stable
- Transcript of Q2 FY27 conference call held 31 Oct 2026
- Shareholding pattern, quarter ended 30 Jun 2026 (BSE XBRL rendering)
- Unaudited financial results Q2 FY27 and interim dividend (board outcome 31 Oct 2026)
- Intimation of credit rating: India Ratings affirms IND AAA/Stable (press release 16 Feb 2026)
Terms on this page
- Capital expenditure (capex)
- Credit rating
- EBITDA
- FII and DII holding
- Free cash flow
- Market capitalisation
- Net debt
- Net profit
- Operating margin
- Promoter holding
Each explains the term in plain English, with the same number from other companies on Cityfort.
Go deeper
More detail from the same filings. Open any section.
12What it sells
12What it sells
What does NTPC sell?
Power from coal plants
65,224 MW of the group's 87,787 MW gross capacity on 31 Mar 2026 was coal-fired (excluding BIFPCL and international plants).
Power from gas plants
6,511 MW of gas and liquid-fuel capacity on 31 Mar 2026, unchanged from two years earlier.
Hydro power
4,475 MW of hydro capacity on 31 Mar 2026, up from 3,725 MW a year earlier.
Solar and wind power
11,577 MW of renewable capacity on 31 Mar 2026. CARE says renewable capacity is won by competitive bidding at fixed tariffs.
Coal mining, power trading and consultancy
NTPC sourced 43.50 million tonnes of coal from its captive mines in FY26; the mines moved to NTPC Mining Ltd by 1 Apr 2026. The group also trades power and sells consultancy.
Think of it like this
A bit like renting out a generator: the buyer pays a fixed charge for having it ready, plus the cost of the fuel it burns.
What it does
- Does: Generates electricity from coal, gas, hydro, solar and wind plants
- Does: Sells power in bulk under long-term contracts, mostly to state distribution companies
- Does: Mines coal for its own plants through NTPC Mining
- Does: Trades power, including exports to Nepal and Bangladesh through NVVN
What it does not do
- Does not: Does not supply electricity to homes directly; distribution companies buy its power
- Does not: Does not set its own tariffs for coal, gas and hydro plants; the regulator CERC does
- Does not: Does not build all new capacity itself: joint ventures and subsidiaries added 7,795 MW of the 9,618 MW added in FY26
13How the money flows
13How the money flows · FY26
How does money flow through NTPC?
Money in
- Revenue from operations₹187,385 cr
- Share of profit from joint ventures₹2,864 cr
- Other income₹2,414 cr
The company
NTPC
₹192,663 cr came in
Money out
- Fuel (mostly coal)₹92,490 cr
- Employee costs₹6,986 cr
- Other running costs, incl. power bought for resale₹32,623 cr
- Depreciation (wear-and-tear of plants)₹19,629 cr
- Interest on borrowings₹13,801 cr
- Tax, regulatory accounts and minority partners' share (net)₹81 cr
- Net profit for NTPC shareholders₹27,053 cr
- In FY26 NTPC brought in ₹187,385 crore of revenue, plus ₹2,414 crore of other income and ₹2,864 crore as its share of joint ventures' profit.
- Fuel, mostly coal, took ₹92,490 crore. Other running costs, including power bought for resale, took ₹32,623 crore, and employees ₹6,986 crore.
- Depreciation took ₹19,629 crore and interest on borrowings ₹13,801 crore. That left ₹27,134 crore of profit before tax and regulatory accounts.
- A one-off ₹7,410 crore deferred-tax credit was largely offset by a ₹7,169 crore regulatory charge. Tax, regulatory accounts and minority partners took a net ₹81 crore.
- What was left for NTPC's shareholders was ₹27,053 crore of profit.
14What it needs to run
14What it needs to run
What does NTPC need to run?
Coal
Fuel cost ₹92,490 crore in FY26, ₹49.4 of every ₹100 of revenue (Cityfort calculation: ₹92,490 ÷ ₹187,385 crore (S1)). NTPC sourced 43.50 million tonnes of coal from its captive mines in FY26.
Borrowed money
Borrowings were ₹275,634 crore on 30 Sep 2026. Management put the weighted average borrowing rate at 5.72% in H1 FY27, from 5.98% in FY26.
Transmission lines
New plants need grid lines to carry their power. Management said on 31 Oct 2026 that about 1.5 GW of renewable capacity was held up by transmission delays.
People
The standalone company had 12,220 employees and 3,855 permanent workers in FY26, plus 111,175 workers who were not permanent, according to its BRSR.
15Where growth could come from
15Where growth could come from
Where could NTPC's growth come from?
Management said at the 27 Jul 2026 analysts' meet that the group plans 149 GW of capacity by 2032. In the 23 May 2026 call management put group capex at about ₹622,000 crore to FY32, and planned about 9,557 MW of group additions in FY27. On 31 Oct 2026 management cut the FY27 estimate from about 9.5 GW to "close to 8 GW" and put FY28 additions at 9,639 MW.
Solar and wind (NTPC Green Energy)
Mixed11,577 MW (Mar 2026), from 3,528 MW (Mar 2024)
15,040 MW of renewables was under execution on 31 Mar 2026. Management said on 31 Oct 2026 that it was reviewing its initial FY27 renewable estimate of close to 8 GW; it expects about 6.5 GW to be built, of which about 1.5 GW may wait for transmission lines.
Status: Mixed, partly on track.
New coal plants
Working17 GW of coal under construction (Oct 2026)
Coal capacity rose from 60,874 MW in FY24 to 65,224 MW in FY26. Management said on 31 Oct 2026 that the group had over 37 GW under construction, including 17 GW of coal.
Status: Working, on track against what the company said.
Hydro
Working4,475 MW (Mar 2026), from 3,725 MW
Hydro capacity rose by 750 MW in FY26. Management said on 31 Oct 2026 that about 3.6 GW of hydro is under construction.
Status: Working, on track against what the company said.
Nuclear
Early2,800 MW tender (15 Jul 2026)
On 15 Jul 2026 ASHVINI, NTPC's 49% joint venture with NPCIL, floated a tender (NIT) for the "nuclear island mega EPC package" of the 2,800 MW Mahi Banswara project; management said ASHVINI has started construction. Management said at the 27 Jul 2026 meet that NTPC targets 30 GW of nuclear power by FY47.
Status: Early, too early to judge.
Bought plants: Sinnar
Early1,350 MW (Feb 2026)
A MAHAGENCO–NTPC consortium completed buying Sinnar Thermal Power (5 × 270 MW) in Feb 2026. Asked about the turnaround timeline on 31 Oct 2026, management said it is "targeting by December this year or January next".
Status: Early, too early to judge.
Data centres
New100 MW planned
Management said on 31 Oct 2026 that NTPC has decided to set up 100 MW of data centre capacity at a couple of locations.
Status: New, recently announced.
Status compares progress with what the company itself said it would do: Working = on track against what the company said; Mixed = partly on track; Behind = behind the company's own plan; New = recently announced; Early = too early to judge.
Sources (5)
- Transcript of 22nd Annual Analysts and Institutional Investors Meet held 27 Jul 2026
- Integrated Annual Report FY26
- Transcript of Q4 FY26 conference call held 23 May 2026
- Transcript of Q2 FY27 conference call held 31 Oct 2026
- Completion of acquisition of Sinnar Thermal Power Ltd by MAHAGENCO-NTPC consortium
16Financial strength and debt
16Financial strength · 30 Sep 2026
How much debt does NTPC have?
- Total debt₹275,634 cr
- Cash and investments₹7,763 cr
- Net debt (debt minus cash)₹267,870 cr
- Net worth (shareholders' money)₹213,471 cr
- Debt to equity
- 1.29×
- ₹ of debt for every ₹1 of shareholders' money
- Interest cover
- 3×
- how many times operating profit covers interest
- Borrowings rose from ₹247,575 crore on 31 Mar 2025 to ₹267,258 crore on 31 Mar 2026 and ₹275,634 crore on 30 Sep 2026.
- Cash = cash and equivalents plus other bank balances (₹7,763 crore on 30 Sep 2026). Lease liabilities (rent owed under leases) were a further ₹3,746 crore on 31 Mar 2026, outside borrowings.
- Debt to equity 1.29 (Cityfort calculation: ₹275,634 crore borrowings ÷ ₹213,471 crore shareholders' equity on 30 Sep 2026 (S7)). Interest coverage 2.97 (Cityfort calculation: (₹27,134 crore FY26 profit before tax + ₹13,801 crore finance costs) ÷ ₹13,801 crore (S1)).
- Net debt was 4.46 times FY26 EBITDA (Cityfort calculation: ₹259,254 crore on 31 Mar 2026 ÷ ₹58,150 crore (S1)).
- Management put the weighted average borrowing rate at 5.72% in H1 FY27, from 5.98% in FY26. CARE rates NTPC CARE AAA; Stable (22 May 2026).
17Who owns it
17Who owns it · Q1 FY27
Who owns NTPC?
- Promoters (founders or parent company)51.1%
- Foreign institutions (FII)16.3%
- Indian institutions (DII)29.4%
- Public and others3.2%
Promoter pledge
No promoter shares were pledged in Q1 FY27.
How ownership changed
* Pledged = share of the promoters' own holding reported as pledged. In older filings this can include shares “otherwise encumbered”; the governance flags say when.
Sources (11)
- Shareholding pattern, quarter ended 31 Dec 2023
- Shareholding pattern, quarter ended 31 Mar 2024
- Shareholding pattern, quarter ended 30 Jun 2024
- Shareholding pattern, quarter ended 30 Sep 2024
- Shareholding pattern, quarter ended 31 Dec 2024
- Shareholding pattern, quarter ended 31 Mar 2025
- Shareholding pattern, quarter ended 30 Jun 2025
- Shareholding pattern, quarter ended 30 Sep 2025
- Shareholding pattern, quarter ended 31 Dec 2025
- Shareholding pattern, quarter ended 31 Mar 2026
- Shareholding pattern, quarter ended 30 Jun 2026 (BSE XBRL rendering)
18What it does with profit
18What it does with profit
What does NTPC do with its profit?
Dividend per share
₹9.00FY26
Dividend paid for each share, by financial year.
₹ per share
See the numbers
Money raised · 24 Jul 2026
Board approved raising up to ₹12,000 crore through privately placed bonds (non-convertible debentures).
₹12,000 cr
19Governance signals
19Governance signals
What do NTPC's governance filings show?
- Auditor
- Joint auditors appointed by the C&AG each year: six firms for FY26 (Agasti & Associates, Goyal Parul & Co., J K S S & Associates, M. C. Bhandari & Co., S.N. Kapur & Associates, Vinod Kumar & Associates)
- Auditor changes
- 18 Sep 2026: Six joint auditors for FY26 → HEM Sandeep & Co., OP Bagla & Co., Laxminiwas & Co., PSD & Associates and Laldash & Co. (Appointed by the Comptroller and Auditor General of India as joint statutory auditors for FY27.)
- Audit qualifications
- None reported
- Related-party dealings
- NTPC's related parties include its subsidiaries (such as NTPC Green Energy, THDC India and NEEPCO) and joint ventures (such as NTPC-SAIL Power, Aravali Power and Meja Urja). This page does not summarise the related-party amounts in the FY26 annual report.
- Credit rating
- CARE Ratings CARE AAA (outlook Stable), 22 May 2026
A credit rating describes the company's ability to repay debt. It is not a rating of the share.
Flags to know about
regulatory · 26 Aug 2026
Exchange fines over board composition
BSE and NSE each fined NTPC ₹531,000 for the quarter ended 31 Mar 2026 and ₹536,900 for the quarter ended 30 Jun 2026 for not meeting SEBI LODR Regulation 17(1) on board composition. NTPC said its directors are appointed by the President of India through the Ministry of Power, and asked the exchanges to waive the fines.
auditor · 4 Aug 2026
Emphasis of matter in the FY26 audit report
The FY26 audit opinion was unmodified. The auditors drew attention to how the fly-ash fund (₹919.09 crore) is accounted for.
other · 28 Jul 2026
Chairman on a temporary extension
Gurdeep Singh's tenure as CMD was extended for six months from 1 Aug 2026, or until a regular CMD takes charge.
disclosure · 5 Aug 2024
FY23 accounts restated
From the FY24 annual report, bills discounted with recourse are shown as short-term borrowings instead of reducing receivables, following an Expert Advisory Committee opinion. FY23 operating cash flow was restated from ₹40,052 crore to ₹47,152 crore; FY22 cash flow is on the old basis.
disclosure · 4 Aug 2026
Regulatory accounts move profit
NTPC books regulatory deferral accounts (amounts to be recovered from, or returned to, buyers later) after tax. They added ₹3,702 crore to FY25 profit and took ₹2,464 crore from FY26 profit. NTPC also reports FY26 EPS without them: ₹30.44, against ₹27.90 with them.
disclosure · 14 Jul 2026
Shareholding data on this page
The latest shareholding pattern on this page is for 30 Jun 2026. In it, 0.12% held by the central government outside the promoter holding is shown under domestic institutions. The public share for Jun 2024, Jun 2025 and Dec 2025 is a Cityfort calculation: 48.90% − domestic institutions − foreign institutions − government (S28, S24, S22).
Sources (12)
- Integrated Annual Report FY26
- Appointment of joint statutory auditors by C&AG for FY 2026-27
- Audited financial results Q4 and FY26 (board outcome 23 May 2026)
- CARE Ratings press release: NTPC Limited, ratings reaffirmed CARE AAA; Stable
- Imposition of fine by BSE & NSE, quarter ended 31 Mar 2026 (Reg 17(1))
- Imposition of fine by BSE & NSE, quarter ended 30 Jun 2026 (Reg 17(1))
- Extension of tenure of Chairman & Managing Director
- Annual Report FY24
- Shareholding pattern, quarter ended 30 Jun 2026 (BSE XBRL rendering)
- Shareholding pattern, quarter ended 30 Jun 2024
- Shareholding pattern, quarter ended 30 Jun 2025
- Shareholding pattern, quarter ended 31 Dec 2025
20What the market paid
20What the market paid · price as of 11 Nov 2026
What did the market pay for NTPC on 11 Nov 2026?
Price as of 11 Nov 2026 (shown for education; prices change daily).
Price as of 11 Nov 2026: ₹327.00, the NSE closing price. Market value: ₹317,081 crore (Cityfort calculation: ₹327.00 × 9,696,666,134 shares (S31, S20)). P/E is the share price divided by one year's profit per share: 11.72 (Cityfort calculation: ₹327.00 ÷ FY26 EPS of ₹27.90 (S31, S1)). P/B divides the price by shareholders' equity per share: 1.49 (Cityfort calculation: ₹327.00 ÷ ₹220.15, which is ₹213,471 crore equity on 30 Sep 2026 ÷ 9,696,666,134 shares (S31, S7, S20)). The FY26 dividend of ₹9.00 a share was 2.75% of the 11 Nov 2026 price (Cityfort calculation: ₹9.00 ÷ ₹327.00 (S1, S31)). EV/EBITDA is not shown.
- Share price
- ₹327.00
- Market value (market cap)
- ₹317,081 cr
- P/E
- 11.7×
- P/B
- 1.5×
Source: NSE CM bhavcopy, 11 Nov 2026 (NTPC EQ close Rs 327.00); Shareholding pattern, quarter ended 30 Jun 2026 (BSE XBRL rendering); Integrated Annual Report FY26 and 1 more
21How it got here
21How it got here
How did NTPC get here?
1975
Milestone
NTPC set up
The company was established in 1975 as a central government power company.
2020
Business-model change
Bought THDC India and NEEPCO
On 27 Mar 2020 NTPC bought 74.496% of THDC India and 100% of NEEPCO from the Government of India.
2024
Business-model change
NTPC Green Energy listed
NTPC Green Energy, the group's renewable arm, held a ₹10,000 crore IPO at ₹108 a share in Nov 2024. NTPC's stake fell from 100% to 89.01%.
2026
Milestone
Sinnar Thermal bought
On 24 Feb 2026 a MAHAGENCO–NTPC consortium completed buying Sinnar Thermal Power (1,350 MW), now a 50% joint venture.
2026
Milestone
Renewables reach 11,577 MW
Group renewable capacity reached 11,577 MW on 31 Mar 2026, from 3,528 MW two years earlier.
2026
Business-model change
Coal mines moved to NTPC Mining
The last coal mine was transferred to the subsidiary NTPC Mining Ltd on 1 Apr 2026.
2026
Milestone
Nuclear construction tender
On 15 Jul 2026 ASHVINI, NTPC's 49% joint venture with NPCIL, floated a tender (NIT) for the "nuclear island mega EPC package" of the 2,800 MW Mahi Banswara project. Management said ASHVINI has started construction.
Sources (8)
- Integrated Annual Report FY26
- Annual Report FY22
- Integrated Annual Report FY25
- Transcript of Q4 FY26 conference call held 23 May 2026
- Completion of acquisition of Sinnar Thermal Power Ltd by MAHAGENCO-NTPC consortium
- Audited financial results Q4 and FY26 (board outcome 23 May 2026)
- Unaudited financial results Q1 FY27 (board outcome 24 Jul 2026)
- Transcript of 22nd Annual Analysts and Institutional Investors Meet held 27 Jul 2026
Used in a free classroom lesson: Owned or borrowed funds? Why companies borrow, Net debt and the debt-equity ratio, Interest coverage and when debt comes due, Reading a credit rating report, What is a quarterly results filing?, This quarter, a year ago and the year to date, Standalone or consolidated? Two profits in one filing, The company's own words: press releases, calls and guidance.
22Sources and changes
Where every number on this page comes from
Sources (35 documents)
- S1Integrated Annual Report FY26 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 4 Aug 2026
- S2Integrated Annual Report FY25 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 8 Aug 2025
- S3Annual Report FY24 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 5 Aug 2024
- S447th Annual Report FY23 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 30 Aug 2023
- S5Annual Report FY22 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 4 Aug 2022
- S6Audited financial results Q4 and FY26 (board outcome 23 May 2026) · NTPC Ltd (filed with NSE) · Tier 1: company or exchange filing · 23 May 2026
- S7Unaudited financial results Q2 FY27 and interim dividend (board outcome 31 Oct 2026) · NTPC Ltd (filed with BSE) · Tier 1: company or exchange filing · 31 Oct 2026
- S8Unaudited financial results Q1 FY27 (board outcome 24 Jul 2026) · NTPC Ltd (filed with BSE) · Tier 1: company or exchange filing · 24 Jul 2026
- S9Unaudited financial results Q3 FY26 (board outcome 30 Jan 2026) · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 30 Jan 2026
- S10Transcript of Q2 FY27 conference call held 31 Oct 2026 · NTPC Ltd (filed with BSE) · Tier 1: company or exchange filing · 6 Nov 2026
- S11Transcript of 22nd Annual Analysts and Institutional Investors Meet held 27 Jul 2026 · NTPC Ltd (filed with BSE) · Tier 1: company or exchange filing · 2 Aug 2026
- S12Transcript of Q4 FY26 conference call held 23 May 2026 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 27 May 2026
- S14Transcript of Q2 FY26 conference call held 30 Oct 2025 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 6 Nov 2025
- S15Operational & Financial Snapshot Q4 FY26 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 23 May 2026
- S17CARE Ratings press release: NTPC Limited, ratings reaffirmed CARE AAA; Stable · CARE Ratings Ltd · Tier 2: rating agency or regulator · 22 May 2026
- S18Intimation of credit rating: India Ratings affirms IND AAA/Stable (press release 16 Feb 2026) · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 17 Feb 2026
- S19Business Responsibility and Sustainability Report FY26 · NTPC Ltd (filed with NSE) · Tier 1: company or exchange filing · 4 Aug 2026
- S20Shareholding pattern, quarter ended 30 Jun 2026 (BSE XBRL rendering) · BSE Ltd (filed by NTPC) · Tier 1: company or exchange filing · 14 Jul 2026
- S21Shareholding pattern, quarter ended 31 Mar 2026 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 15 Apr 2026
- S22Shareholding pattern, quarter ended 31 Dec 2025 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 14 Jan 2026
- S23Shareholding pattern, quarter ended 30 Sep 2025 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 17 Oct 2025
- S24Shareholding pattern, quarter ended 30 Jun 2025 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 17 Jul 2025
- S25Shareholding pattern, quarter ended 31 Mar 2025 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 22 Apr 2025
- S26Shareholding pattern, quarter ended 31 Dec 2024 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 24 Jan 2025
- S27Shareholding pattern, quarter ended 30 Sep 2024 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 5 Nov 2024
- S28Shareholding pattern, quarter ended 30 Jun 2024 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 17 Jul 2024
- S29Shareholding pattern, quarter ended 31 Mar 2024 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 16 Apr 2024
- S30Shareholding pattern, quarter ended 31 Dec 2023 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 17 Jan 2024
- S31NSE CM bhavcopy, 11 Nov 2026 (NTPC EQ close Rs 327.00) · National Stock Exchange of India · Tier 1: company or exchange filing · 11 Nov 2026
- S32Imposition of fine by BSE & NSE, quarter ended 31 Mar 2026 (Reg 17(1)) · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 27 May 2026
- S33Imposition of fine by BSE & NSE, quarter ended 30 Jun 2026 (Reg 17(1)) · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 26 Aug 2026
- S34Appointment of joint statutory auditors by C&AG for FY 2026-27 · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 18 Sep 2026
- S35Extension of tenure of Chairman & Managing Director · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 28 Jul 2026
- S36Completion of acquisition of Sinnar Thermal Power Ltd by MAHAGENCO-NTPC consortium · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 25 Feb 2026
- S37Board approval to issue NCDs up to Rs 12,000 crore · NTPC Ltd (company IR site; same document filed with BSE/NSE) · Tier 1: company or exchange filing · 24 Jul 2026
Changes to this page (v1 · 11 Nov 2026)
- v1 · 11 Nov 2026First version. (first version)
Numbers come only from tier 1 and tier 2 sources. Read how we research.
Disclaimer
For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.
Investing in securities involves risk, including loss of capital. Before making any investment decision, do your own research and consider consulting a SEBI-registered investment adviser.
Cityfort, its owners and contributors may or may not hold securities of companies covered. Content is not an offer or solicitation to buy or sell any security.
Read the full disclaimerHide the full disclaimer
Cityfort publishes educational content that explains how listed companies work. Cityfort is not registered with the Securities and Exchange Board of India (SEBI) as an Investment Adviser or Research Analyst and does not provide investment advice, recommendations, ratings, price targets or any opinion on whether to buy, sell or hold any security.
All information is taken from publicly available sources, mainly company filings on BSE and NSE, which are listed on each page with dates. We work to keep it accurate and correct errors publicly, but we do not guarantee that it is complete, accurate or up to date. Any market price or price-based ratio shown is dated, may be out of date by the time you read it, and is included only to explain concepts.
Statements by company management are reported as statements, with their date and source; they are not our forecasts.