Skip to content
New: 30 more Indian companies explained, from Ather and Pine Labs to IDBI Bank

Capital Goods · NSE: VIKRAMSOLR · BSE: 544488

Vikram Solar: how the business works

Vikram Solar makes solar panels in West Bengal and Tamil Nadu and sells them to power developers, contractors and distributors in India; its revenue was ₹4,802 crore in FY26.

Follow Vikram Solar

Email me when Vikram Solar's page is updated after results.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

Vikram Solar Limited · Kolkata, West Bengal (registered office) · Founded 2005

What changed in Q2 FY27 →

Updated for Q2 FY27 · checked

Revenue, FY26
₹4,802 cr
Net profit, FY26
₹470 cr
Module capacity, after 29 Jun 2026
15.5 GW
Founded
2005
Promoter holding, 30 Sep 2026
63.01%

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

The short version

Vikram Solar in 5 points

  1. 1 · What it sells

    Vikram Solar makes solar panels (modules) at plants in West Bengal and Tamil Nadu, with 15.5 GW of capacity after 29 Jun 2026, and its FY26 revenue was ₹4,802 crore.

    More: what it sells

  2. 2 · Who pays it

    In FY26 public-sector and government undertakings brought in 21.15% of Vikram Solar's revenue and private power producers, contractors, businesses and distributors 78.85%.

    More: who pays it

  3. 3 · What it keeps from ₹100

    Of every ₹100 that came in during FY26, including ₹58.5 crore of other income, Vikram Solar kept ₹9.7 as profit, with EBITDA from operations of ₹911 crore after a ₹5.6 crore one-off Labour Codes charge (Cityfort calculation).

    More: what it keeps from ₹100

  4. 4 · Where the operating profit comes from

    Vikram Solar reports one business segment, and sales of goods, mainly modules, made up ₹4,723 crore of its ₹4,802 crore FY26 revenue, with services at ₹80 crore.

    More: where the operating profit comes from

  5. 5 · The one thing to watch

    Vikram Solar's EBITDA margin was 9.4% in Q2 FY27, against 21.2% in Q2 FY26 (Cityfort calculation), and its borrowings rose to ₹632 crore on 30 Sep 2026 from ₹100 crore on 31 Mar 2026.

    More: the one thing to watch

Sources: From Vikram Solar's FY26 annual report and its Q2 FY26 and Q2 FY27 results · checked

01Where the money goes · FY26

Where does ₹100 of Vikram Solar's money go?

Of every ₹100 that came in (revenue plus other income), this is where it went.

Vikram Solar · FY26

Receipt for every ₹100

Where ₹100 of Vikram Solar's money went in FY26
Materials and services₹68.6
Employees₹3.3
Other expenses₹8.0
Depreciation and amortisation₹3.3
Interest & tax₹6.9
One-off Labour Codes charge₹0.1
Kept as profit₹9.7
Total₹100

Each line = amount ÷ total money in × 100. Lines may not add to exactly ₹100 because of rounding.

How this is worked out

Cityfort calculation from the FY26 annual report's consolidated profit and loss statement: each line ÷ money in (revenue plus other income, ₹4,861 crore) × 100. Materials = materials and services consumed (₹3,403 crore) minus the ₹68.6 crore rise in stock of finished goods and work in progress.

Save this receipt as an image

Embed this receipt or the key numbers

Paste this code into a blog or website to show the card you choose, with a link back to this page.

Each week: the next company due to report results, explained in 5 points.

We'll email you once a week with what changed on Cityfort. Facts only, no tips. Unsubscribe any time.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

02The business in one line

What does Vikram Solar do?

Power developers, contractors and distributors pay Vikram Solar for solar panels; in FY26 ₹68.6 of every ₹100 that came in went on materials and services, and ₹9.7 was left as profit.

  • Sales of goods, mainly solar modules, brought in ₹4,723 crore of FY26 revenue of ₹4,802 crore; services brought in ₹80 crore.
  • Almost all FY26 revenue came from India (₹0.3 crore from overseas), against 61.6% of module sales from exports in FY24.

03Who pays it

Who pays Vikram Solar?

  • Public-sector and government undertakings

    21.2%

    of revenue

    Government-owned companies and undertakings that buy modules. Their share of revenue fell from 43.77% in FY25 to 21.15% in FY26, the annual report says.

  • Private power producers, contractors, businesses and distributors

    78.9%

    of revenue

    The rest of FY26 revenue. On 31 Mar 2026 the order book was 69% independent power producers, 13% businesses (C&I), 11% EPC contractors and 7% government; distribution was 16.5% of Q1 FY27 revenue.

  • Public-sector and government undertakings21.2%
  • Private power producers, contractors, businesses and distributors78.9%

Customer concentration

Top 5 and top 10 shares are for FY26, rounded, from the Q4 FY26 investor presentation. The prospectus gave 77.50% (top 5) and 88.72% (top 10) for FY25; the same presentation shows FY25 as 80% and 86%. The 78.85% share is a Cityfort calculation: 100% minus the 21.15% from public-sector and government undertakings.

Top 5 customers
47%
Top 10 customers
65%

04How it makes money

How does Vikram Solar make money?

Vikram Solar earns the gap between what a module sells for and what its cells and materials cost

Materials took ₹68.6 of every ₹100 that came in during FY26, so small moves in module prices or cell costs swing profit. Bigger plants spread fixed costs over more megawatts. The company's gross margin, its own measure, fell from 31% in Q1 FY26 to 19% in Q1 FY27.

EBITDA per ₹100 of revenue (Cityfort calculation)

15.4%19.0%

FY24 to FY26

  1. Buy solar cells, glass, frames and other materials.
  2. Assemble them into modules on high-capacity lines.
  3. Sell by the watt to power producers, contractors and distributors.
  4. More megawatts through the same plants spread fixed costs further.
  5. The company says integrated makers can reduce the cost and supply exposure of bought-in parts (FY26 annual report).

↺ Step 5 feeds back into step 1.

05The numbers · Consolidated · ₹ crore

How has Vikram Solar done?

Revenue

₹4,802 crFY26

Revenue rose every year from FY22 to ₹4,802 crore in FY26, up 40.3%, and Q1 FY27 revenue was ₹1,563 crore, up 37.9% from ₹1,134 crore; the four FY25 quarters are pre-listing comparatives that, the results filings say, were not audited or reviewed by the auditor.

₹ crore

See the numbers
Revenue (₹ crore)
PeriodRevenue (₹ cr)
FY22₹1,730
FY23₹2,073
FY24₹2,511
FY25₹3,423
FY26₹4,802
Q1 FY25₹631
Q2 FY25₹573
Q3 FY25₹1,026
Q4 FY25₹1,194
Q1 FY26₹1,134
Q2 FY26₹1,110
Q3 FY26₹1,106
Q4 FY26₹1,453
Q1 FY27₹1,563
Q2 FY27₹1,077

Net profit

₹470 crFY26

Net profit went from a ₹62.9 crore loss in FY22 to ₹470 crore in FY26, then fell 85.2% in Q1 FY27 to ₹19.8 crore from ₹133 crore a year earlier.

₹ crore

See the numbers
Net profit (₹ crore)
PeriodNet profit (₹ cr)EPS (₹)
FY22−₹62.9−₹2.43
FY23₹14.5₹0.56
FY24₹79.7₹3.08
FY25₹140₹4.61
FY26₹470₹13.68
Q1 FY25₹22.8₹0.75
Q2 FY25₹7.4₹0.25
Q3 FY25₹19₹0.70
Q4 FY25₹90.6₹2.86
Q1 FY26₹133₹4.21
Q2 FY26₹128₹3.83
Q3 FY26₹98.2₹2.71
Q4 FY26₹110₹3.05
Q1 FY27₹19.8₹0.55
Q2 FY27₹5.9₹0.16

Net profit for every ₹100 of revenue

₹9.8FY26

EBITDA margin (Cityfort calculation, after one-off charges) rose from 3.4% in FY22 to 19.0% in FY26, or 19.1% before a ₹5.6 crore Labour Codes charge, which matches the company's own ₹917 crore, and was 8.1% in Q1 FY27; in FY23, 53.2% of revenue still came from solar-project work, against under 3% from FY24.

Net margin: ₹ of net profit per ₹100 of revenue

See the numbers
Net profit for every ₹100 of revenue (Net margin: ₹ of net profit per ₹100 of revenue)
YearNet marginEBITDA margin
FY22−3.6%3.4%
FY230.7%9.0%
FY243.2%15.4%
FY254.1%14.4%
FY269.8%19.0%

Free cash flow

−₹92.5 crFY26

Cash from operations was positive every year and ₹630 crore in FY26, when ₹722 crore of capex left free cash flow at −₹92.5 crore; the ₹1,431 crore (net) raised from new shares that year, mostly in the IPO, is not part of it.

₹ crore · cash from operations minus spending on plants and equipment

See the numbers
Free cash flow (₹ crore · cash from operations minus spending on plants and equipment)
YearCash from operationsCapital spendingFree cash flow
FY22₹201₹141₹60
FY23₹195₹106₹90
FY24₹152₹72₹80
FY25₹281₹133₹148
FY26₹630₹722−₹92.5
See all yearly numbers
Vikram Solar annual financials, FY22–FY26, ₹ crore
YearRevenueEBITDANet profitEPS (₹)Operating cashCapexFree cash
FY22₹1,730₹58.7−₹62.9−₹2.43₹201₹141₹60
FY23 (restated)₹2,073₹186₹14.5₹0.56₹195₹106₹90
FY24 (restated)₹2,511₹387₹79.7₹3.08₹152₹72₹80
FY25 (restated)₹3,423₹492₹140₹4.61₹281₹133₹148
FY26₹4,802₹911₹470₹13.68₹630₹722−₹92.5

EBITDA = profit before interest, tax and wear-and-tear of assets. Financial year runs April to March (March year end). Net profit is the share belonging to the company's owners.

06Who runs it

Who runs Vikram Solar, and did they deliver?

  • Gyanesh Chaudhary

    Chairman and Managing Director (promoter)

    Held 2.84% of the shares directly on 30 Sep 2026; the other promoters are Vikram Capital Management (30.85%) and the Gyanesh Chaudhary Family Trust (20.17%). On 7 May 2026 the board re-appointed him for 3 years from 28 Sep 2026, subject to shareholders' approval.

  • Sameer Nagpal

    Whole-time Director and Chief Executive Officer · since 2026

    Appointed CEO from 20 Mar 2026, and whole-time director and CEO from 7 May 2026.

  • Krishna Kumar Maskara

    Whole-time Director and Chief Operating Officer

    Re-designated COO on 20 Mar 2026; he had been interim CEO.

  • Ranjan Kumar Jindal

    Chief Financial Officer

What they said, and what happened

2 delivered · 1 missed · 4 too early to tell

  1. Said on 17 Oct 2025

    Management said on the Q2 FY26 call that it expected to commission the 5 GW Vallam module plant during that quarter (Oct–Dec 2025).

    What happened

    On 20 Jan 2026 the company said Vallam was commissioned and stabilised, taking module capacity to 9.5 GW.

    Delivered
  2. Said on 17 Oct 2025

    Management said on the Q2 FY26 call that the 6 GW Gangaikondan module plant was "planned to commission in Q4 FY '26".

    What happened

    On 20 Jan 2026 the date moved to Q1 FY27. The first module rolled out on 29 Jun 2026.

    Missed
  3. Said on 20 Jan 2026

    Management said on the Q3 FY26 call that Gangaikondan's module plant was on track for commissioning in Q1 FY27.

    What happened

    The first module from Gangaikondan rolled out on 29 Jun 2026, taking module capacity to 15.5 GW.

    Delivered
  4. Said on 20 Jan 2026

    Management said on the Q3 FY26 call that the cell plant was on track for a phased commissioning, with the first cell out in December 2026.

    What happened

    On 7 Aug 2026 management said the first cell "remains targeted for Q4 FY27" (Jan–Mar 2027). Press releases on 23 Oct and 14 Nov 2026 said the plant was on schedule for its first cell in December 2026.

    Too early to tell
  5. Said on 8 May 2026

    Management said on the Q4 FY26 call that it planned FY27 EBITDA of ₹1,500 to 1,600 crore on about 7.5 to 8 GW of deliveries.

    What happened

    EBITDA was ₹126 crore in Q1 FY27 and ₹101 crore in Q2 FY27: ₹227 crore for H1 FY27. On 7 Aug 2026 management said it would revisit the outlook at the H1 results; the Q2 FY27 press release and investor presentation do not mention it.

    Too early to tell
  6. Said on 15 Nov 2026

    The company said in its Q2 FY27 investor presentation that the 9 GW cell plant will start commercial production in Mar 2027, after the first cell in Dec 2026.

    What happened

    Not yet due.

    Too early to tell
  7. Said on 14 Nov 2026

    The company said in its Q2 FY27 press release that VSL PowerHive's 7.5 GWh battery storage plant at Oragadam will start commercial operations from Apr 2027.

    What happened

    Not yet due.

    Too early to tell

07What could go wrong

What could go wrong for Vikram Solar?

  • Pricing

    Profit fell sharply in Q1 FY27

    Q1 FY27 net profit was ₹19.8 crore, against ₹133 crore a year earlier, and Q2 FY27 net profit ₹5.9 crore, against ₹128 crore. EBITDA margin was 8.1% in Q1 and 9.4% in Q2 FY27, against 21.4% and 21.2% a year earlier (Cityfort calculation). Management cited ALMM List-II uncertainty, Gulf-conflict input and freight costs, and new industry capacity for Q1. For Q2, the company's presentation cited the monsoon, deferred execution and price competition in non-DCR modules.

    Watch EBITDA margin and sales volume in the Q3 FY27 results (Oct–Dec 2026).

  • Regulation

    Dependence on Indian solar policy

    Exports were 61.6% of FY24 module sales (61.1% to the US) and overseas revenue was ₹0.3 crore in FY26, so sales now depend on Indian demand. Rules such as ALMM, which decide which modules and cells government and subsidy-linked projects may use, shape that demand; management said the cell mandate was deferred to December 2026. In Q2 FY27 the company removed about 1 GW of export orders from its order book, citing US Section 232 minimum import price rules.

    Watch ALMM List-II for cells from December 2026, and DCR module volumes.

  • Execution

    Large plant spending ahead

    FY26 capex of ₹722 crore left free cash flow at −₹92.5 crore. In H1 FY27 capex was ₹981.6 crore and cash from operations −₹190.4 crore, so free cash flow was −₹1,171.9 crore (Cityfort calculation). Borrowings rose from ₹100 crore on 31 Mar 2026 to ₹632 crore on 30 Sep 2026. Management put the 12 GW cell capex at ₹5,400 crore (8 May 2026).

    Watch First cells from Gangaikondan, which the company targets for December 2026, and borrowings in the Q3 FY27 results.

  • Governance

    Promoter shares pledged

    On 30 Sep 2026, 9.24% of the promoter group's shares (5.82% of the company) were pledged, down from 48.20% at 31 Dec 2025. Before the IPO, pledged shares secured the company's working-capital facilities and VSL Ventures' debt securities.

    Watch Pledged share in each quarter's shareholding pattern.

  • Legal

    Receivables tied up in disputes

    ₹148.52 crore of safeguard duty paid until 2021 is carried as a receivable pending the Orissa High Court and Supreme Court, and ₹52.81 crore is withheld by EPC customers. The auditor drew attention to both in FY26, and again in its Q2 FY27 limited review report, which puts the withheld amount at ₹52.79 crore. Together they equal 42.8% of FY26 net profit (Cityfort calculation).

    Watch Court rulings on safeguard duty and outcomes of the EPC arbitrations.

  • Legal

    Claims from old project work

    An insolvency petition by Isitva Steels, alleging unpaid dues for civil works sub-contracted in 2018, was admitted on 12 Jun 2026; the NCLAT stayed the order on 24 Jun 2026 and directed a ₹0.92 crore deposit, which the company said it made for the full and final settlement of the claim, and set the order aside on 29 Jun 2026. The prospectus listed 6 material civil cases against the company as of 21 Aug 2025.

    Watch New exchange disclosures on litigation from the EPC business.

  • Concentration

    A few large customers

    The top five customers were 77.50% of FY25 revenue (prospectus) and about 47% in FY26 (investor presentation). Public-sector and government undertakings were 21.15% of FY26 revenue.

    Watch Top-customer shares and distribution's share of revenue (16.5% in Q1 FY27).

08Supporters and critics

What do supporters and critics point to?

Facts each side points to. We don't say which side is right.

What supporters point to

  • FY26 revenue rose 40.3% to ₹4,802 crore and net profit rose to ₹470 crore from ₹140 crore.
  • On 31 Mar 2026 cash and bank balances of ₹1,257 crore were more than borrowings of ₹100 crore.
  • Module capacity rose to 15.5 GW after Gangaikondan started on 29 Jun 2026, and the order book was about 7.9 GW on 30 Jun 2026.
  • India Ratings upgraded the company to IND A+ on 19 Dec 2025 and affirmed it on 12 Aug 2026.
  • The pledged share of promoter holdings fell from 48.20% at 31 Dec 2025 to 9.24% at 30 Sep 2026.

What critics point to

  • Q1 FY27 net profit was ₹19.8 crore, against ₹133 crore a year earlier, and EBITDA margin fell to 8.1% from 21.4%.
  • FY26 free cash flow was −₹92.5 crore after ₹722 crore of capex, and much bigger cell-plant spending is planned.
  • Overseas revenue was ₹0.3 crore in FY26, after exports were 61.6% of module sales in FY24.
  • ₹201.3 crore of receivables, safeguard duty and amounts withheld by customers, depend on court and arbitration outcomes.
  • The Gangaikondan module plant started a quarter later than first planned, and the company still buys all its cells.

09What to watch next

What should you watch next at Vikram Solar?

Next event

Q3 FY27 results (date not announced; Q3 FY26 results came on 20 Jan 2026)

Date not announced yet.

  • The FY27 EBITDA outlook

    Management planned FY27 EBITDA of ₹1,500 to 1,600 crore (8 May 2026) and said it would revisit this at the H1 results. H1 FY27 EBITDA was ₹227 crore; the Q2 press release and presentation do not mention the outlook.

  • First cells from Gangaikondan

    The company said on 14 Nov 2026 the 9 GW cell plant is on schedule for its first cell in December 2026. Its 15 Nov presentation puts commercial production in Mar 2027.

  • Margin and borrowings

    EBITDA margin was 9.4% in Q2 FY27, against 21.2% a year earlier (Cityfort calculation). Borrowings rose to ₹632 crore on 30 Sep 2026 from ₹100 crore on 31 Mar 2026.

10Key facts

Key facts about Vikram Solar

What does Vikram Solar do?
Vikram Solar Ltd, based in Kolkata, makes solar panels (modules) at plants in Falta, West Bengal, and in Tamil Nadu. Its module capacity was 9.5 GW on 31 Mar 2026 and 15.5 GW after its Gangaikondan plant made its first module on 29 Jun 2026, and it is building a 9 GW solar cell plant at the same site.
How does Vikram Solar make money?
Vikram Solar earns almost all its money selling solar modules: sales of goods were ₹4,723 crore of its ₹4,802 crore FY26 revenue, and services ₹80 crore. It sold 3,342 MW of modules in FY26, up from 1,900 MW in FY25.
Who are Vikram Solar's customers?
Vikram Solar sells to power producers, EPC contractors (firms that build solar plants), businesses and distributors, almost all in India. Public-sector and government undertakings were 21.15% of its FY26 revenue, against 43.77% in FY25, and its top five customers were about 47% of FY26 revenue, its investor presentation says.
How big is Vikram Solar?
Vikram Solar's FY26 revenue was ₹4,802 crore, up 40.3% from ₹3,423 crore in FY25, and its net profit was ₹470 crore, against ₹140 crore. In H1 FY27 (Apr–Sep 2026) revenue was ₹2,641 crore, up 17.7%, and net profit ₹25.7 crore, against ₹262 crore a year earlier.
Who owns Vikram Solar?
On 30 Sep 2026 Vikram Solar's promoter group held 63.01% of its shares, led by Vikram Capital Management (30.85%) and the Gyanesh Chaudhary Family Trust (20.17%). Domestic institutions held 3.66%, foreign institutions 3.10% and other shareholders 30.23%; 9.24% of the promoter group's shares were pledged.
When did Vikram Solar list on the stock exchanges?
Vikram Solar listed on NSE and BSE on 26 Aug 2025 after an IPO at ₹332 a share. The IPO raised ₹1,500 crore of new money for the company, and selling shareholders received ₹579.4 crore for the shares they sold.
Does Vikram Solar have debt?
On 30 Sep 2026 Vikram Solar had borrowings of ₹632 crore, all due within a year, up from ₹100 crore on 31 Mar 2026. Its cash and bank balances were ₹504 crore, down from ₹1,257 crore, and lease liabilities ₹548 crore. ₹176.9 crore of its IPO money was still unused on 30 Sep 2026.
What credit rating does Vikram Solar have?
India Ratings rates Vikram Solar's bank facilities IND A+ with a Stable outlook (long term) and IND A1+ (short term). It upgraded the company to these ratings on 19 Dec 2025 and affirmed them on 12 Aug 2026, when the rated limits rose from ₹2,700 crore to ₹4,000 crore.

Terms on this page

Each explains the term in plain English, with the same number from other companies on Cityfort.

Go deeper

More detail from the same filings. Open any section.

11What it sells

11What it sells

What does Vikram Solar sell?

A solar module is the panel you see on rooftops and in solar farms: many solar cells wired together behind glass in a frame. Vikram Solar buys cells and other materials, assembles modules and sells them by capacity, counted in watts. It does not yet make its own cells.
  • Solar modules

    Panels sold to power producers, EPC contractors, businesses and distributors. Sales of goods were ₹4,723 crore in FY26, and the company sold 3,342 MW of modules, up from 1,900 MW in FY25.

  • DCR modules

    Modules made with Indian-made cells, which the Domestic Content Requirement (DCR) part of the market asks for. Vikram Solar sold 76 MW of them in Q1 FY27, more than in all of FY26, using cells it buys from other makers.

  • Solar project work (EPC and O&M)

    Building solar plants for clients (EPC) and running them (operation and maintenance, O&M). This was 53.2% of FY23 revenue and 1.8% in FY25; FY26 revenue from services was ₹80 crore.

What it does

  • Does: Makes solar modules at Falta (West Bengal) and at Oragadam, Vallam and Gangaikondan (Tamil Nadu).
  • Does: Sells through large accounts and a distribution network of 119 distributors and 757 dealers (Q1 FY27).
  • Does: Buys the solar cells inside its modules, for example under a 1 GW domestic cell supply agreement with Avaada Electro (Sep 2026).

What it does not do

  • Does not: Does not make its own solar cells yet: the company said on 23 Oct 2026 its 9 GW cell plant is on schedule for first cells in December 2026.
  • Does not: Does not sell much abroad any more: overseas revenue was ₹0.3 crore in FY26, after exports were 61.6% of module sales in FY24.
12How the money flows

12How the money flows · FY26

How does money flow through Vikram Solar?

Money in

  • Revenue from operations₹4,802 cr
  • Other income₹58.5 cr

The company

Vikram Solar

₹4,861 cr came in

Money out

  • Materials and services (after the change in stock)₹3,334 cr
  • Employee costs₹162 cr
  • Other expenses₹389 cr
  • Depreciation and amortisation₹162 cr
  • Interest (finance costs)₹161 cr
  • One-off charge for the new Labour Codes₹5.6 cr
  • Tax₹177 cr
  • Net profit₹470 cr
  1. Customers paid ₹4,802 crore in FY26, almost all for solar modules.
  2. Another ₹58.5 crore came in as other income, not from selling modules.
  3. Materials and services, mainly solar cells and other module parts, cost ₹3,334 crore, the biggest cost by far.
  4. Other expenses took ₹389 crore, staff ₹162 crore and depreciation ₹162 crore.
  5. After ₹161 crore of interest, a ₹5.6 crore one-off charge and ₹177 crore of tax, ₹470 crore was left as profit.
13What it needs to run

13What it needs to run

What does Vikram Solar need to run?

  • Module plants

    9.5 GW of module capacity at Falta, Oragadam and Vallam on 31 Mar 2026, after the 5 GW Vallam plant started in Q3 FY26. The 6 GW Gangaikondan plant made its first module on 29 Jun 2026, taking capacity to 15.5 GW.

  • Solar cells and other materials

    Materials and services took ₹68.6 of every ₹100 that came in during FY26. Vikram Solar buys its cells, including under agreements with Evervolt (130 MW of DCR cells, Jul 2026) and Avaada Electro (1 GW, Sep 2026).

  • Money for new plants

    FY26 capex was ₹722 crore and capital commitments were ₹1,205 crore on 31 Mar 2026. Management said on 8 May 2026 the 12 GW cell capex would be ₹5,400 crore.

  • People

    2,946 employees on 31 Mar 2026, up 42% in a year.

14Competitors and what protects it

14Competitors and what protects it

Who does Vikram Solar compete with?

An industry report commissioned by the company from CRISIL, quoted in the prospectus, lists Vikram Solar eighth among Indian module makers by installed capacity in May 2025, at 4,500 MW against Waaree Energies' 15,000 MW. The FY26 annual report says capacity enlisted under ALMM, the government's approved list for government and subsidy-linked projects, reached about 173 GW in Mar 2026.
  • Waaree Energies

    NSE: WAAREEENER

    Named in the prospectus as a key competitor (from the CRISIL report the company commissioned) and as a listed peer. That report put its module capacity at 15,000 MW in May 2025.

  • Premier Energies

    A listed peer in the prospectus's comparison table; the CRISIL report the company commissioned put its module capacity at 5,100 MW in May 2025.

  • Mundra Solar PV (Adani Solar)

    Named in the prospectus as a key competitor, from the CRISIL report the company commissioned.

  • Goldi Solar

    Unlisted. Named in the prospectus as a key competitor; the CRISIL report the company commissioned put its module capacity at 10,700 MW in May 2025.

  • Websol Energy System

    A listed peer in the prospectus's comparison table of accounting ratios.

What protects the business

Each strength is scored 1 (weak) to 5 (strong) for the business, with the reason. It is not a rating of the share.

  • Scale3 of 5

    Module capacity rose from 4.5 GW in mid-2025 to 15.5 GW after Gangaikondan started on 29 Jun 2026; the commissioned CRISIL report listed seven Indian makers with more capacity in May 2025.

  • Track record with large buyers3 of 5

    The company says it has sold 10.46 GW of modules since it started, and its order book was about 7.9 GW on 30 Jun 2026.

  • Own cell supply1 of 5

    Vikram Solar buys its cells today; the company says its own cell plant will produce first cells in December 2026 (company, 23 Oct 2026).

Weak spot

Passing on cost increases

Management said on 7 Aug 2026 that its supply agreements pass through cell costs only, not other materials, and that intense competition from new capacity did not allow a full pass-through in Q1 FY27.

15Where growth could come from

15Where growth could come from

Where could Vikram Solar's growth come from?

Management said on the Q4 FY26 call (8 May 2026) that it planned to deliver about 7.5 to 8 GW in FY27 and EBITDA of ₹1,500 to 1,600 crore. On the Q1 FY27 call (7 Aug 2026), after Q1 EBITDA of ₹126 crore, it said: "we will revisit that outlook at our H1 results". The Q2 FY27 press release (14 Nov 2026) and investor presentation (15 Nov 2026) do not mention the outlook.
Management statement, 7 Aug 2026. Reported as a statement, not our forecast.
  • Gangaikondan module plant

    Working

    Module capacity 9.5 GW (31 Mar 2026) to 15.5 GW (Jun 2026)

    The 6 GW plant made its first module on 29 Jun 2026, within Q1 FY27, the quarter given on the Jan 2026 call; in Oct 2025 management had planned it for Q4 FY26.

    Status: Working, on track against what the company said.

  • Own solar cells

    Early

    First cell planned for Dec 2026, commercial production for Mar 2027 (company, 15 Nov 2026)

    A 9 GW cell plant is being built at Gangaikondan. The Q1 FY27 call on 7 Aug 2026 said the first cell "remains targeted for Q4 FY27"; press releases on 23 Oct and 14 Nov 2026 say December 2026. Until then, the 15 Nov 2026 presentation says, modules are built on bought-in cells.

    Status: Early, too early to judge.

  • DCR modules and distribution

    New

    DCR modules 22% and distribution 44% of Q2 FY27 sales volume, against 7.5% and 14% in Q1 FY27

    The company sold 130 MW of DCR modules in Q2 FY27, against 76 MW in Q1 FY27, its presentation says. It had 133 distributors and more than 750 dealers on 14 Nov 2026. Cells for DCR modules come from bought-in domestic supply, such as the Avaada Electro agreement.

    Status: New, recently announced.

  • Order book

    Mixed

    About 7.9 GW (30 Jun 2026) to 8.2 GW (30 Sep 2026), after about 1 GW of export orders was removed

    The company added about 1.7 GW of new orders in Q2 FY27, against 0.8 GW in Q1 FY27. It removed about 1 GW of export orders, citing US Section 232 minimum import price rules. A 0.6 GW US order had been shelved earlier.

    Status: Mixed, partly on track.

  • Wafers and battery storage

    Early

    9 GW ingot-wafer plant by FY29; 7.5 GWh battery plant from Apr 2027 (company, 14 Nov 2026)

    The company plans 9 GW of ingot and wafer capacity at Gangaikondan by FY29. Its battery subsidiary, VSL PowerHive (CEO Arun Mittal), is building a 7.5 GWh a year battery storage assembly plant at Oragadam, near Chennai, and expects operations from Apr 2027.

    Status: Early, too early to judge.

Status compares progress with what the company itself said it would do: Working = on track against what the company said; Mixed = partly on track; Behind = behind the company's own plan; New = recently announced; Early = too early to judge.

16Financial strength and debt

16Financial strength · 31 Mar 2026

How much debt does Vikram Solar have?

On 31 Mar 2026 Vikram Solar's cash and bank balances of ₹1,257 crore were ₹1,157 crore more than its borrowings of ₹100 crore, after it raised ₹1,431 crore (net) from new shares in FY26, mostly in the IPO.
  • Total debt₹100 cr
  • Cash and investments₹1,257 cr
  • Net cash (cash minus debt)₹1,157 cr
  • Net worth (shareholders' money)₹3,168 cr
Debt to equity
0.03×
₹ of debt for every ₹1 of shareholders' money
Interest cover
5×
how many times operating profit covers interest
Contingent liabilities
₹61.6 cr
possible future payments, e.g. disputed claims
  • Net cash is a Cityfort calculation from the FY26 consolidated balance sheet: cash (₹35.8 crore) plus other bank balances (₹1,221 crore) minus borrowings (₹100 crore).
  • Not counted: lease liabilities of ₹545 crore (₹41.3 crore a year earlier). Counting them, net cash was ₹612 crore (Cityfort calculation).
  • ₹961.8 crore of the ₹1,414.5 crore of net IPO proceeds was still unused on 31 Mar 2026, the FY26 results filing says.
  • The company's own measure, "working capital net debt", was ₹64 crore on 31 Mar 2026; it is defined differently from the net cash above.
  • In FY26 inventories rose from ₹429 crore to ₹823 crore and trade payables from ₹828 crore to ₹1,564 crore; trade receivables were ₹1,214 crore.
  • Interest coverage is a Cityfort calculation: (profit before tax ₹647 crore + finance costs ₹161 crore) ÷ finance costs, for FY26. Capital commitments were ₹1,205 crore on 31 Mar 2026.
17Who owns it

17Who owns it · Q2 FY27 (30 Sep 2026)

Who owns Vikram Solar?

  • Promoters (founders or parent company)63.0%, of which pledged 5.8%
  • Foreign institutions (FII)3.1%
  • Indian institutions (DII)3.7%
  • Public and others30.2%
  • Pledged: 9.2% of promoter shares (5.8% of all shares)5.8%

Promoter shares pledged

9.2% of promoter shares

A pledge means promoters gave shares as security for a loan. If the loan isn't repaid, the lender can sell them.

How ownership changed
Vikram Solar shareholding by quarter, %
QuarterPromotersFIIDIIPublicPledged*
Q2 FY2663.1%2.1%6.2%28.6%48.2%
Q3 FY2663.0%1.8%4.7%30.5%48.2%
Q4 FY2663.0%2.9%4.8%29.3%6.8%
Q1 FY2763.0%3.4%4.0%29.6%9.2%
Q2 FY2763.0%3.1%3.7%30.2%9.2%

* Pledged = share of the promoters' own holding reported as pledged. In older filings this can include shares “otherwise encumbered”; the governance flags say when.

18What it does with profit

18What it does with profit

What does Vikram Solar do with its profit?

The board recommended no dividend for FY26. Of the ₹1,414.5 crore of net IPO proceeds, meant mainly for new cell and module capacity through the subsidiary VSL Green Power, ₹452.7 crore was used by 31 Mar 2026. In FY25, before the IPO, the company raised ₹653 crore (net) by issuing new shares.
  • Money raised · 26 Aug 2025

    IPO at ₹332 a share (listing date): 45,180,722 new shares raised ₹1,500 crore for the company. Selling shareholders also sold 17,450,882 existing shares for ₹579.4 crore; that money went to them, not to Vikram Solar.

    ₹1,500 cr

19Governance signals

19Governance signals

What do Vikram Solar's governance filings show?

Auditor
G A R V & Associates
Auditor changes
None in the period covered
Audit qualifications
None reported
Related-party dealings
Before the IPO, promoter-group shares were pledged as security for the company's own working-capital facilities and for debt securities of VSL Ventures, a promoter-group company. Gyanesh Chaudhary has given personal guarantees and Vikram Capital Management corporate guarantees for some of the company's loans, the prospectus says.
Credit rating
India Ratings IND A+ / IND A1+ (outlook Stable), 12 Aug 2026

A credit rating describes the company's ability to repay debt. It is not a rating of the share.

Flags to know about

  • pledge · 30 Sep 2026

    Promoter shares pledged

    48.20% of the promoter group's shares (30.43% of the company) were pledged on 30 Sep 2025, and 48.20% on 31 Dec 2025. The pledges by the Family Trust and Vikram Capital Management were released by 31 Mar 2026 (6.77%); on 30 Jun and 30 Sep 2026 9.24% was pledged, 5.82% of the company, by VSL Ventures, Nilam Chaudhary and Vikram India.

  • auditor · 31 Mar 2026

    Auditor's emphasis of matter on disputed receivables

    The FY26 audit report draws attention to ₹148.52 crore of safeguard duty paid until 29 Jul 2021 and carried as a receivable while the matter is before the Orissa High Court and the Supreme Court, and to ₹52.81 crore of receivables withheld by EPC customers and referred to dispute resolution, arbitration or court. The opinion is not modified for these matters.

  • other · 29 Jun 2026

    Insolvency petition admitted, stayed and set aside (Jun 2026)

    On 12 Jun 2026 the NCLT Kolkata admitted a Section 9 insolvency petition by operational creditor Isitva Steels, alleging non-payment for civil works sub-contracted in 2018 (alleged claim about ₹9.44 crore, including about ₹4.21 crore of interest), and appointed an interim resolution professional. The company disputed the claim, citing a 2019 settlement. The NCLAT stayed the order on 24 Jun 2026 and directed a ₹0.92 crore deposit, which the company said it made for the full and final settlement of the claim, and set the order aside on 29 Jun 2026.

  • other · 21 Aug 2025

    Pending cases listed in the prospectus

    As of 21 Aug 2025 the prospectus listed cases against the company (3 criminal, 42 tax, 2 statutory or regulatory, 6 material civil) with about ₹343.0 crore involved, and 8 material civil cases and 1 criminal case filed by it, with about ₹437.0 crore involved.

20What the market paid

20What the market paid · price as of 11 Nov 2026

What did the market pay for Vikram Solar on 11 Nov 2026?

Price as of 11 Nov 2026 (shown for education; prices change daily).

Price as of 11 Nov 2026: ₹138.62, the NSE closing price. Cityfort calculation: market value = that price × 362,354,381 shares (30 Sep 2026 shareholding pattern) = ₹5,023 crore. P/E (price ÷ yearly profit per share) is 10.1 on FY26 basic EPS of ₹13.68; P/B (market value ÷ net worth) is 1.6 on the 31 Mar 2026 net worth of ₹3,168 crore. Both are Cityfort calculations from the FY26 annual report and the 11 Nov 2026 price.

Share price
₹138.62
Market value (market cap)
₹5,023 cr
P/E
10.1×
P/B
1.6×

Source: NSE historical price data, VIKRAMSOLR EQ, 1-11 Nov 2026 (close 11 Nov 2026); Shareholding pattern 30 Sep 2026 (XBRL); Annual Report 2025-26 (FY26; audited consolidated, FY25 comparative)

21How it got here

21How it got here

How did Vikram Solar get here?

  1. 2005

    Milestone

    Incorporated

    Incorporated on 2 Dec 2005 as International Leather Clothiers Pvt Ltd; renamed Vikram Solar Pvt Ltd on 3 Sep 2008.

  2. 2024

    Business-model change

    From solar projects to modules

    Solar-project work (EPC and O&M) was 53.2% of FY23 revenue; in FY24 module sales were 97.3%.

  3. 2025

    Business-model change

    From US exports to India

    Exports were 61.6% of FY24 module sales, almost all to the US; in FY25 they were 1.0%, and domestic module sales rose from ₹898 crore to ₹3,329 crore.

  4. 2025

    Milestone

    Listed on NSE and BSE

    Listed on 26 Aug 2025 after an IPO at ₹332 a share that raised ₹1,500 crore of new money.

  5. 2025

    Milestone

    Vallam plant doubles capacity

    The 5 GW Vallam module plant was commissioned in Q3 FY26, taking capacity from 4.5 GW to 9.5 GW.

  6. 2026

    Milestone

    New CEO

    Sameer Nagpal became CEO from 20 Mar 2026.

  7. 2026

    Milestone

    Gangaikondan starts

    The first module from the 6 GW Gangaikondan plant rolled out on 29 Jun 2026, taking capacity to 15.5 GW.

  8. 2026

    Crisis

    Q1 FY27 profit falls

    Q1 FY27 net profit fell 85.2% to ₹19.8 crore while revenue rose 37.9%.

22What changed

22What changed · Q2 FY27

What changed in Q2 FY27?

Updated 16 Nov 2026

  • Revenue was ₹1,077 crore in Q2 FY27 (Jul–Sep 2026), down 2.9% from ₹1,110 crore a year earlier and 31.1% from Q1 FY27. Sales volume fell to 591 MW from 1,006 MW in Q1, the company's presentation says.
  • Net profit was ₹5.9 crore, against ₹128 crore in Q2 FY26. EBITDA was ₹101 crore, a 9.4% margin (Cityfort calculation), against 8.1% in Q1 FY27.
  • In H1 FY27 cash from operations was −₹190.4 crore and capex ₹981.6 crore, so free cash flow was −₹1,171.9 crore (Cityfort calculation).
  • Borrowings rose from ₹100 crore on 31 Mar 2026 to ₹632 crore on 30 Sep 2026, and other bank balances fell from ₹1,221 crore to ₹419 crore. Borrowings exceeded cash and bank balances by ₹128 crore (Cityfort calculation, not counting ₹548 crore of lease liabilities).
  • The order book was 8.2 GW on 30 Sep 2026, against about 7.9 GW on 30 Jun. That is after about 1.7 GW of new orders and the removal of about 1 GW of export orders, which the company linked to US Section 232 rules.
  • The company said on 14 Nov 2026 its cell plant is on schedule for a first cell in December 2026. The Q2 press release and presentation do not mention the FY27 EBITDA outlook of ₹1,500 to 1,600 crore.

23Sources and changes

Where every number on this page comes from

Sources (38 documents)
  1. S1Annual Report 2025-26 (FY26; audited consolidated, FY25 comparative) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 10 Jul 2026
  2. S2Prospectus dated 21 Aug 2025 (IPO; Restated Consolidated Summary Statements FY23-FY25) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 21 Aug 2025
  3. S3Annual Report 2022-23 (FY23; audited consolidated with FY22 comparative; auditor report dated 27 Jun 2023) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 27 Jun 2023
  4. S4Q1 FY27 consolidated results, XBRL (integrated filing, quarter ended 30 Jun 2026) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 6 Aug 2026
  5. S6Q4 FY26 and FY26 audited consolidated results, XBRL (revised filing; numbers same as 7 May 2026 original) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 27 Jul 2026
  6. S7Outcome of board meeting 20 Jan 2026: unaudited results Q3 FY26 and 9M FY26 (with Q3 FY25 and 9M FY25 comparatives) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 20 Jan 2026
  7. S8Q3 FY26 consolidated results, XBRL (revised filing; numbers same as 20 Jan 2026 original) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 21 Jan 2026
  8. S9Outcome of board meeting 16 Oct 2025: unaudited results Q2 FY26 and H1 FY26 (with Q2 FY25 and H1 FY25 comparatives) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 16 Oct 2025
  9. S10Q2 FY26 consolidated results, XBRL · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 16 Oct 2025
  10. S11Investor presentation Q1 FY27 · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 7 Aug 2026
  11. S12Investor presentation Q4 FY26 · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 8 May 2026
  12. S13Q1 FY27 earnings call transcript (call 7 Aug 2026) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 13 Aug 2026
  13. S14Q4 FY26 earnings call transcript (call 8 May 2026) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 13 May 2026
  14. S15Q3 FY26 earnings call transcript (call 20 Jan 2026) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 28 Jan 2026
  15. S16Q2 FY26 earnings call transcript (call 17 Oct 2025) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 27 Oct 2025
  16. S17Shareholding pattern 30 Sep 2025 (XBRL) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 18 Oct 2025
  17. S18Shareholding pattern 31 Dec 2025 (XBRL) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 21 Jan 2026
  18. S19Shareholding pattern 31 Mar 2026 (XBRL) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 16 Apr 2026
  19. S20Shareholding pattern 30 Jun 2026 (XBRL) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 16 Jul 2026
  20. S21Shareholding pattern 30 Sep 2026 (XBRL) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 16 Oct 2026
  21. S23Q1 FY26 consolidated results, XBRL · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 9 Sep 2025
  22. S24Intimation: India Ratings upgrade to IND A+/Stable and IND A1+ on ₹2,700 cr bank facilities · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 19 Dec 2025
  23. S26Intimation: NCLT Kolkata admitted Section 9 IBC petition by Isitva Steels (order 12 Jun 2026) · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 19 Jun 2026
  24. S27Intimation: NCLAT order 24 Jun 2026 staying the NCLT order; ₹0.92 cr deposited · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 25 Jun 2026
  25. S28Intimation: NCLAT order 29 Jun 2026 setting aside the NCLT admission order · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 30 Jun 2026
  26. S29Press release: first module from Gangaikondan, Tamil Nadu plant · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 6 Jul 2026
  27. S30Outcome of board meeting 20 Mar 2026: Sameer Nagpal appointed CEO; K K Maskara re-designated WTD & COO · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 20 Mar 2026
  28. S33NSE historical price data, VIKRAMSOLR EQ, 1-11 Nov 2026 (close 11 Nov 2026) · National Stock Exchange of India · Tier 1: company or exchange filing · 11 Nov 2026
  29. S35Press release: 9 GW cell plant at Gangaikondan on schedule for first cells in Dec 2026 · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 23 Oct 2026
  30. S37Intimation: 130 MW DCR solar cell supply agreement with Evervolt Solar Technology India · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 9 Jul 2026
  31. S38Press release: 1 GW domestic solar cell supply agreement with Avaada Electro · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 15 Sep 2026
  32. S39Outcome of board meeting 7 May 2026: FY26 audited results, unmodified audit opinion, cost auditor appointment · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 7 May 2026
  33. S40Intimation: India Ratings affirmed IND A+/Stable, IND A1+; rated limits raised ₹2,700 cr to ₹4,000 cr · Vikram Solar Ltd (company IR site; filed with NSE/BSE) · Tier 1: company or exchange filing · 12 Aug 2026
  34. S44Outcome of board meeting 9 Sep 2025: unaudited results Q1 FY26 (with Q4 FY25 and Q1 FY25 comparatives, not audited or reviewed) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 9 Sep 2025
  35. S45Outcome of board meeting 14 Nov 2026: unaudited results Q2 FY27 and H1 FY27 (limited review; with Q2 FY26, H1 FY26 and 31 Mar 2026 comparatives) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 14 Nov 2026
  36. S46Q2 FY27 consolidated results, XBRL (integrated filing, quarter ended 30 Sep 2026) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 14 Nov 2026
  37. S47Press release: Q2 and H1 FY27 results (14 Nov 2026) · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 14 Nov 2026
  38. S48Investor presentation Q2 FY27 · Vikram Solar Ltd (filed with NSE) · Tier 1: company or exchange filing · 15 Nov 2026
Changes to this page (v2 · 16 Nov 2026)
  1. v2 · 16 Nov 2026Q2 FY27 results (filed 14 Nov 2026) added: quarterly row, H1 and 30 Sep 2026 debt key facts, growth metrics, risk details, cell-plant and outlook outcomes, two new company plans, what changed, what to watch and summary. FY27 outlook left as stated until the 16 Nov 2026 call transcript is filed. (quarterly update, Q2 FY27)
  2. v1 · 12 Nov 2026First version. (first version)

Numbers come only from tier 1 and tier 2 sources. Read how we research.

Disclaimer

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

Investing in securities involves risk, including loss of capital. Before making any investment decision, do your own research and consider consulting a SEBI-registered investment adviser.

Cityfort, its owners and contributors may or may not hold securities of companies covered. Content is not an offer or solicitation to buy or sell any security.

Read the full disclaimer

Cityfort publishes educational content that explains how listed companies work. Cityfort is not registered with the Securities and Exchange Board of India (SEBI) as an Investment Adviser or Research Analyst and does not provide investment advice, recommendations, ratings, price targets or any opinion on whether to buy, sell or hold any security.

All information is taken from publicly available sources, mainly company filings on BSE and NSE, which are listed on each page with dates. We work to keep it accurate and correct errors publicly, but we do not guarantee that it is complete, accurate or up to date. Any market price or price-based ratio shown is dated, may be out of date by the time you read it, and is included only to explain concepts.

Statements by company management are reported as statements, with their date and source; they are not our forecasts.