IREDA: how the business works

IREDA is a government-controlled lender that funds solar, wind, hydro and other clean-energy projects; it earned ₹1,873 crore of profit in FY26.

Follow IREDA

Email me when IREDA's page is updated after results.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

Indian Renewable Energy Development Agency Limited · New Delhi · Founded 1987

Updated for Q2 FY27 · checked

Total income, FY26
₹8,337 cr
Profit, FY26
₹1,873 cr
Loan book, 30 Sep 2026
₹97,411 cr
Set up
1987
Government of India holding, Sep 2026
71.76%

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

The short version

IREDA in 5 points

  1. 1 · What it sells

    IREDA lends money for many years to solar, wind, hydro, ethanol and clean-energy equipment projects and to state power utilities, and its loan book was ₹97,411 crore at 30 Sep 2026.

    More: what it sells

  2. 2 · Who pays it

    Borrowers pay IREDA interest, and at 30 Jun 2026 solar was 26% of its loans, state power utilities 19%, wind 11%, equipment manufacturing 11%, hydro 8%, ethanol 8%, hybrid wind-solar 6% and other sectors 10%.

    More: who pays it

  3. 3 · What it keeps from ₹100

    Of every ₹100 that came in to IREDA in FY26, it kept ₹22.5 as profit, after ₹58.8 of interest to its own lenders, ₹9.3 of bad-loan provisions and ₹5.6 of tax.

    More: what it keeps from ₹100

  4. 4 · Where the operating profit comes from

    IREDA's profit comes from the gap between the interest it earns and the interest it pays, which was ₹3,275 crore of net interest income in FY26, against ₹158 crore of fees and other income.

    More: where the operating profit comes from

  5. 5 · The one thing to watch

    IREDA's gross NPA (loans not being repaid) was 3.57% of loans at 30 Sep 2026, against 2.45% at 31 Mar 2025, while its provision cover rose from 45.31% to 70.44%.

    More: the one thing to watch

Sources: From IREDA's FY26 annual report, its FY25 annual report and its Q1 and Q2 FY27 results and presentations · checked

01Where the money goes · FY26

Where does ₹100 of IREDA's money go?

Of every ₹100 that came in (revenue plus other income), this is where it went.

IREDA · FY26

Receipt for every ₹100

Where ₹100 of IREDA's money went in FY26
Interest paid to its own lenders₹58.8
Employees₹1.3
Other running costs, depreciation and CSR₹2.0
Exchange-rate losses₹0.5
Provisions for bad loans₹9.3
Tax₹5.6
Kept as profit₹22.5
Total₹100

Each line = amount ÷ total money in × 100. Lines may not add to exactly ₹100 because of rounding.

How this is worked out

Of every ₹100 that came in to IREDA in FY26. Cityfort calculation from the FY26 standalone accounts: each line ÷ total income of ₹8,337 crore (interest ₹8,179 crore + fees and other income ₹158 crore).

Save this receipt as an image

Embed this receipt or the key numbers

Paste this code into a blog or website to show the card you choose, with a link back to this page.

Each week: the next company due to report results, explained in 5 points.

We'll email you once a week with what changed on Cityfort. Facts only, no tips. Unsubscribe any time.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

02The business in one line

What does IREDA do?

Clean-energy companies and state power utilities pay IREDA interest on long loans; most of that money goes on interest to IREDA's own lenders, and what's left after running costs, bad-loan provisions and tax is profit.

  • In FY26 IREDA earned ₹8,179 crore of interest. Fees and other income added ₹158 crore.
  • Interest to its own lenders took ₹4,905 crore. After ₹319 crore of running costs, ₹777 crore of bad-loan provisions and ₹464 crore of tax, ₹1,873 crore was profit.

03Who pays it

Who pays IREDA?

IREDA does not disclose how much each type of customer pays.

  • Solar power companies

    Pay interest on loans for solar plants: 26% of loans at 30 Jun 2026.

  • State power utilities

    State-owned generation and other power companies: 19% of loans, down from 23% at 31 Mar 2026.

  • Wind power companies

    11% of loans.

  • Clean-energy equipment makers

    Factories making renewable-energy equipment: 11% of loans, up from 7% at 30 Jun 2025.

  • Hydro power and ethanol producers

    8% of loans each.

  • Hybrid wind-solar projects

    6% of loans.

  • Other sectors

    10% of loans (Cityfort calculation from the Q1 FY27 presentation): smart meters, battery storage, biomass, electric vehicles, waste-to-energy, short-term loans and others.

How spread out the customers are

IREDA does not disclose income by customer. Its 20 largest borrowers held ₹40,285 crore, or 43.29% of advances, at 31 Mar 2026. The shares above are of loans outstanding, not of income.

04How it makes money

How does IREDA make money?

IREDA earns the gap between what clean-energy borrowers pay it and what it pays to borrow

IREDA borrows from bond markets, banks and foreign lenders and lends for many years at higher rates. Its running costs are small: ₹319 crore in FY26, against ₹3,275 crore of net interest income. So profit depends mostly on that gap and on bad loans.

Net interest margin (NIM), as reported in the annual reports

2.8%3.7%

FY23 to FY26

  1. Government ownership and an AAA rating let IREDA borrow at 7.20% (30 Sep 2026)
  2. It lends to solar, wind, hydro and other clean-energy projects for many years
  3. Borrowers paid a 9.41% yield on its loans, a 2.21% spread over its cost
  4. 208 employees and 16 workers keep running costs low
  5. Profit adds to net worth, which RBI capital rules require for more lending
  6. When capital runs short it sells new shares: ₹2,005.90 crore in Jun 2025

↺ Step 6 feeds back into step 1.

05The numbers · Standalone · ₹ crore

How has IREDA done?

Net interest income

₹3,275 crFY26

IREDA's net interest income, interest earned minus interest paid, rose every year, from ₹1,126 crore in FY22 to ₹3,275 crore in FY26.

* FY22: NIM on the RHP's definition.

₹ crore · interest earned minus interest paid

See the yearly numbers
Net interest income by year, ₹ crore
YearInterest earnedInterest paidNet interest income
FY22 (NIM on the RHP's definition)₹2,713₹1,587₹1,126
FY23₹3,374₹2,088₹1,285
FY24₹4,822₹3,164₹1,658
FY25₹6,575₹4,141₹2,434
FY26₹8,179₹4,905₹3,275
See the quarterly numbers
Net interest income by quarter, ₹ crore
QuarterNet interest income
Q3 FY25₹622
Q4 FY25₹757
Q1 FY26₹691
Q2 FY26₹817
Q3 FY26₹869
Q4 FY26₹897
Q1 FY27₹857
Q2 FY27₹940

Net profit

₹1,873 crFY26

Profit rose every year, from ₹634 crore in FY22 to ₹1,873 crore in FY26; FY26 growth was 10.3%, with bad-loan provisions of ₹777 crore against ₹237 crore in FY25.

* FY22: NIM on the RHP's definition.

₹ crore

See the yearly numbers
Net profit by year, ₹ crore
YearProfit before provisionsProvisionsNet profit
FY22 (NIM on the RHP's definition)₹1,014₹180₹634
FY23₹1,206₹66.6₹865
FY24₹1,618−₹67.2₹1,252
FY25₹2,341₹237₹1,699
FY26₹3,114₹777₹1,873
See the quarterly numbers
Provisions and net profit by quarter, ₹ crore
QuarterProvisionsNet profit
Q3 FY25₹104₹425
Q4 FY25₹129₹502
Q1 FY26₹363₹247
Q2 FY26₹69.9₹549
Q3 FY26₹129₹585
Q4 FY26₹215₹493
Q1 FY27₹419₹338
Q2 FY27₹187₹554

Net interest margin

3.65%FY26

IREDA's reported net interest margin (NIM: net interest income as a share of the assets that earn interest) rose from 2.82% in FY23 to 3.65% in FY26; FY22's 3.75% uses the IPO prospectus's different definition.

% · as reported by the company

See the numbers
Net interest margin (% · as reported by the company)
PeriodNIM
FY22 (NIM on the RHP's definition)3.75%
FY232.82%
FY242.85%
FY253.27%
FY263.65%
Q3 FY253.33%
Q4 FY253.27%
Q1 FY263.6%
Q2 FY263.72%
Q3 FY263.74%
Q4 FY263.65%
Q1 FY273.75%
Q2 FY273.83%

Bad loans (gross NPA)

3.49%FY26

Gross NPA (loans not being repaid) fell from 5.21% of loans at 31 Mar 2022 to 2.36% at 31 Mar 2024, rose to 4.13% at 30 Jun 2025, and was 3.57% at 30 Sep 2026.

* FY22: NIM on the RHP's definition.

% of loans · gross and net (after provisions) non-performing assets

See the yearly numbers
Gross and net NPA by year, % of loans
YearGross NPANet NPAProvision cover
FY22 (NIM on the RHP's definition)5.21%3.12%41.45%
FY233.21%1.66%49.25%
FY242.36%0.99%58.8%
FY252.45%1.35%45.31%
FY263.49%1.29%63.88%
See the quarterly numbers
Gross and net NPA by quarter, % of loans
QuarterGross NPANet NPA
Q3 FY252.68%1.50%
Q4 FY252.45%1.35%
Q1 FY264.13%2.06%
Q2 FY263.97%1.97%
Q3 FY263.75%1.68%
Q4 FY263.49%1.29%
Q1 FY273.76%1.23%
Q2 FY273.57%1.08%
See all yearly numbers
IREDA lending numbers, FY22–FY26, ₹ crore
YearInterest earnedNet interest incomeOther incomeOperating costsProvisionsNet profitLoansDepositsEPS (₹)
FY22 (NIM on the RHP's definition) (restated)₹2,713₹1,126₹161₹273₹180₹634₹33,931–₹8.03†
FY23 (restated)₹3,374₹1,285₹109₹189₹66.6₹865₹47,076–₹3.78†
FY24 (restated)₹4,822₹1,658₹143₹183−₹67.2₹1,252₹59,698–₹5.16
FY25₹6,575₹2,434₹179₹273₹237₹1,699₹76,282–₹6.32
FY26₹8,179₹3,275₹158₹319₹777₹1,873₹93,069–₹6.73

† Restated by the company. FY22 EPS (₹8.03) is as restated in the IPO prospectus, on a weighted 78.87 crore shares: the government's rights issue of 150 crore shares was completed on 31 Mar 2022, so FY22 counts them for one day. FY23 uses 228.46 crore shares. Shares rose to 268.78 crore after the Nov 2023 IPO and 280.92 crore after the Jun 2025 QIP.

Net interest income = interest earned on loans and investments minus interest paid on deposits and borrowings. Provisions = money set aside for loans that may not be repaid. Financial year runs April to March.

  • All figures are IREDA alone (standalone). IREDA had no subsidiary in FY22–FY24; its GIFT City subsidiary, set up in May 2024, changed FY26 profit by under 0.5% (₹1,874.00 crore consolidated against ₹1,873.34 crore standalone).
  • FY22 and FY23 come from the restated financial statements in IREDA's IPO prospectus (RHP, Nov 2023), converted from ₹ million. FY23 matches the comparative figures in the FY24 annual report.
  • FY24 capital adequacy is 15.51% (Tier I 13.94%), as restated in the FY25 annual report; IREDA first reported 20.11% (Tier I 18.08%). From 31 Mar 2025 it moved loans to commissioned renewable projects running for over a year from a 50% to a 100% risk weight, and restated 31 Mar 2024 on that basis.
  • FY26 capital adequacy of 20.59% includes RBI's 1 Jan 2026 risk-weight change, which cut risk-weighted assets by ₹7,787.77 crore and added 1.83 percentage points. RBI requires an NBFC-IFC to hold capital adequacy of at least 15%, with Tier I of at least 10%.
  • NIM: FY23–FY26 are the margins in IREDA's annual reports and presentations. The series breaks at FY22: its 3.75% is from the IPO prospectus, which divides net interest income, including exchange-rate translation, by average interest-earning assets. On that basis FY23 was 3.32%, against 2.82% in the annual report.
  • Quarterly NIMs are the presentations' annualised year-to-date figures (Q1 = the quarter, Q2 = first half, Q3 = nine months, Q4 = full year), not each quarter alone.
  • Operating expenses are all costs other than interest paid and provisions, including exchange-rate losses or gains on foreign borrowing and CSR. Operating profit and cost-to-income (operating expenses ÷ (net interest income + other income)) are Cityfort calculations from the results.
  • ROA and ROE are Cityfort calculations: profit ÷ the average of opening and closing total assets, and of equity, the formulas IREDA's prospectus uses. IREDA's own return on net worth was 16.40% in FY24, 17.44% in FY25 and 15.07% in FY26, on a formula it does not state.
  • Provisions are impairment on financial instruments; FY24's −₹67.22 crore is a net write-back.
  • Loans are IREDA's loan book (gross term loans outstanding), the base of its NPA ratios. Net loans on the balance sheet were ₹90,196.59 crore at 31 Mar 2026.
  • NBFCs report no CET1 ratio. Tier I capital was 17.60% in FY22, 15.71% in FY23, 13.94% in FY24 (restated), 15.15% in FY25 and 18.41% in FY26. IREDA takes no public deposits, so deposits and CASA are blank.
  • Q3 FY25 figures are from the results PDF; the machine-readable (XBRL) filing for that quarter carries nine-month figures.

06Who runs it

Who runs IREDA, and did they deliver?

  • Jatin Kumar Nayak

    Chairman and Managing Director · since 2026

    Took charge on 30 Oct 2026 under a Ministry of New and Renewable Energy order of 29 Oct 2026; tenure to 30 Jun 2029, as corrected on 31 Oct 2026.

  • Bijay Kumar Mohanty

    Director (Finance) and Chief Financial Officer

    Also held additional charge as CMD from 1 Jul 2026 to 30 Oct 2026, after Pradip Kumar Das retired on 30 Jun 2026.

  • Ekta Madan

    Company Secretary and Compliance Officer

What they said, and what happened

1 partly delivered · 2 too early to tell

  1. Said on 29 Aug 2024

    IREDA's board gave in-principle approval on 29 Aug 2024 to raise up to ₹4,500 crore of equity, in one or more tranches.

    What happened

    IREDA raised ₹2,005.90 crore through a QIP in Jun 2025. The government's approval of 18 Sep 2024 allowed QIP dilution of up to 7% of post-issue equity.

    Partly delivered
  2. Said on 6 Feb 2026

    The board approved on 6 Feb 2026 a QIP of up to ₹2,994 crore, with the government's holding diluted by no more than 3.76% of post-issue capital. Shareholders passed it on 14 Mar 2026.

    What happened

    No allotment had been filed by the Q2 FY27 shareholding pattern: shares were unchanged at 2,809,231,268 on 30 Sep 2026.

    Too early to tell
  3. Said on 19 Mar 2026

    The board approved on 19 Mar 2026 a market borrowing programme of up to ₹40,000 crore for FY27.

    What happened

    IREDA raised ₹10,071 crore of borrowings in H1 FY27, according to its Q2 FY27 presentation.

    Too early to tell

07What could go wrong

What could go wrong for IREDA?

  • Concentration

    Bad loans have risen since Mar 2025

    Gross NPA rose from 2.45% at 31 Mar 2025 to 4.13% at 30 Jun 2025. ICRA ties the rise in gross stage 3 loans to 3.8% at 31 Dec 2025 to two Gensol group borrowers (about ₹670 crore) and about ₹780 crore reclassified after a court order.

    Watch Gross NPA: 3.57% at 30 Sep 2026, with provision cover of 70.44%.

  • Legal

    Loans kept as standard under court orders

    The auditors pointed to ₹386.76 crore of accounts that IREDA keeps as standard under interim High Court orders, though RBI norms would class them as NPA. Interest on them is booked only when collected.

    Watch Court rulings on these accounts and the amount in the next audit report.

  • Concentration

    A few large borrowers

    The 20 largest borrowers held 43.29% of advances at 31 Mar 2026. ICRA says wholesale lending exposes IREDA to lumpy slippages, and that much of the book is recent and unseasoned.

    Watch The top-20 share in the FY27 annual report.

  • Debt

    ICRA says growth needs more capital

    ICRA (16 Apr 2026) says IREDA would need to raise capital periodically over the next 2–3 years. Debt was 5.64 times equity at 30 Sep 2026, and capital adequacy 19.83% against RBI's 15% minimum.

    Watch Whether the ₹2,994 crore QIP approved in Mar 2026 is launched.

  • Pricing

    A narrower spread

    The yield on loans fell from 9.87% at 30 Sep 2025 to 9.41% at 30 Sep 2026, while the cost of borrowings went from 7.24% to 7.20%. The spread narrowed from 2.63% to 2.21%. The RHP says there are limits to passing higher funding costs to borrowers.

    Watch The spread in the Q3 FY27 presentation.

  • Regulation

    RBI capital rules move the ratio

    Moving commissioned renewable loans from a 50% to a 100% risk weight cut FY24 capital adequacy from 20.11% to 15.51% on restatement. RBI's 1 Jan 2026 change added 1.83 percentage points to FY26's 20.59%.

    Watch RBI risk-weight rules for project loans.

  • Currency

    Foreign-currency borrowing

    Foreign borrowings were ₹11,505 crore of ₹80,882 crore at 30 Sep 2026, 82% of them hedged. FY26 exchange-rate losses were ₹43.41 crore.

    Watch The hedged share of foreign borrowings.

  • Governance

    Board appointments rest with the ministry

    NSE and BSE fined IREDA over board and committee composition in Aug 2026; IREDA says the ministry appoints its directors. The CMD post was on additional charge from 1 Jul to 30 Oct 2026.

    Watch Appointment of more independent directors by the ministry.

08Supporters and critics

What do supporters and critics point to?

Facts each side points to. We don't say which side is right.

What supporters point to

  • Total income rose every year, from ₹2,874 crore in FY22 to ₹8,337 crore in FY26, and profit from ₹634 crore to ₹1,873 crore.
  • The reported net interest margin rose from 2.82% in FY23 to 3.65% in FY26, and was 3.83% for H1 FY27.
  • ICRA rates IREDA AAA (Stable), citing its sovereign ownership and strategic importance to the government (16 Apr 2026).
  • Provision cover rose from 45.31% at 31 Mar 2025 to 70.44% at 30 Sep 2026, and net NPA fell from 2.06% at 30 Jun 2025 to 1.08%.
  • Operating costs were 9.3% of net interest and other income in FY26 (Cityfort calculation).

What critics point to

  • Gross NPA was 3.57% at 30 Sep 2026, against 2.36% at 31 Mar 2024, and two Gensol accounts were declared fraud in Jul 2026.
  • The spread narrowed from 2.63% at 30 Sep 2025 to 2.21% at 30 Sep 2026.
  • ICRA (16 Apr 2026) says IREDA would need to raise capital periodically over the next 2–3 years; a further ₹2,994 crore QIP was approved in Mar 2026.
  • The 20 largest borrowers held 43.29% of advances at 31 Mar 2026.
  • Bad-loan provisions were ₹777 crore in FY26, against ₹237 crore in FY25, and ₹605 crore in H1 FY27.

09What to watch next

What should you watch next at IREDA?

Next event

Q3 FY27 results (date not announced yet)

Date not announced yet.

  • Bad loans and court cases

    Gross NPA was 3.57% at 30 Sep 2026. ₹386.76 crore of accounts that would otherwise be NPA are kept as standard under interim High Court orders.

  • A second QIP

    Shareholders approved up to ₹2,994 crore in Mar 2026, with the government's dilution capped at 3.76%. Capital adequacy was 19.83% at 30 Sep 2026.

  • Spread and new loan approvals

    The spread was 2.21% at 30 Sep 2026, against 2.63% a year earlier. Q1 FY27 sanctions were ₹3,380 crore, against ₹11,740 crore in Q1 FY26.

10Key facts

Key facts about IREDA

What does IREDA do?
Indian Renewable Energy Development Agency (IREDA) is a New Delhi-based lender set up in 1987 to fund renewable energy. It lends to solar, wind, hydro, ethanol and clean-energy equipment projects and to state power utilities. RBI registers it as a non-deposit-taking infrastructure finance company (NBFC-IFC) in the Middle Layer.
How does IREDA make money?
IREDA earns mostly interest on loans. In FY26 IREDA earned ₹8,179 crore of interest out of ₹8,337 crore of total income, and paid ₹4,905 crore of interest to its own lenders.
Who are IREDA's customers?
IREDA's borrowers are renewable-energy companies, clean-energy equipment makers and state power utilities. At 30 Jun 2026 solar was 26% of IREDA's loans, state power utilities 19%, wind 11% and equipment manufacturing 11%. Private borrowers held 77% of IREDA's loans and public borrowers 23%.
How big is IREDA?
IREDA's loan book was ₹97,411 crore at 30 Sep 2026. In FY26 IREDA's total income was ₹8,337 crore and its profit ₹1,873 crore, up from ₹1,699 crore in FY25.
Who owns IREDA?
The President of India, through the Ministry of New and Renewable Energy, owned 71.76% of IREDA at 30 Sep 2026. Individuals and other non-institutional shareholders held 23.14%, foreign investors 2.57% and Indian institutions 2.53%.
When did IREDA list on the stock exchanges?
IREDA listed on NSE and BSE on 29 Nov 2023. Its IPO at ₹32 a share (Nov 2023) raised ₹2,150.22 crore: about ₹1,290.13 crore of new shares for IREDA and about ₹860.08 crore of shares sold by the government.
How much of IREDA's lending is not being repaid?
IREDA's gross NPA (loans not being repaid) was 3.57% of its loans at 30 Sep 2026, against 2.45% at 31 Mar 2025. IREDA's net NPA, after provisions, was 1.08% at 30 Sep 2026.
Does IREDA pay a dividend?
IREDA's first dividend since listing was for FY26: an interim ₹0.60 a share and a final ₹0.75 recommended by the board on 29 May 2026, ₹1.35 in all. IREDA paid no dividend for FY24 or FY25.

Go deeper

More detail from the same filings. Open any section.

11What it sells

11What it sells

What does IREDA sell?

IREDA lends money to renewable-energy projects for many years and charges interest. Loans pay for solar and wind farms, hydro plants, ethanol plants and factories that make clean-energy equipment. It also lends to state power utilities. Shares below are of loans at 30 Jun 2026, the latest sector split in readable form; the 30 Sep 2026 slide is published only as an image.
  • Solar power loans

    Loans to solar power projects: ₹24,483 crore, 26% of loans at 30 Jun 2026.

  • Loans to state power utilities

    Loans to state-owned power companies: ₹18,416 crore, 19% of loans.

  • Wind power loans

    ₹10,764 crore, 11% of loans.

  • Clean-energy manufacturing loans

    Loans to factories that make renewable-energy equipment: ₹10,756 crore, 11% of loans.

  • Hydro and ethanol loans

    Hydro power ₹8,044 crore and ethanol plants ₹7,259 crore: 8% of loans each.

  • Hybrid wind-solar and newer areas

    Hybrid wind-solar ₹5,416 crore (6%), smart meters ₹1,990 crore, battery storage ₹907 crore and electric vehicles ₹690 crore.

What it does

  • Does: Lends for many years to clean-energy projects, equipment makers and state utilities: private borrowers held 77% of its loans at 30 Jun 2026
  • Does: Borrows from bond investors, banks and foreign lenders: ₹80,882 crore of borrowings at 30 Sep 2026
  • Does: Owns one 50 MW solar power plant of its own in Kasaragod, Kerala, running since Sep 2017

What it does not do

  • Does not: It is not a bank and takes no public deposits; RBI registers it as a non-deposit-taking NBFC
  • Does not: Apart from its one solar plant, it does not make electricity; it lends to the companies that do
  • Does not: Its lending abroad is small so far: its GIFT City subsidiary sanctioned its first loan, USD 22.5 million for a Zambian solar plant, in FY26
12How the money flows

12How the money flows · FY26

How does money flow through IREDA?

Money in

  • Interest income (mostly on loans)₹8,179 cr
  • Fees and other income₹158 cr

The company

IREDA

₹8,337 cr came in

Money out

  • Interest paid to bondholders, banks and foreign lenders₹4,905 cr
  • Employees₹105 cr
  • Other running costs, depreciation and CSR₹170 cr
  • Exchange-rate losses₹43.4 cr
  • Provisions for bad loans₹777 cr
  • Tax₹464 cr
  • Net profit₹1,873 cr
  1. These are IREDA's own (standalone) FY26 accounts. Its one subsidiary, in GIFT City, is small.
  2. IREDA earned ₹8,179 crore of interest. Fees and other income added ₹158 crore.
  3. It paid ₹4,905 crore of interest to its own lenders, leaving ₹3,275 crore of net interest income.
  4. Staff, running costs, CSR and exchange-rate losses took ₹319 crore. It set aside ₹777 crore for bad loans.
  5. After ₹464 crore of tax, ₹1,873 crore was profit.
13What it needs to run

13What it needs to run

What does IREDA need to run?

  • Borrowed money

    Borrowings were ₹80,882 crore at 30 Sep 2026: bonds ₹33,180 crore, bank and institution loans ₹36,198 crore and foreign loans ₹11,505 crore, 82% of them hedged. Its cost of borrowings was 7.20%.

  • Credit rating

    ICRA rates IREDA's long-term debt AAA (Stable) (16 Apr 2026), citing its government ownership. S&P rates it BBB (Stable). A high rating lets it borrow at lower rates.

  • Capital

    Capital adequacy (own money as a share of risk-weighted loans) was 19.83% at 30 Sep 2026. RBI requires at least 15% for an NBFC-IFC, with Tier I capital of at least 10%.

  • RBI registration

    RBI registers IREDA as a non-deposit-taking NBFC in the Middle Layer and as an infrastructure finance company (NBFC-IFC), under a certificate dated 13 Mar 2023.

  • Government support

    ICRA says the government guaranteed about 10% of IREDA's borrowings at 31 Dec 2025, and that IREDA channels government subsidies and schemes for renewable energy.

  • People

    IREDA had 208 permanent employees and 16 permanent workers at the end of FY26.

14Competitors and what protects it

14Competitors and what protects it

Who does IREDA compete with?

IREDA's IPO prospectus (RHP, Nov 2023) names power-sector lenders as its primary peers, quoting an industry report commissioned by IREDA from CARE Advisory Research & Training. It says it also competes with banks, financial institutions and other NBFCs.
  • Power Finance Corporation (PFC)

    NSE: PFC

    A power-sector lender named as a competitor in IREDA's RHP; such lenders fund thermal plants, power lines and renewable projects, according to the industry report quoted there.

  • REC Ltd

    NSE: REC

    A power-sector lender named as a competitor in IREDA's RHP. The RHP notes REC is a 52.63% subsidiary of PFC.

  • PTC India Financial Services

    NSE: PFS

    A power-financing NBFC named as a competitor in IREDA's RHP, from the industry report quoted there.

  • Tata Cleantech Capital

    An unlisted power-financing NBFC named as a competitor in IREDA's RHP, from the industry report quoted there.

  • India Infradebt

    An unlisted lender named as a competitor in IREDA's RHP, from the industry report quoted there.

What protects the business

Each strength is scored 1 (weak) to 5 (strong) for the business, with the reason. It is not a rating of the share.

  • Cost of borrowing4 of 5

    ICRA rates IREDA AAA (Stable), citing its sovereign ownership, and says about 10% of its borrowings were government-guaranteed (31 Dec 2025). Its cost of borrowings was 7.20% at 30 Sep 2026.

  • Government role4 of 5

    ICRA notes IREDA's strategic importance to the government and its role in channelling renewable-energy subsidies and schemes.

  • Running costs4 of 5

    Operating costs were 9.3% of net interest and other income in FY26 (Cityfort calculation), with 208 permanent employees.

Weak spot

Capital needs and large single loans

ICRA (16 Apr 2026) says IREDA "would need to frequently raise capital periodically over the next 2-3 years to support growth" and that its wholesale loans bring high concentration. The 20 largest borrowers were 43.29% of advances at 31 Mar 2026.

15Where growth could come from

15Where growth could come from

Where could IREDA's growth come from?

Bijay Kumar Mohanty, then CMD (additional charge) and Director (Finance), wrote in the FY26 annual report (letter dated 1 Sep 2026) that IREDA intends to keep financing green hydrogen, battery storage, pumped storage, offshore wind and green transmission. He said the board approved widening IREDA's objects to areas such as nuclear power infrastructure and data centres, subject to approvals. IREDA publishes no numeric loan-growth guidance in the documents on file.
Management statement, 1 Sep 2026. Reported as a statement, not our forecast.
  • Overall loan book

    Working

    ₹97,411 cr (Sep 2026), from ₹76,282 cr (Mar 2025)

    The loan book grew 22.0% in FY26, to ₹93,069 crore, and 4.7% more by 30 Sep 2026 (Cityfort calculations from the FY26 annual report and the Q2 FY27 presentation).

    Status: Working, on track against what the company said.

  • Clean-energy manufacturing

    Working

    ₹10,756 cr (Jun 2026), from ₹8,984 cr (Mar 2026)

    Loans to factories making renewable-energy equipment were 11% of loans at 30 Jun 2026. Manufacturing got ₹12,857 crore of IREDA's ₹51,883 crore of FY26 sanctions (loans approved).

    Status: Working, on track against what the company said.

  • Battery storage

    New

    ₹907 cr (Jun 2026), from nil (Jun 2025)

    FY26 sanctions for battery energy storage systems were ₹2,064 crore.

    Status: New, recently announced.

  • Lending abroad through GIFT City

    Early

    USD 22.5 million first loan (FY26)

    IREDA's wholly owned GIFT City subsidiary sanctioned its first loan, to a 100 MW solar plant in Zambia. The first disbursement came after the year end.

    Status: Early, too early to judge.

  • New loan approvals

    Mixed

    ₹3,380 cr in Q1 FY27, from ₹11,740 cr in Q1 FY26

    FY26 sanctions reached ₹51,883 crore, up from ₹47,453 crore in FY25. Q1 FY27 sanctions were 71% lower than in Q1 FY26 (Cityfort calculation); the Q2 FY27 figures are published only as an image.

    Status: Mixed, partly on track.

Status compares progress with what the company itself said it would do: Working = on track against what the company said; Mixed = partly on track; Behind = behind the company's own plan; New = recently announced; Early = too early to judge.

16Financial strength: capital, bad loans, deposits

16Financial strength · FY26

How strong is IREDA's balance sheet?

Capital adequacy (CRAR: own money as a share of risk-weighted loans) was 21.22% at 31 Mar 2022 and 20.59% at 31 Mar 2026; FY24's 15.51% is as restated in the FY25 annual report, first reported as 20.11%.
  • Loans given (advances)₹93,069 cr
Capital adequacy (CRAR)
20.59%
capital as a share of risk-weighted loans; regulators set a minimum
Gross NPA
3.49%
loans not being repaid, as % of all loans
Net NPA
1.29%
the same, after money already set aside
Provision cover
63.88%
share of bad loans already provided for
Cost to income
9.3%
₹ of running costs per ₹100 of income after interest paid
Return on assets
2.16%
profit as % of everything the lender owns
Return on equity
15.58%
profit as % of shareholders' money

Figures as on FY26 year end (standalone, as banks report these ratios). Reported by the company; see the dates on each source.

17Who owns it

17Who owns it · Q2 FY27

Who owns IREDA?

  • Promoters (founders or parent company)71.8%
  • Foreign institutions (FII)2.6%
  • Indian institutions (DII)2.5%
  • Public and others23.1%

Promoter pledge

No promoter shares were pledged in Q2 FY27.

How ownership changed
IREDA shareholding by quarter, %
QuarterPromotersFIIDIIPublicPledged*
Q3 FY2475.0%1.9%4.4%18.8%0.0%
Q4 FY2475.0%1.4%1.0%22.7%0.0%
Q1 FY2575.0%2.7%0.4%21.9%0.0%
Q2 FY2575.0%2.0%0.4%22.6%0.0%
Q3 FY2575.0%1.9%0.6%22.5%0.0%
Q4 FY2575.0%1.8%0.5%22.7%0.0%
Q1 FY2671.8%2.0%3.0%23.3%0.0%
Q2 FY2671.8%1.9%2.6%23.8%0.0%
Q3 FY2671.8%2.1%2.5%23.7%0.0%
Q4 FY2671.8%2.1%2.5%23.7%0.0%
Q1 FY2771.8%2.5%2.4%23.4%0.0%
Q2 FY2771.8%2.6%2.5%23.1%0.0%

* Pledged = share of the promoters' own holding reported as pledged. In older filings this can include shares “otherwise encumbered”; the governance flags say when.

18What it does with profit

18What it does with profit

What does IREDA do with its profit?

FY26 was IREDA's first dividend since listing: an interim ₹0.60 (record date 2 Apr 2026) and a final ₹0.75 recommended on 29 May 2026 (record date 11 Sep 2026). DIPAM, the government's investment department, exempted IREDA from paying a dividend for FY24 and FY25 so it could build capital. Shareholders approved a further QIP of up to ₹2,994 crore on 14 Mar 2026; no allotment had been filed by 30 Sep 2026.

Dividend per share

₹1.35FY26

Dividend paid for each share, by financial year.

₹ per share

See the numbers
Dividend per share (₹ per share)
YearDividend per shareShare of profit paid out
FY24₹0.00–
FY25₹0.00–
FY26₹1.35–
  • Money raised · 31 Mar 2022

    Rights issue to the government of 1,500,000,000 shares at ₹10 (₹1,500 crore), completed on 31 Mar 2022 to support more renewable-energy lending.

    ₹1,500 cr

  • Money raised · 29 Nov 2023

    IPO at ₹32 a share (₹2,150.22 crore), listed on 29 Nov 2023: 403,164,706 new shares for IREDA (about ₹1,290.13 crore) and 268,776,471 shares sold by the government (about ₹860.08 crore). It was subscribed 38.59 times.

    ₹1,290 cr

  • Money raised · 11 Jun 2025

    QIP (new shares sold to large institutions) of 121,466,562 shares at ₹165.14, a 5% discount to the ₹173.83 floor price: ₹2,005.90 crore. The government's holding fell from 75.00% to 71.76%.

    ₹2,006 cr

19Governance signals

19Governance signals

What do IREDA's governance filings show?

Auditor
Shiv & Associates and MAPSS & Co (joint statutory auditors for FY27, appointed by the C&AG)
Auditor changes
25 Sep 2026: Shiv & Associates and Rao & Emmar (FY26) → Shiv & Associates and MAPSS & Co (FY27) (The Comptroller and Auditor General of India (C&AG) appoints the auditors of government companies; it named the FY27 pair in letters of 7 and 25 Sep 2026.)
Audit qualifications
None reported
Related-party dealings
The President of India, through the Ministry of New and Renewable Energy, owned 71.76% of IREDA at 30 Sep 2026 and appoints its directors. IREDA owns 100% of IREDA Global Green Energy Finance IFSC Ltd in GIFT City, which sanctioned its first loan in FY26 and made the first payout after the year end. ICRA says the government guaranteed about 10% of IREDA's borrowings at 31 Dec 2025.
Credit rating
ICRA AAA (outlook Stable), 16 Apr 2026

A credit rating describes the company's ability to repay debt. It is not a rating of the share.

Flags to know about

  • auditor · 19 Oct 2026

    Emphasis on loans kept as standard under court orders

    The Q2 FY27 audit opinion was unmodified. The auditors noted that IREDA classified ₹386.76 crore of accounts, which would otherwise be Stage III (NPA), as Stage II (standard) under interim orders of High Courts. IREDA books interest on them only when collected and has made impairment provisions.

  • regulatory · 27 Aug 2026

    Exchange fines over board composition

    NSE and BSE each fined IREDA ₹1,419,540 (₹0.14 crore), including GST, in notices dated 25 Aug 2026, for non-compliance with listing rules on board and committee composition. IREDA said its directors are appointed by the President of India through the Ministry of New and Renewable Energy, and that it is pursuing the ministry for more independent directors.

  • other · 10 Jul 2026

    Gensol loans declared fraud

    On 10 Jul 2026 IREDA said it had declared its loans to Gensol Engineering (₹453.77 crore outstanding) and Gensol EV Lease (₹218.97 crore) as fraud and reported them to RBI, as RBI rules require. It held 85% provisions on both at 31 Mar 2026. IREDA's FY26 annual report says it received SEBI's interim order of 16 Apr 2025 on irregularities in Gensol Engineering's operations.

  • other · 30 Oct 2026

    CMD post on additional charge for four months

    CMD Pradip Kumar Das retired on 30 Jun 2026. Director (Finance) Bijay Kumar Mohanty held additional charge until Jatin Kumar Nayak took over as CMD on 30 Oct 2026.

  • disclosure

    Errors in machine-readable results filings

    IREDA's Q3 FY25 machine-readable (XBRL) filing tags nine-month figures to the quarter, and its Q2 FY27 XBRL shows debt-to-equity as 0.0564 where the presentation shows 5.64. This page uses the results PDF and the presentation for those figures.

20What the market paid

20What the market paid · price as of 11 Nov 2026

What did the market pay for IREDA on 11 Nov 2026?

Price as of 11 Nov 2026 (shown for education; prices change daily).

Price as of 11 Nov 2026: ₹120.20, the NSE closing price. Market value: ₹33,767 crore (Cityfort calculation: price × 2,809,231,268 shares, from the NSE closing price and the Sep 2026 shareholding pattern). P/E is the price divided by a year's profit per share: EPS for the four quarters Q3 FY26 to Q2 FY27 adds to ₹7.02, which gives 17.1 (Cityfort calculation). P/B divides the price by book value (shareholders' money) per share: ₹14,337 crore at 30 Sep 2026, or ₹51.04 a share, gives 2.36 (Cityfort calculation). FY26 dividends of ₹1.35 a share were 1.12% of the 11 Nov 2026 price (Cityfort calculation). EV/EBITDA is not shown, because interest is a lender's main cost.

Share price
₹120.20
Market value (market cap)
₹33,767 cr
P/E
17.1×
P/B
2.4×

Source: NSE capital-market bhavcopy, 11 Nov 2026 (IREDA EQ close); Shareholding pattern as of 30 Sep 2026 (Q2 FY27, XBRL); Financial results Q3 FY26 standalone (XBRL) and 5 more

21How it got here

21How it got here

How did IREDA get here?

  1. 1987

    Milestone

    Set up to fund renewable energy

    IREDA was incorporated in 1987 as a financial institution under the then Department of Non-Conventional Energy Sources.

  2. 2017

    Milestone

    Its own solar plant

    IREDA commissioned a 50 MW solar plant of its own in Kasaragod, Kerala, in Sep 2017.

  3. 2022

    Milestone

    ₹1,500 crore from the government

    The government put in ₹1,500 crore of equity through a rights issue completed on 31 Mar 2022, to fund more renewable lending.

  4. 2023

    Business-model change

    Registered as an infrastructure lender, then listed

    RBI granted infrastructure finance company status on 13 Mar 2023. IREDA listed on 29 Nov 2023 after an IPO at ₹32 a share.

  5. 2024

    Milestone

    Navratna status and a GIFT City arm

    The Department of Public Enterprises granted Navratna status on 26 Apr 2024. The GIFT City subsidiary was incorporated on 7 May 2024.

  6. 2025

    Crisis

    Gensol loans go bad

    IREDA began a review of its Gensol Engineering loans on 25 Apr 2025; NCLT admitted its insolvency case on 13 Jun 2025. Gross NPA rose to 4.13% at 30 Jun 2025.

  7. 2025

    Milestone

    First share sale after listing

    A ₹2,005.90 crore QIP in Jun 2025 cut the government's holding from 75.00% to 71.76%.

  8. 2026

    Crisis

    Gensol accounts declared fraud

    IREDA told the exchanges on 10 Jul 2026 that it had declared the Gensol Engineering and Gensol EV Lease loans fraud and reported them to RBI.

  9. 2026

    Milestone

    New chairman

    Pradip Kumar Das retired on 30 Jun 2026; Jatin Kumar Nayak became CMD on 30 Oct 2026.

22Sources and changes

Where every number on this page comes from

Sources (52 documents)
  1. S1Annual Report FY26 (39th, 2025-26) with standalone and consolidated statements and BRSR · NSE (company filing) · Tier 1: company or exchange filing · 2 Sep 2026
  2. S2Annual Report FY25 (38th, 2024-25) · NSE (company filing) · Tier 1: company or exchange filing · 14 Jul 2025
  3. S3Annual Report FY24 (37th, 2023-24; statements in Rs lakh) · NSE (company filing) · Tier 1: company or exchange filing · 31 May 2024
  4. S4Red Herring Prospectus dated 11 Nov 2023 (IPO; restated financial information FY21-FY23 and H1 FY24, Rs million) · SEBI · Tier 1: company or exchange filing · 13 Nov 2023
  5. S5Financial results Q2 FY27 standalone (XBRL, audited) · NSE (company filing) · Tier 1: company or exchange filing · 19 Oct 2026
  6. S7Outcome of board meeting 19 Oct 2026: audited results Q2/H1 FY27 with auditor reports (scanned) · NSE (company filing) · Tier 1: company or exchange filing · 19 Oct 2026
  7. S8Financial results Q1 FY27 standalone (XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 3 Aug 2026
  8. S10Financial results Q4 FY26 and FY26 standalone (XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 29 May 2026
  9. S11Financial results Q4 FY26 and FY26 consolidated (XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 29 May 2026
  10. S12Financial results Q3 FY26 standalone (XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 9 Jan 2026
  11. S14Financial results Q2 FY26 standalone (XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 14 Oct 2025
  12. S16Financial results Q1 FY26 standalone (XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 10 Jul 2025
  13. S18Financial results Q4 FY25 and FY25 standalone (XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 15 Apr 2025
  14. S20Financial results Q3 FY25 and 9M FY25 standalone (PDF; the XBRL tags 9M values to the quarter) · NSE (company filing) · Tier 1: company or exchange filing · 9 Jan 2025
  15. S22Investor presentation Q2 FY27 (quarter and half year ended 30 Sep 2026; several slides are images) · NSE (company filing) · Tier 1: company or exchange filing · 19 Oct 2026
  16. S23Investor presentation Q1 FY27 (quarter ended 30 Jun 2026) · NSE (company filing) · Tier 1: company or exchange filing · 3 Aug 2026
  17. S24Investor presentation Q3 FY26 (period ended 31 Dec 2025) · NSE (company filing) · Tier 1: company or exchange filing · 9 Jan 2026
  18. S25Investor presentation Q2 FY26 (period ended 30 Sep 2025) · NSE (company filing) · Tier 1: company or exchange filing · 14 Oct 2025
  19. S27Investor presentation Q3 FY25 (quarter ended 31 Dec 2024) · NSE (company filing) · Tier 1: company or exchange filing · 9 Jan 2025
  20. S28Shareholding pattern as of 30 Sep 2026 (Q2 FY27, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 16 Oct 2026
  21. S29Shareholding pattern as of 30 Jun 2026 (Q1 FY27, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 17 Jul 2026
  22. S30Shareholding pattern as of 31 Mar 2026 (Q4 FY26, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 10 Apr 2026
  23. S31Shareholding pattern as of 31 Dec 2025 (Q3 FY26, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 6 Jan 2026
  24. S32Shareholding pattern as of 30 Sep 2025 (Q2 FY26, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 8 Oct 2025
  25. S33Shareholding pattern as of 30 Jun 2025 (Q1 FY26, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 16 Jul 2025
  26. S34Shareholding pattern as of 31 Mar 2025 (Q4 FY25, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 9 Apr 2025
  27. S35Shareholding pattern as of 31 Dec 2024 (Q3 FY25, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 15 Jan 2025
  28. S36Shareholding pattern as of 30 Sep 2024 (Q2 FY25, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 8 Oct 2024
  29. S37Shareholding pattern as of 30 Jun 2024 (Q1 FY25, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 10 Jul 2024
  30. S38Shareholding pattern as of 31 Mar 2024 (Q4 FY24, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 16 Apr 2024
  31. S39Shareholding pattern as of 31 Dec 2023 (Q3 FY24, XBRL) · NSE (company filing) · Tier 1: company or exchange filing · 17 Jan 2024
  32. S40ICRA rating rationale: [ICRA]AAA (Stable)/[ICRA]A1+ assigned; ratings reaffirmed (16 Apr 2026, revised) · ICRA · Tier 2: rating agency or regulator · 16 Apr 2026
  33. S41NSE capital-market bhavcopy, 11 Nov 2026 (IREDA EQ close) · NSE · Tier 1: company or exchange filing · 11 Nov 2026
  34. S42QIP opened; floor price Rs 173.83 approved (5 Jun 2025) · NSE (company filing) · Tier 1: company or exchange filing · 5 Jun 2025
  35. S43QIP closed; issue price Rs 165.14 (5% discount to floor) approved (10 Jun 2025) · NSE (company filing) · Tier 1: company or exchange filing · 10 Jun 2025
  36. S44QIP allotment of 12,14,66,562 shares, Rs 2,005.90 crore (11 Jun 2025) · NSE (company filing) · Tier 1: company or exchange filing · 11 Jun 2025
  37. S45Board approves QIP of up to Rs 2,994 crore (GoI dilution capped at 3.76%) and postal ballot (6 Feb 2026) · NSE (company filing) · Tier 1: company or exchange filing · 6 Feb 2026
  38. S46Postal ballot result: QIP special resolution passed (14 Mar 2026) · NSE (company filing) · Tier 1: company or exchange filing · 16 Mar 2026
  39. S47Board outcome 19 Mar 2026: FY26 borrowing plan raised to Rs 35,800 crore; FY27 market borrowing up to Rs 40,000 crore · NSE (company filing) · Tier 1: company or exchange filing · 19 Mar 2026
  40. S48Interim dividend Rs 0.60 per share for FY26 (25 Mar 2026) · NSE (company filing) · Tier 1: company or exchange filing · 25 Mar 2026
  41. S49Outcome of board meeting 29 May 2026: FY26 results; final dividend Rs 0.75 per share recommended · NSE (company filing) · Tier 1: company or exchange filing · 29 May 2026
  42. S50IREDA internal review of Gensol Engineering exposure (press release, 25 Apr 2025) · NSE (company filing) · Tier 1: company or exchange filing · 25 Apr 2025
  43. S51IBC application against Gensol Engineering admitted by NCLT Ahmedabad (13 Jun 2025) · NSE (company filing) · Tier 1: company or exchange filing · 13 Jun 2025
  44. S52Gensol Engineering and Gensol EV Lease accounts declared fraud and reported to RBI (10 Jul 2026) · NSE (company filing) · Tier 1: company or exchange filing · 10 Jul 2026
  45. S53DPE grants Navratna status (26 Apr 2024) · NSE (company filing) · Tier 1: company or exchange filing · 26 Apr 2024
  46. S54NSE and BSE fines for board/committee composition (27 Aug 2026) · NSE (company filing) · Tier 1: company or exchange filing · 27 Aug 2026
  47. S55CMD Pradip Kumar Das superannuated; additional charge to Director (Finance) Bijay Kumar Mohanty (1 Jul 2026) · NSE (company filing) · Tier 1: company or exchange filing · 1 Jul 2026
  48. S56Additional charge of CMD extended for 3 months (1 Oct 2026) · NSE (company filing) · Tier 1: company or exchange filing · 1 Oct 2026
  49. S57Jatin Kumar Nayak appointed CMD, assumed charge 30 Oct 2026 · NSE (company filing) · Tier 1: company or exchange filing · 30 Oct 2026
  50. S58Correction: CMD superannuation date 30 Jun 2029 (31 Oct 2026) · NSE (company filing) · Tier 1: company or exchange filing · 31 Oct 2026
  51. S59C&AG appoints joint statutory auditors for FY27 (25 Sep 2026) · NSE (company filing) · Tier 1: company or exchange filing · 25 Sep 2026
  52. S60GoI Alternative Mechanism approves QIP route up to 7% of post-issue equity (18 Sep 2024) · NSE (company filing) · Tier 1: company or exchange filing · 18 Sep 2024
Changes to this page (v1 · 12 Nov 2026)
  1. v1 · 12 Nov 2026First version. (first version)

Numbers come only from tier 1 and tier 2 sources. Read how we research.

Disclaimer

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

Investing in securities involves risk, including loss of capital. Before making any investment decision, do your own research and consider consulting a SEBI-registered investment adviser.

Cityfort, its owners and contributors may or may not hold securities of companies covered. Content is not an offer or solicitation to buy or sell any security.

Read the full disclaimer

Cityfort publishes educational content that explains how listed companies work. Cityfort is not registered with the Securities and Exchange Board of India (SEBI) as an Investment Adviser or Research Analyst and does not provide investment advice, recommendations, ratings, price targets or any opinion on whether to buy, sell or hold any security.

All information is taken from publicly available sources, mainly company filings on BSE and NSE, which are listed on each page with dates. We work to keep it accurate and correct errors publicly, but we do not guarantee that it is complete, accurate or up to date. Any market price or price-based ratio shown is dated, may be out of date by the time you read it, and is included only to explain concepts.

Statements by company management are reported as statements, with their date and source; they are not our forecasts.