Metals & Mining · NSE: JINDALSTEL · BSE: 532286

Jindal Steel: how the business works

Jindal Steel, formerly Jindal Steel & Power, makes steel in Odisha and Chhattisgarh and sells it to builders, dealers and factories; FY26 revenue was ₹53,225 crore.

Follow Jindal Steel

Email me when Jindal Steel's page is updated after results.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

Jindal Steel Limited · New Delhi (registered office: Hisar, Haryana) · Founded 1979

Updated for Q2 FY27 · checked

Revenue, FY26
₹53,225 cr
Profit to shareholders, FY26
₹3,367 cr
Steelmaking capacity, 24 Mar 2026
15.6 million tonnes a year
Promoter holding, 30 Sep 2026
62.69% (10.11% of it pledged)
Incorporated
1979

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

The short version

Jindal Steel in 5 points

  1. 1 · What it sells

    Jindal Steel makes steel at Angul in Odisha and Raigarh in Chhattisgarh, with 15.6 million tonnes a year of capacity, and sold 8.68 million tonnes in FY26.

    More: what it sells

  2. 2 · Who pays it

    By FY26 sales volume, infrastructure took 35%, dealers 32%, building and construction 18%, engineering and packaging 12% and carmakers 3%, and the company does not disclose revenue by customer.

    More: who pays it

  3. 3 · What it keeps from ₹100

    Of every ₹100 that came in during FY26, Jindal Steel spent ₹47.6 on raw materials and goods bought and kept ₹6.3 as profit, after one-off charges of ₹871 crore, mostly an Australian mine write-down.

    More: what it keeps from ₹100

  4. 4 · Where the operating profit comes from

    Jindal Steel reports one segment, steel, so its operating profit is tonnes sold times the margin per tonne: 8.68 million tonnes in FY26 at a company-measured adjusted EBITDA of ₹10,482 a tonne.

    More: where the operating profit comes from

  5. 5 · The one thing to watch

    H1 FY27 production was 4.79 million tonnes, against 4.09 million in H1 FY26, and MD Vidya Ratan Sharma said on 23 Oct 2026 that the aim is about 11 million tonnes for FY27.

    More: the one thing to watch

Sources: From Jindal Steel's FY26 annual report, its Q4 FY26 and Q2 FY27 results presentations and the Q4 FY26 call transcript · checked

01Where the money goes · FY26

Where does ₹100 of Jindal Steel's money go?

Of every ₹100 that came in (revenue plus other income), this is where it went.

Jindal Steel · FY26

Receipt for every ₹100

Where ₹100 of Jindal Steel's money went in FY26
Raw materials and goods bought₹47.6
Other running costs₹31.4
Employee costs₹2.3
Depreciation₹5.9
Interest₹2.8
Tax, one-offs and other items₹3.6
Kept as profit for Jindal Steel shareholders₹6.3
Total₹100

Each line = amount ÷ total money in × 100. Lines may not add to exactly ₹100 because of rounding.

How this is worked out

Of every ₹100 that came in during FY26: revenue (₹53,225 crore) plus other income (₹328 crore); Cityfort calculation from the FY26 results. Raw materials include goods bought for resale and the change in inventories. The tax line also holds one-off charges of ₹871 crore, a ₹15 crore share of associates' losses and ₹7 crore of minority partners' losses added back.

Save this receipt as an image

Embed this receipt or the key numbers

Paste this code into a blog or website to show the card you choose, with a link back to this page.

Each week: the next company due to report results, explained in 5 points.

We'll email you once a week with what changed on Cityfort. Facts only, no tips. Unsubscribe any time.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

02The business in one line

What does Jindal Steel do?

Builders, dealers and factories pay Jindal Steel for steel; raw materials take ₹47.6 of every ₹100, other running costs ₹31.4, and ₹6.3 is left as profit.

  • Steel production rose from 8.12 million tonnes in FY25 to 9.25 million in FY26; the Angul plant in Odisha reached 12 million tonnes a year of capacity on 24 Mar 2026.
  • Promoters held 62.69% of the shares on 30 Sep 2026 and had pledged 10.11% of their holding; borrowings were ₹21,791 crore.

03Who pays it

Who pays Jindal Steel?

Jindal Steel does not disclose how much each type of customer pays.

  • Infrastructure projects

    Builders of roads, railways, bridges and other public works: 35% of FY26 sales volume.

  • Dealers and distributors

    Steel sold through dealers and distributors ("distribution" in the annual report): 32% of FY26 sales volume.

  • Building and construction firms

    Developers and construction companies: 18% of FY26 sales volume.

  • Engineering and packaging firms

    Factories that make machines, parts and packaging: 12% of FY26 sales volume.

  • Carmakers and suppliers

    The automotive sector took 3% of FY26 sales volume.

How spread out the customers are

Jindal Steel does not disclose revenue by customer, and the documents collected name no customer giving 10% or more of revenue. The shares above are of FY26 sales volume by sector, from the FY26 annual report. Exports were 6.8% of FY26 sales volume.

04How it makes money

How does Jindal Steel make money?

Profit is the gap between steel prices and the cost of ore, coal and plants, times the tonnes sold.

Jindal Steel sold 8.68 million tonnes in FY26. The company's adjusted EBITDA per tonne (its own measure) fell from ₹11,712 in FY25 to ₹10,482 in FY26. It mines some of its iron ore but imports coking coal, ICRA says.

Company adjusted EBITDA per tonne of steel sold

₹11,712₹10,482

FY25 to FY26

  1. Jindal Steel mines iron ore and thermal coal in India and imports coking coal.
  2. Its furnaces at Angul and Raigarh turn them into steel: 9.25 million tonnes in FY26.
  3. It sells coils, plates, rebars and rails to builders, dealers and factories.
  4. Profit per tonne is the steel price minus ore, coal and running costs.
  5. Company adjusted EBITDA per tonne ranged from ₹6,981 to ₹15,680 across the eight quarters to Q2 FY27.

↺ Step 5 feeds back into step 1.

05The numbers · Consolidated · ₹ crore

How has Jindal Steel done?

Revenue

₹53,225 crFY26

Revenue stayed between ₹49,765 crore and ₹53,225 crore from FY22 to FY26, and FY22 is only partly comparable because it excludes Jindal Power, which was being sold; Q2 FY27's ₹16,679 crore is the highest of the eight quarters shown.

₹ crore

See the numbers
Revenue (₹ crore)
PeriodRevenue (₹ cr)
FY22₹51,086
FY23₹52,711
FY24₹50,027
FY25₹49,765
FY26₹53,225
Q3 FY25₹11,751
Q4 FY25₹13,183
Q1 FY26₹12,294
Q2 FY26₹11,686
Q3 FY26₹13,027
Q4 FY26₹16,218
Q1 FY27₹15,482
Q2 FY27₹16,679

Net profit

₹3,367 crFY26

Profit for shareholders was ₹3,367 crore in FY26, against ₹5,938 crore in FY24, a year with only ₹298 crore of tax; FY25 and FY26 include Australian mine write-downs of ₹1,092 crore and ₹834 crore, and FY22 includes a ₹1,483 crore loss on the Jindal Power business.

₹ crore

See the numbers
Net profit (₹ crore)
PeriodNet profit (₹ cr)EPS (₹)
FY22₹5,753₹56.40
FY23₹3,174₹39.07
FY24₹5,938₹59.15
FY25₹2,812₹27.83
FY26₹3,367₹33.12
Q3 FY25₹950₹9.39
Q4 FY25−₹339−₹3.35
Q1 FY26₹1,494₹14.73
Q2 FY26₹638₹6.28
Q3 FY26₹190₹1.87
Q4 FY26₹1,045₹10.27
Q1 FY27₹845₹8.30
Q2 FY27₹774₹7.61

Net profit for every ₹100 of revenue

₹6.3FY26

EBITDA margin (Cityfort calculation after one-off items) was 29.6% in FY22 and 16.5% in FY26; the company's own FY26 EBITDA of ₹9,660 crore leaves out ₹871 crore of one-off charges.

Net margin: ₹ of net profit per ₹100 of revenue

See the numbers
Net profit for every ₹100 of revenue (Net margin: ₹ of net profit per ₹100 of revenue)
YearNet marginEBITDA margin
FY2211.3%29.6%
FY236.0%16.2%
FY2411.9%20.4%
FY255.7%16.6%
FY266.3%16.5%

Free cash flow

−₹2,370 crFY26

Free cash flow (operating cash flow minus spending on plants) was negative in FY24 and FY26, while Angul was expanded; FY22 is only partly comparable, as the FY23 annual report shows FY22 operating cash flow of ₹13,391 crore against ₹16,048 crore in the cash-flow statement.

₹ crore · cash from operations minus spending on plants and equipment

See the numbers
Free cash flow (₹ crore · cash from operations minus spending on plants and equipment)
YearCash from operationsCapital spendingFree cash flow
FY22₹16,048₹2,944₹13,103
FY23₹7,276₹6,448₹827
FY24₹6,008₹8,517−₹2,509
FY25₹10,824₹10,607₹217
FY26₹7,204₹9,574−₹2,370
See all yearly numbers
Jindal Steel annual financials, FY22–FY26, ₹ crore
YearRevenueEBITDANet profitEPS (₹)Operating cashCapexFree cash
FY22₹51,086₹15,107₹5,753₹56.40₹16,048₹2,944₹13,103
FY23₹52,711₹8,565₹3,174₹39.07₹7,276₹6,448₹827
FY24₹50,027₹10,201₹5,938₹59.15₹6,008₹8,517−₹2,509
FY25₹49,765₹8,265₹2,812₹27.83₹10,824₹10,607₹217
FY26₹53,225₹8,788₹3,367₹33.12₹7,204₹9,574−₹2,370

EBITDA = profit before interest, tax and wear-and-tear of assets. Financial year runs April to March (March year end). Net profit is the share belonging to the company's owners.

06Who runs it

Who runs Jindal Steel, and did they deliver?

  • Naveen Jindal

    Chairman

  • V.R. Sharma

    Managing Director · since 2026

    Appointed Additional Director and Managing Director on 24 Jul 2026 for two years.

  • Sandeep Modi

    Chief Financial Officer · since 2026

    Appointed CFO on 24 Jul 2026, when interim CFO Sunil Agrawal stepped down.

  • Rajiv Kumar

    Chief Operating Officer · since 2026

    Appointed COO on 24 Jul 2026.

What they said, and what happened

2 delivered · 1 missed · 3 too early to tell

  1. Said on 30 Sep 2025

    The company said in a press release (30 Sep 2025) that Angul was closer to "its goal of achieving 12 MTPA within the current financial year".

    What happened

    Angul reached 12 million tonnes a year on 24 Mar 2026, taking company capacity to 15.6 million.

    Delivered
  2. Said on 31 Jan 2026

    Then-CEO Gautam Malhotra said in the Q3 FY26 call (31 Jan 2026) that the company was on track for its FY26 sales guidance of 8.5–9 million tonnes.

    What happened

    FY26 sales were 8.68 million tonnes.

    Delivered
  3. Said on 31 Jan 2026

    Then-CEO Gautam Malhotra said in the Q3 FY26 call (31 Jan 2026) that the slurry pipeline guidance for the end of FY26 was maintained.

    What happened

    The Q4 FY26 presentation moved it to Q1 FY27; the pipeline was commissioned in Q2 FY27.

    Missed
  4. Said on 2 May 2026

    Then-CEO Gautam Malhotra said in the Q4 FY26 call (2 May 2026) that the FY27 plan is 11–11.5 million tonnes of production and 10.5–11 million tonnes of sales.

    What happened

    H1 FY27 production was 4.79 million tonnes and sales 4.61 million tonnes.

    Too early to tell
  5. Said on 23 Oct 2026

    MD V.R. Sharma said in the Q2 FY27 call (23 Oct 2026) that the 2 million tonne DRI plant will be commissioned in June 2027.

    What happened

    He added that shipping issues with imported equipment may delay it.

    Too early to tell
  6. Said on 29 Dec 2025

    The company said on 29 Dec 2025 that it plans to raise structural steel capacity at Raigarh from 1.2 to 2.4 million tonnes a year by mid 2028.

    What happened

    Not yet reported.

    Too early to tell

07What could go wrong

What could go wrong for Jindal Steel?

  • Governance

    Promoter shares pledged

    Promoter companies had pledged 10.11% of their shares on 30 Sep 2026, as loan collateral. If a lender sells pledged shares, the promoter holding falls.

    Watch The pledged share in each quarterly shareholding pattern: 9.92% in Jun 2026, 10.11% in Sep 2026.

  • Pricing

    Steel prices move with the market

    ICRA's 4 Aug 2026 report says Jindal Steel operates in a cyclical industry with volatile metal prices. It notes the safeguard duty on steel imports announced in Dec 2025.

    Watch Company adjusted EBITDA per tonne: ₹10,529 in Q2 FY27.

  • Raw-material prices

    Coking coal and currency

    Raw materials and goods bought took ₹47.6 of every ₹100 that came in during FY26. ICRA says the company imports coking coal, so it faces currency risk too.

    Watch Coking coal costs in each results presentation; the Q2 FY27 deck says raw material costs rose from Q1 on coking coal.

  • Debt

    Higher debt after the expansion

    Borrowings rose from ₹12,435 crore on 31 Mar 2023 to ₹22,038 crore on 31 Mar 2026. Quarterly finance costs rose from ₹371 crore in Q2 FY26 to ₹566 crore in Q2 FY27.

    Watch Company net debt to EBITDA: 1.51 times on 30 Sep 2026, against its own framework of below 1.5 times through the cycle.

  • Execution

    Projects running late

    The slurry pipeline came in Q2 FY27, after the end-FY26 date given in Jan 2026. MD V.R. Sharma said on 23 Oct 2026 that shipping issues with imported equipment may delay the DRI plant.

    Watch Commissioning of the DRI plant (stated for Jun 2027) and the new pellet plant.

  • Regulation

    Mining rules and new mines

    ICRA says mine lease approvals, production limits and environmental clearances could change the company's operations and costs. It won two iron ore blocks in Mar 2026 at premiums of 101.20% and 111.15%.

    Watch Start dates of the new iron ore and coal blocks.

  • Other

    Overseas mining losses

    The company wrote down its Australian mining business by ₹1,091.59 crore in FY25 and ₹833.62 crore in FY26. Its Mauritius subsidiary carries a going-concern emphasis of matter in the FY26 audit report.

    Watch Further one-off charges in the exceptional items line of each quarter's results.

08Supporters and critics

What do supporters and critics point to?

Facts each side points to. We don't say which side is right.

What supporters point to

  • Steel production rose from 8.12 million tonnes in FY25 to 9.25 million in FY26, and Angul reached 12 million tonnes a year of capacity on 24 Mar 2026.
  • Q2 FY27 revenue was ₹16,679 crore, up 42.7% from ₹11,686 crore in Q2 FY26.
  • ICRA and CARE upgraded the company to AA+ (Stable) in Jul 2026.
  • ICRA says own mines meet about a third of the iron ore need, and the 192 km slurry pipeline and Paradip port started in 2026.
  • Free cash flow was ₹2,243 crore in H1 FY27, against minus ₹1,574 crore in H1 FY26.

What critics point to

  • Promoters had pledged 10.11% of their shares on 30 Sep 2026.
  • Borrowings rose from ₹12,435 crore in Mar 2023 to ₹22,038 crore in Mar 2026, and free cash flow was negative in FY24 and FY26.
  • Profit per ₹100 of revenue was ₹6.3 in FY26, against ₹11.9 in FY24, a year with only ₹298 crore of tax.
  • Australian mine write-downs cost ₹1,092 crore in FY25 and ₹834 crore in FY26.
  • A CEO appointed in Oct 2025 left in Jul 2026, and the MD, CFO and COO all started on 24 Jul 2026.

09What to watch next

What should you watch next at Jindal Steel?

Next event

Q3 FY27 results

Date not announced yet.

  • Volumes against the FY27 plan

    Then-CEO Gautam Malhotra set an FY27 plan of 11–11.5 million tonnes of production on 2 May 2026. H1 FY27 production was 4.79 million tonnes; on 23 Oct 2026 CFO Sandeep Modi said of the sales guidance (10.5–11 million tonnes) "we should be in the midrange of the guidance".

  • Debt against the company's own limit

    The company's framework is net debt below 1.5 times EBITDA through the cycle. It reported 1.51 times on 30 Sep 2026, in its Q2 FY27 presentation.

  • The promoter pledge

    10.11% of promoter shares were pledged on 30 Sep 2026, against 13.11% pledged or otherwise encumbered (reported as one figure) on 31 Mar 2024. Each quarterly shareholding pattern updates the figure.

10Key facts

Key facts about Jindal Steel

What does Jindal Steel do?
Jindal Steel Limited, formerly Jindal Steel & Power, makes steel at Angul in Odisha and Raigarh in Chhattisgarh. Jindal Steel sold 8.68 million tonnes of steel in FY26; flat products such as coils and plates were 49% of that volume.
How does Jindal Steel make money?
Jindal Steel earns the gap between the price of the steel it sells and the cost of iron ore, coal and running its plants. Of every ₹100 that came in during FY26, Jindal Steel spent ₹47.6 on raw materials and goods bought and kept ₹6.3 as profit.
Who are Jindal Steel's customers?
By FY26 sales volume, Jindal Steel sold 35% to infrastructure, 32% through distribution (dealers), 18% to building and construction, 12% to engineering and packaging and 3% to automotive. Exports were 6.8% of Jindal Steel's FY26 sales volume. Jindal Steel does not disclose revenue by customer.
How big is Jindal Steel?
Jindal Steel's FY26 revenue was ₹53,225 crore and its profit for shareholders was ₹3,367 crore. Jindal Steel had 15.6 million tonnes a year of crude steel capacity on 24 Mar 2026 and produced 9.25 million tonnes in FY26.
Who owns Jindal Steel?
On 30 Sep 2026 Jindal Steel's promoter group owned 62.69%, led by OPJ Trading (18.47%) and Opelina Sustainable Services (14.42%); 10.11% of the promoter shares were pledged. Foreign investors held 8.75% of Jindal Steel and Indian institutions 19.70%.
Is Jindal Steel the same company as Jindal Steel & Power?
Yes. Jindal Steel & Power Limited was renamed Jindal Steel Limited with effect from 22 Jul 2025, and NSE changed the listed name from 29 Aug 2025. The NSE symbol is JINDALSTEL.
What happened to Jindal Power?
Jindal Steel & Power sold its 96.42% stake in Jindal Power Ltd to Worldone Private Limited; the sale was completed on 30 May 2022. The consideration was ₹7,401.29 crore, of which ₹3,015 crore was paid in cash.
How much debt does Jindal Steel have?
Jindal Steel's borrowings were ₹21,791 crore on 30 Sep 2026 (unaudited), and its cash and investments ₹7,237 crore. Jindal Steel reported net debt of ₹14,786 crore, 1.51 times its EBITDA of the last twelve months.
How did Jindal Steel do in Q2 FY27?
Jindal Steel's revenue in Q2 FY27 (Jul–Sep 2026) was ₹16,679 crore, up 42.7% from ₹11,686 crore a year earlier. Jindal Steel's profit for shareholders was ₹774 crore, against ₹638 crore in Q2 FY26.
Does Jindal Steel pay a dividend?
Jindal Steel paid a dividend of ₹2 per share for each year from FY22 to FY26.

Terms on this page

Each explains the term in plain English, with the same number from other companies on Cityfort.

Go deeper

More detail from the same filings. Open any section.

11What it sells

11What it sells

What does Jindal Steel sell?

Jindal Steel turns iron ore and coal into steel and sells it as coils, plates, bars, rods and rails. Its two steel plants are at Angul in Odisha and Raigarh in Chhattisgarh. It sold 8.68 million tonnes in FY26.
  • Flat steel

    Hot-rolled and cold-rolled coils, plates and sheet piles, used in pipelines, construction equipment and fabrication. Flats were 49% of FY26 sales volume and 61% in Q2 FY27.

  • Long steel

    TMT rebars (reinforcing bars for concrete, sold under the Jindal Panther brand), rails, structural sections, wire rods and round bars, used in buildings, railways and bridges.

  • Semi-finished and special products

    Cathode bars for aluminium smelters, fabricated sections and track shoes for mining equipment.

  • Sales through dealers

    The Jindal Panther rebar brand serves individual home builders, small contractors and developers. The company had 6,010 dealers at Q2 FY27, up from 5,763 at Q4 FY26.

What it does

  • Does: Makes steel at Angul, Odisha (12 million tonnes a year) and Raigarh, Chhattisgarh (3.6 million tonnes a year)
  • Does: Mines iron ore and thermal coal in India; ICRA says its own mines meet about a third of its iron ore need
  • Does: Pumps iron ore mixed with water through a 192 km slurry pipeline to Angul, commissioned in Q2 FY27
  • Does: Runs a port at Paradip through a subsidiary; its first phase (12.5 million tonnes a year) began commercial operation on 15 Oct 2026
  • Does: Has coal mining interests in Mozambique and South Africa

What it does not do

  • Does not: Own Jindal Power any more: that business was sold in May 2022
  • Does not: Get most of its iron ore from its own mines: ICRA says about a third comes from them
  • Does not: Mine coking coal in India: ICRA says it imports coking coal
  • Does not: Sell mostly abroad: exports were 6.8% of FY26 sales volume
  • Does not: Disclose revenue by customer
12How the money flows

12How the money flows · FY26

How does money flow through Jindal Steel?

Money in

  • Revenue from operations₹53,225 cr
  • Other income₹328 cr

The company

Jindal Steel

₹53,553 cr came in

Money out

  • Raw materials and goods bought₹25,495 cr
  • Other running costs₹16,820 cr
  • Employee costs₹1,251 cr
  • Depreciation₹3,171 cr
  • Interest₹1,517 cr
  • Tax, one-off charges and other items₹1,932 cr
  • Net profit for Jindal Steel shareholders₹3,367 cr
  1. In FY26 customers paid Jindal Steel ₹53,225 crore, and it earned ₹328 crore of other income.
  2. Iron ore, coal and other raw materials and goods bought took ₹25,495 crore.
  3. Other running costs took ₹16,820 crore, and employees ₹1,251 crore.
  4. Depreciation (wear and tear of plants) was ₹3,171 crore and interest ₹1,517 crore.
  5. Tax took ₹1,052 crore and one-off charges ₹871 crore, mostly an Australian mine write-down. That left ₹3,367 crore for shareholders.
13What it needs to run

13What it needs to run

What does Jindal Steel need to run?

  • Iron ore

    Own mines at Kasia (7.5 million tonnes a year), Roida-I (3.0) and Tensa (3.11). ICRA's 4 Aug 2026 report says they meet about a third of the company's need.

  • Coal

    Thermal coal from its own Indian mines, including Gare Palma IV/6, Utkal C and Utkal B1. Coking coal, which blast furnaces burn to make iron, is imported, ICRA says.

  • Plants

    Crude steel capacity is 15.6 million tonnes a year: Angul 12.0 and Raigarh 3.6. A bar and wire rod mill runs at Patratu, Jharkhand.

  • Pipeline and port

    A 192 km pipeline carries iron ore to Angul, and a subsidiary's port at Paradip opened its first 12.5 million tonne phase on 15 Oct 2026.

  • People

    The FY26 sustainability report lists 7,986 employees and 2,521 workers for Jindal Steel Limited on its own, without subsidiaries.

14Where growth could come from

14Where growth could come from

Where could Jindal Steel's growth come from?

Then-CEO Gautam Malhotra said in the Q4 FY26 earnings call (2 May 2026) that the FY27 production plan is 11–11.5 million tonnes and sales 10.5–11 million tonnes. In the Q2 FY27 call (23 Oct 2026), MD V.R. Sharma said the aim is about 11 million tonnes of production this year, and CFO Sandeep Modi said of its sales guidance "we should be in the midrange of the guidance".
Management statement, 23 Oct 2026. Reported as a statement, not our forecast.
  • Bigger Angul plant

    Working

    Production 4.79 mt in H1 FY27, from 4.09 mt

    Angul reached 12 million tonnes a year of capacity on 24 Mar 2026. H1 FY27 production was 4.79 million tonnes, against 4.09 million in H1 FY26.

    Status: Working, on track against what the company said.

  • More flat steel

    Working

    Flats 61% of Q2 FY27 sales

    Flat products rose from 43% of sales volume in FY25 to 49% in FY26 and 61% in Q2 FY27.

    Status: Working, on track against what the company said.

  • Slurry pipeline and Paradip port

    New

    Port phase I: 12.5 MTPA from 15 Oct 2026

    The 192 km pipeline from Barbil to Angul was commissioned in Q2 FY27. The port's first phase began commercial operation on 15 Oct 2026; the project costs ₹3,393 crore in total.

    Status: New, recently announced.

  • New DRI and pellet plants

    Early

    DRI plant 2 MTPA, due Jun 2027

    MD V.R. Sharma said in the Q2 FY27 call (23 Oct 2026) that the DRI plant will be commissioned in June 2027, and that he hoped the new pellet plant would be fully commissioned by then. DRI is iron made from ore with gas.

    Status: Early, too early to judge.

  • Raigarh structural steel mill

    New

    1.2 → 2.4 MTPA by mid 2028

    The company said on 29 Dec 2025 that it plans to raise structural steel capacity at Raigarh from 1.2 to 2.4 million tonnes a year by mid 2028.

    Status: New, recently announced.

  • New mines

    Early

    2 iron ore blocks, 1 coal block

    It was named preferred bidder for two iron ore blocks on 11 Mar 2026, at premiums of 101.20% and 111.15%, and won the Saradhapur Jalatap East coal block in Mar 2025.

    Status: Early, too early to judge.

Status compares progress with what the company itself said it would do: Working = on track against what the company said; Mixed = partly on track; Behind = behind the company's own plan; New = recently announced; Early = too early to judge.

15Financial strength and debt

15Financial strength · 30 Sep 2026

How much debt does Jindal Steel have?

On 30 Sep 2026 Jindal Steel's borrowings were ₹14,554 crore more than its cash and investments, about twice its FY26 operating cash flow of ₹7,204 crore.
  • Total debt₹21,791 cr
  • Cash and investments₹7,237 cr
  • Net debt (debt minus cash)₹14,554 cr
  • Net worth (shareholders' money)₹52,367 cr
Debt to equity
0.42×
₹ of debt for every ₹1 of shareholders' money
  • Borrowings = long-term plus short-term borrowings on the balance sheet. Cash and investments = cash, other bank balances and current investments. The 30 Sep 2026 figures are unaudited.
  • Net debt is a Cityfort calculation from the Q2 FY27 results: ₹21,791 crore − ₹7,237 crore = ₹14,554 crore.
  • The company reports net debt of ₹14,786 crore, 1.51 times EBITDA of the last twelve months; it does not state why its long-term debt figure is about ₹232 crore higher. It leaves out ₹434 crore of capital acceptances.
  • Borrowings rose from ₹12,435 crore on 31 Mar 2023 to ₹22,038 crore on 31 Mar 2026. Company-reported capex from FY20 to Q2 FY27 was ₹43,637 crore.
  • Net worth is the equity belonging to Jindal Steel's shareholders; debt to equity is borrowings ÷ that net worth.
16Who owns it

16Who owns it · Q2 FY27

Who owns Jindal Steel?

  • Promoters (founders or parent company)62.7%, of which pledged 6.3%
  • Foreign institutions (FII)8.8%
  • Indian institutions (DII)19.7%
  • Public and others8.9%
  • Pledged: 10.1% of promoter shares (6.3% of all shares)6.3%

Promoter shares pledged

10.1% of promoter shares

A pledge means promoters gave shares as security for a loan. If the loan isn't repaid, the lender can sell them.

How ownership changed
Jindal Steel shareholding by quarter, %
QuarterPromotersFIIDIIPublicOthers†Pledged*
Q3 FY2461.2%11.8%15.3%10.0%1.7%12.9%
Q4 FY2461.2%11.9%14.7%10.4%1.7%13.1%
Q1 FY2561.2%12.6%15.3%10.0%0.8%13.0%
Q2 FY2561.2%12.2%16.1%9.8%0.8%13.1%
Q3 FY2561.2%11.0%17.3%9.8%0.8%12.8%
Q4 FY2562.2%9.6%17.7%9.7%0.8%11.4%
Q1 FY2662.4%9.8%18.1%9.5%0.3%11.2%
Q2 FY2662.4%9.4%18.7%9.2%0.3%11.2%
Q3 FY2662.7%9.0%19.1%8.9%0.3%10.9%
Q4 FY2662.7%9.2%19.1%8.7%0.3%10.9%
Q1 FY2762.7%8.8%19.5%8.7%0.2%9.9%
Q2 FY2762.7%8.8%19.7%8.7%0.2%10.1%

* Pledged = share of the promoters' own holding reported as pledged. In older filings this can include shares “otherwise encumbered”; the governance flags say when.

† Others = Jindal Steel Employee Benefit Trust.

17What it does with profit

17What it does with profit

What does Jindal Steel do with its profit?

Dividends are per ₹1 share. The FY26 dividend of ₹2 was recommended on 1 May 2026, with a record date of 21 Aug 2026. Payout = dividend per share ÷ basic earnings per share (Cityfort calculation from the annual results). Dividends paid were ₹204 crore in FY26.

Dividend per share

₹2.00FY26

Dividend paid for each share, by financial year.

₹ per share

See the numbers
Dividend per share (₹ per share)
YearDividend per shareShare of profit paid out
FY22₹2.003.5%
FY23₹2.005.1%
FY24₹2.003.4%
FY25₹2.007.2%
FY26₹2.006.0%

No buybacks or fund raises in the period covered.

18Governance signals

18Governance signals

What do Jindal Steel's governance filings show?

Auditor
S S Kothari Mehta & Co. LLP, since 2026
Auditor changes
28 Aug 2026: Lodha & Co LLP → S S Kothari Mehta & Co. LLP (Lodha & Co LLP's second term ended at the 47th AGM; the board appointed the new firm on 24 Jul 2026, subject to members' approval. It signed the Q2 FY27 review.)
Audit qualifications
None reported
Related-party dealings
Jindal Steel & Power sold Jindal Power Ltd to Worldone Private Limited in May 2022 for ₹7,401.29 crore; the FY23 annual report lists Worldone as a related party. Jindal Power Ltd held 1.18% of Jindal Steel as part of the promoter group on 30 Sep 2026.
Credit rating
ICRA [ICRA]AA+ (outlook Stable), 4 Aug 2026

A credit rating describes the company's ability to repay debt. It is not a rating of the share.

Flags to know about

  • pledge · 21 Oct 2026

    Promoter shares pledged

    On 30 Sep 2026 promoter companies had pledged 64,642,093 shares, 10.11% of the promoter group's holding; Siddeshwari Tradex and Virtuous Tradecorp were among them. The share was between 9.92% and 13.11% in the 12 quarters from Dec 2023 (Dec 2023 to Mar 2025: pledged or otherwise encumbered).

  • other · 6 Aug 2026

    Going-concern doubt at a foreign subsidiary

    The FY26 audit opinion on the group accounts was unmodified, with an emphasis of matter on uncertainty over whether Jindal Steel (Mauritius) Ltd can continue as a going concern. That subsidiary had accumulated losses of ₹6,966.40 crore and negative net worth of ₹5,379.22 crore.

  • other · 1 Nov 2026

    Changes at the top

    CEO Gautam Malhotra, appointed with effect from 28 Oct 2025, resigned with effect from 15 Jul 2026. On 24 Jul 2026 the board appointed a new MD, CFO and COO. Head of HR Sukhjit S. Pasricha left on 31 Oct 2026.

  • auditor · 24 Jul 2026

    New statutory auditor

    Lodha & Co LLP's second term as auditor ended at the 47th AGM on 28 Aug 2026. The board appointed S S Kothari Mehta & Co. LLP on 24 Jul 2026, subject to members' approval.

  • related party · 30 May 2022

    Jindal Power sold to a related party

    Jindal Power Ltd was sold to Worldone Private Limited, which the FY23 annual report lists as a related party. Jindal Power Ltd now holds 1.18% of Jindal Steel in the promoter group.

  • other · 6 Aug 2026

    Political contributions

    The FY26 annual report's notes show donations that included contributions to political parties of nil in FY26 and ₹95 crore in FY25.

  • other · 4 Aug 2026

    Credit ratings upgraded

    CARE upgraded its long-term rating to CARE AA+ (Stable) in Jul 2026, and ICRA upgraded to [ICRA]AA+ (Stable), told to the exchanges on 27 Jul 2026. Both were AA (Stable) in Oct 2025.

19What the market paid

19What the market paid · price as of 11 Nov 2026

What did the market pay for Jindal Steel on 11 Nov 2026?

Price as of 11 Nov 2026 (shown for education; prices change daily).

Jindal Steel's NSE closing price was ₹1,161.70 as of 11 Nov 2026. Market value is that price × 1,020,088,097 shares (30 Sep 2026 shareholding pattern) = ₹118,504 crore. P/E (market value ÷ profit for shareholders over the four quarters to Q2 FY27, ₹2,854 crore) was 41.5. P/B (market value ÷ owners' equity of ₹52,367 crore on 30 Sep 2026) was 2.26. The FY26 dividend of ₹2 is 0.17% of the 11 Nov 2026 price. All ratios are Cityfort calculations from the NSE bhavcopy and the company's filings.

Share price
₹1,161.70
Market value (market cap)
₹118,504 cr
P/E
41.5×
P/B
2.3×

Source: NSE capital market bhavcopy, 11 Nov 2026 (JINDALSTEL close); Shareholding pattern as of 30 Sep 2026 (XBRL); Q2 FY27 consolidated results (Integrated Filing XBRL) and 4 more

20How it got here

20How it got here

How did Jindal Steel get here?

  1. 1979

    Milestone

    Incorporated

    The company was incorporated in 1979, according to its FY26 sustainability report.

  2. 2022

    Business-model change

    Jindal Power sold

    The sale of Jindal Power Ltd to Worldone Private Limited, agreed by the board in Aug 2021, was completed on 30 May 2022.

  3. 2025

    Milestone

    New coal block

    On 27 Mar 2025 the company was declared successful bidder for the Saradhapur Jalatap East coal block.

  4. 2025

    Milestone

    Renamed Jindal Steel

    Jindal Steel & Power Limited became Jindal Steel Limited with effect from 22 Jul 2025; NSE changed the listed name from 29 Aug 2025.

  5. 2025

    Milestone

    Second blast furnace at Angul

    Blast Furnace-II was blown in on 26 Sep 2025, and a new basic oxygen furnace (which turns iron into steel) on 30 Sep 2025 raised Angul's steelmaking capacity from 6 to 9 million tonnes a year.

  6. 2026

    Milestone

    Iron ore blocks won

    On 11 Mar 2026 the company was named preferred bidder for the Thakurani-A1 and Rengalaberha NE Extension and Nuagan West iron ore blocks.

  7. 2026

    Business-model change

    Angul reaches 12 MTPA

    On 24 Mar 2026 Angul's capacity reached 12 million tonnes a year, taking the company to 15.6 million.

  8. 2026

    Milestone

    Ratings upgraded to AA+

    CARE (Jul 2026) and ICRA (told to the exchanges on 27 Jul 2026) upgraded their long-term ratings from AA to AA+.

  9. 2026

    Milestone

    New management team

    CEO Gautam Malhotra left on 15 Jul 2026; on 24 Jul 2026 V.R. Sharma became MD, Sandeep Modi CFO and Rajiv Kumar COO.

  10. 2026

    Milestone

    Paradip port opens

    Jindal Paradip Port's first phase, 12.5 million tonnes a year, began commercial operation on 15 Oct 2026.

21Sources and changes

Where every number on this page comes from

Sources (58 documents)
  1. S1Integrated Annual Report FY26 (2025-26) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 6 Aug 2026
  2. S2Integrated Annual Report FY25 (2024-25) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 8 Aug 2025
  3. S3Integrated Annual Report FY24 (2023-24) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 8 Aug 2024
  4. S4Integrated Annual Report FY23 (2022-23) · Jindal Steel & Power Ltd (filed with BSE) · Tier 1: company or exchange filing · 5 Aug 2023
  5. S5Annual Report FY22 (2021-22) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 8 Sep 2022
  6. S6Q2 FY27 unaudited results and limited review reports (board outcome 23 Oct 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 23 Oct 2026
  7. S7Q1 FY27 board outcome: results, MD/CFO/COO appointments, auditor appointment (24 Jul 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 24 Jul 2026
  8. S8Q4 FY26 board outcome: audited results and final dividend (1 May 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 1 May 2026
  9. S9Q2 FY27 consolidated results (Integrated Filing XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 23 Oct 2026
  10. S10Q1 FY27 consolidated results (Integrated Filing XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 24 Jul 2026
  11. S11Q4 FY26 and FY26 consolidated results incl. balance sheet and cash flow (Integrated Filing XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 1 May 2026
  12. S12Q3 FY26 consolidated results (Integrated Filing XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 30 Jan 2026
  13. S13Q2 FY26 consolidated results (Integrated Filing XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 28 Oct 2025
  14. S14Q1 FY26 consolidated results (Integrated Filing XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 12 Aug 2025
  15. S15Q4 FY25 and FY25 consolidated results incl. balance sheet and cash flow (Integrated Filing XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 30 Apr 2025
  16. S16Q3 FY25 consolidated results (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 31 Jan 2025
  17. S17Q4 FY24 and FY24 consolidated results (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 14 May 2024
  18. S18Q4 FY23 and FY23 consolidated results (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 17 May 2023
  19. S19Q4 FY22 and FY22 consolidated results (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 31 May 2022
  20. S20Q2 FY27 earnings presentation (23 Oct 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 23 Oct 2026
  21. S21Q1 FY27 earnings presentation (24 Jul 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 24 Jul 2026
  22. S22Q4 FY26 earnings presentation (2 May 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 2 May 2026
  23. S23Q3 FY26 earnings presentation (30 Jan 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 30 Jan 2026
  24. S24Q2 FY27 earnings call transcript (call 23 Oct 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 30 Oct 2026
  25. S26Q4 FY26 earnings call transcript (call 2 May 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 6 May 2026
  26. S27Q3 FY26 earnings call transcript (call 31 Jan 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 5 Feb 2026
  27. S28Shareholding pattern as of 30 Sep 2026 (XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 21 Oct 2026
  28. S29Shareholding pattern as of 30 Jun 2026 (XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 21 Jul 2026
  29. S30Shareholding pattern as of 31 Mar 2026 (XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 21 Apr 2026
  30. S31Shareholding pattern as of 31 Dec 2025 (XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 20 Jan 2026
  31. S32Shareholding pattern as of 30 Sep 2025 (XBRL) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 21 Oct 2025
  32. S33Shareholding pattern as of 30 Jun 2025 (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 21 Jul 2025
  33. S34Shareholding pattern as of 31 Mar 2025 (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 21 Apr 2025
  34. S35Shareholding pattern as of 31 Dec 2024 (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 20 Jan 2025
  35. S36Shareholding pattern as of 30 Sep 2024 (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 18 Oct 2024
  36. S37Shareholding pattern as of 30 Jun 2024 (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 20 Jul 2024
  37. S38Shareholding pattern as of 31 Mar 2024 (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 16 Apr 2024
  38. S39Shareholding pattern as of 31 Dec 2023 (XBRL) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 20 Jan 2024
  39. S40ICRA rationale: long-term rating upgraded to [ICRA]AA+ (Stable); short-term reaffirmed (4 Aug 2026, revised) · ICRA Limited · Tier 2: rating agency or regulator · 4 Aug 2026
  40. S41CARE Ratings press release: Jindal Steel Limited (revised), 7 Jul 2026 · CARE Ratings Limited · Tier 2: rating agency or regulator · 7 Jul 2026
  41. S42Intimation: ICRA rating upgrade to AA+ (27 Jul 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 27 Jul 2026
  42. S43Intimation: CARE rating upgrade to AA+ (1 Jul 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 1 Jul 2026
  43. S44Intimation: CARE and ICRA ratings reaffirmed at AA (10 Oct 2025) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 10 Oct 2025
  44. S45Business Responsibility and Sustainability Report FY26 · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 6 Aug 2026
  45. S46NSE circular: change in name of Jindal Steel & Power Limited to Jindal Steel Limited w.e.f. 29 Aug 2025 · National Stock Exchange of India · Tier 1: company or exchange filing · 22 Aug 2025
  46. S47Press release: Jindal Steel & Power Limited renamed as Jindal Steel Limited (22 Jul 2025) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 22 Jul 2025
  47. S48Press release: Blast Furnace-II commissioned at Angul (26 Sep 2025) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 26 Sep 2025
  48. S49Press release: 3 MTPA BOF commissioned at Angul, steelmaking capacity 9 MTPA (30 Sep 2025) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 30 Sep 2025
  49. S50Press release: 6 MTPA expansion at Angul completed, capacity 12 MTPA (24 Mar 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 24 Mar 2026
  50. S51Press release: Raigarh structural steel capacity to double to 2.4 MTPA (29 Dec 2025) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 29 Dec 2025
  51. S52Press release: preferred bidder for Thakurani-A1 iron ore block (11 Mar 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 11 Mar 2026
  52. S53Press release: preferred bidder for Rengalaberha NE Extension and Nuagan West iron ore block (11 Mar 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 11 Mar 2026
  53. S54Press release: successful bidder for Saradhapur Jalatap East coal block (27 Mar 2025) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 27 Mar 2025
  54. S55Intimation: Jindal Paradip Port Ltd Phase I (12.5 MTPA) commercial operation from 15 Oct 2026 · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 15 Oct 2026
  55. S56Intimation: resignation of CEO Gautam Malhotra w.e.f. 15 Jul 2026 · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 11 Jul 2026
  56. S57Intimation: cessation of Head-HR Sukhjit S. Pasricha (31 Oct 2026) · Jindal Steel Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 1 Nov 2026
  57. S58Press release: update on Jindal Power Limited (JPL) divestment (7 Aug 2021) · Jindal Steel & Power Ltd (filed with NSE/BSE) · Tier 1: company or exchange filing · 8 Aug 2021
  58. S59NSE capital market bhavcopy, 11 Nov 2026 (JINDALSTEL close) · National Stock Exchange of India · Tier 1: company or exchange filing · 11 Nov 2026
Changes to this page (v1 · 12 Nov 2026)
  1. v1 · 12 Nov 2026First version. (first version)

Numbers come only from tier 1 and tier 2 sources. Read how we research.

Disclaimer

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

Investing in securities involves risk, including loss of capital. Before making any investment decision, do your own research and consider consulting a SEBI-registered investment adviser.

Cityfort, its owners and contributors may or may not hold securities of companies covered. Content is not an offer or solicitation to buy or sell any security.

Read the full disclaimer

Cityfort publishes educational content that explains how listed companies work. Cityfort is not registered with the Securities and Exchange Board of India (SEBI) as an Investment Adviser or Research Analyst and does not provide investment advice, recommendations, ratings, price targets or any opinion on whether to buy, sell or hold any security.

All information is taken from publicly available sources, mainly company filings on BSE and NSE, which are listed on each page with dates. We work to keep it accurate and correct errors publicly, but we do not guarantee that it is complete, accurate or up to date. Any market price or price-based ratio shown is dated, may be out of date by the time you read it, and is included only to explain concepts.

Statements by company management are reported as statements, with their date and source; they are not our forecasts.