Hitachi Energy India makes transformers, switchgear and grid systems for power utilities, renewable developers and industry, earning ₹8,148 crore of revenue in FY26.

Follow Hitachi Energy India

Email me when Hitachi Energy India's page is updated after results.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

Hitachi Energy India Limited · Bengaluru, Karnataka · Founded 2019

What changed in Q2 FY27 →

Updated for Q2 FY27 · checked

Revenue, FY26
₹8,148 cr
Profit, FY26
₹988 cr
Order backlog, 30 Sep 2026
₹33,335 cr
Employees, 31 Mar 2026
2,777
Promoter (Hitachi Energy Ltd), Sep 2026
71.31%

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

The short version

Hitachi Energy India in 5 points

  1. 1 · What it sells

    Hitachi Energy India sells power-grid equipment such as transformers, switchgear and HVDC links, plus grid projects and service, and its FY26 revenue was ₹8,148 crore.

    More: what it sells

  2. 2 · Who pays it

    In FY26 customers in India paid 73.8% of Hitachi Energy India's revenue and customers abroad 26.2%, and Hitachi group companies and related parties bought ₹1,928 crore.

    More: who pays it

  3. 3 · What it keeps from ₹100

    Of every ₹100 that came in during FY26, Hitachi Energy India kept ₹11.8 as profit, including ₹240 crore of other income and after a ₹54 crore one-off charge, and its EBITDA was ₹1,198 crore.

    More: what it keeps from ₹100

  4. 4 · Where the operating profit comes from

    Hitachi Energy India reports one segment, so profit by product line is not disclosed, while in FY26 sale of products was 65.7% of revenue and projects and services contracts 28.9%.

    More: where the operating profit comes from

  5. 5 · The one thing to watch

    On 30 Sep 2026 Hitachi Energy India had ₹33,335 crore of orders to deliver against FY26 revenue of ₹8,148 crore, and management said HVDC projects bring less revenue in their first year.

    More: the one thing to watch

Sources: From Hitachi Energy India's FY26 annual report, its Q2 FY27 results and the 7 Aug 2026 analyst call · checked

01Where the money goes · FY26

Where does ₹100 of Hitachi Energy India's money go?

Of every ₹100 that came in (revenue plus other income), this is where it went.

Hitachi Energy India · FY26

Receipt for every ₹100

Where ₹100 of Hitachi Energy India's money went in FY26
Materials, bought-out items and subcontractors₹58.1
Employees₹7.7
Royalty and technology fees to the parent₹2.9
Other running costs₹13.5
Depreciation, interest and one-off labour-code charge₹2.0
Income tax₹4.0
Kept as profit₹11.8
Total₹100

Each line = amount ÷ total money in × 100. Lines may not add to exactly ₹100 because of rounding.

How this is worked out

Of every ₹100 that came in during FY26: revenue (₹8,148 crore) plus other income (₹240 crore). Materials are net of a ₹149 crore build-up of inventory. Other running costs are rounded down by 0.1 so the lines add to 100. Cityfort calculation from the FY26 annual report.

Save this receipt as an image

Embed this receipt or the key numbers

Paste this code into a blog or website to show the card you choose, with a link back to this page.

Each week: the next company due to report results, explained in 5 points.

We'll email you once a week with what changed on Cityfort. Facts only, no tips. Unsubscribe any time.

We store your email address with Kit, our email provider, which also records when you sign up and whether you open or click our emails. We send a confirmation email first. See our privacy policy.

02The business in one line

What does Hitachi Energy India do?

Power utilities, renewable developers, industry and Hitachi group companies pay it for grid equipment and projects; materials and subcontractors take ₹58.1 of every ₹100, and ₹11.8 is profit.

  • On 30 Jun 2026 it had ₹32,222 crore of orders still to deliver. FY26 revenue was ₹8,148 crore.
  • Its parent, Hitachi Energy Ltd, owns 71.31% and supplies the technology. Royalty and technology fees were ₹241.85 crore in FY26.

03Who pays it

Who pays Hitachi Energy India?

  • Customers in India

    73.8%

    of revenue

    Power utilities and transmission companies, renewable energy developers, industry, data centres, railways and metros, often buying through EPC contractors, distributors and equipment makers. Share is a Cityfort calculation from FY26 revenue by location.

  • Customers outside India

    26.2%

    of revenue

    Buyers in more than 70 countries. Hitachi Energy USA Inc and Hitachi Energy Sweden AB, both group companies, each bought more than 10% of FY26 export revenue.

  • Customers in India73.8%
  • Customers outside India26.2%

How spread out the customers are

No single customer gave Hitachi Energy India 10% or more of FY26 revenue; Adani Electricity Mumbai Infra Ltd did in FY24 and FY25. Hitachi group companies and related parties bought ₹1,928 crore in FY26, 23.7% of revenue (Cityfort calculation).

04How it makes money

How does Hitachi Energy India make money?

Orders come first, revenue follows over years, and fixed costs are spread over more sales.

Revenue grew from ₹4,469 crore in FY23 to ₹8,148 crore in FY26. Over the same years employee costs fell from ₹9.3 to ₹7.9 per ₹100 of revenue (Cityfort calculation). Crisil said in Mar 2025 the margin improved on "healthy order inflow, better operating leverage and higher input price pass-through abilities".

EBITDA margin

5.3%14.7%

FY23 to FY26

  1. Utilities, developers, industry and group companies place orders: ₹18,456 crore in FY26.
  2. Orders join the backlog: ₹29,555 crore on 31 Mar 2026.
  3. Factories and project teams deliver them; FY26 revenue was ₹8,148 crore.
  4. Staff costs were ₹7.9 per ₹100 of revenue in FY26, from ₹9.3 in FY23.
  5. EBITDA reached ₹1,198 crore in FY26, 14.7% of revenue.
  6. The company is adding capacity, including an about ₹2,000 crore Karjan transformer factory announced in Jun 2026.

↺ Step 6 feeds back into step 1.

05The numbers · Standalone (no material subsidiaries) · ₹ crore

How has Hitachi Energy India done?

Revenue

₹8,148 crFY26

FY26 revenue of ₹8,148 crore was 27.6% above FY25, and FY22 covers 15 months, Jan 2021 to Mar 2022, so it does not compare with FY23.

₹ crore

See the numbers
Revenue (₹ crore)
PeriodRevenue (₹ cr)
FY22₹4,884
FY23₹4,469
FY24₹5,237
FY25₹6,385
FY26₹8,148
Q2 FY25₹1,554
Q3 FY25₹1,620
Q4 FY25₹1,884
Q1 FY26₹1,479
Q2 FY26₹1,833
Q3 FY26₹2,082
Q4 FY26₹2,754
Q1 FY27₹2,494
Q2 FY27₹2,997

Net profit

₹988 crFY26

Profit rose from ₹384 crore in FY25 to ₹988 crore in FY26, and FY26 includes ₹240 crore of other income, mostly interest on deposits.

₹ crore

See the numbers
Net profit (₹ crore)
PeriodNet profit (₹ cr)EPS (₹)
FY22₹203₹47.99
FY23₹93.9₹22.16
FY24₹164₹38.64
FY25₹384₹90.36
FY26₹988₹221.63
Q2 FY25₹52.3₹12.34
Q3 FY25₹137₹32.41
Q4 FY25₹184₹43.15
Q1 FY26₹132₹29.53
Q2 FY26₹264₹59.31
Q3 FY26₹261₹58.65
Q4 FY26₹330₹74.14
Q1 FY27₹294₹65.99
Q2 FY27₹318₹71.46

Net profit for every ₹100 of revenue

₹12.1FY26

EBITDA margin rose from 5.3% in FY23 to 14.7% in FY26, after a ₹54 crore one-off labour-code charge in Q3 FY26 (15.4% before it, Cityfort calculation).

Net margin: ₹ of net profit per ₹100 of revenue

See the numbers
Net profit for every ₹100 of revenue (Net margin: ₹ of net profit per ₹100 of revenue)
YearNet marginEBITDA margin
FY224.2%7.1%
FY232.1%5.3%
FY243.1%6.7%
FY256.0%9.3%
FY2612.1%14.7%

Free cash flow

₹735 crFY26

Operating cash flow was ₹1,245 crore in FY26 and free cash flow ₹735 crore after ₹510 crore of capex, against ₹1,494 crore and ₹1,365 crore in FY25.

₹ crore · cash from operations minus spending on plants and equipment

See the numbers
Free cash flow (₹ crore · cash from operations minus spending on plants and equipment)
YearCash from operationsCapital spendingFree cash flow
FY22−₹127₹168−₹295
FY23₹5.4₹12−₹6.6
FY24₹252₹89.4₹163
FY25₹1,494₹129₹1,365
FY26₹1,245₹510₹735
See all yearly numbers
Hitachi Energy India annual financials, FY22–FY26, ₹ crore
YearRevenueEBITDANet profitEPS (₹)Operating cashCapexFree cash
FY22₹4,884₹347₹203₹47.99−₹127₹168−₹295
FY23₹4,469₹236₹93.9₹22.16₹5.4₹12−₹6.6
FY24₹5,237₹349₹164₹38.64₹252₹89.4₹163
FY25₹6,385₹596₹384₹90.36₹1,494₹129₹1,365
FY26₹8,148₹1,198₹988₹221.63₹1,245₹510₹735

EBITDA = profit before interest, tax and wear-and-tear of assets. Financial year runs April to March (March; FY22 ran 15 months from 1 Jan 2021, and before that the company used a 31 December year end year end). Net profit is the share belonging to the company's owners.

Sources (21)
Next: What they said, and what happened

06Who runs it

Who runs Hitachi Energy India, and did they deliver?

  • N Venu

    Managing Director & CEO

  • Ajay Singh

    Chief Financial Officer

  • Ismo Antero Haka

    Chairman · since 2025

    Chairman since 20 Aug 2025, after Achim Michael Braun.

  • Poovanna Ammatanda

    General Counsel & Company Secretary

What they said, and what happened

1 delivered · 1 missed · 2 too early to tell

  1. Said on 7 Nov 2025

    Keep a double-digit EBITDA margin on a year-on-year basis, after entering double digits ahead of its own target (Q2 FY26 call).

    What happened

    FY26 EBITDA margin was 14.7% after the one-off charge (Cityfort calculation); the company's own operational EBITDA was ₹1,252.6 crore. Q1 FY27 was 14.6% and Q2 FY27 13.6% (Cityfort calculation); the company put its Q2 FY27 operational EBITDA margin at 16.5%.

    Delivered
  2. Said on 7 Nov 2025

    CFO Ajay Singh said QIP capex spending would pick up "in the next 2 quarters", aiming for "around 700 plus (crore)" in FY26; the MD said ₹750 crore would be spent that year (Q2 FY26 call).

    What happened

    ₹469.66 crore of QIP money had gone to capex by 31 Mar 2026, ₹634.63 crore by 30 Jun 2026 and ₹820.11 crore by 30 Sep 2026.

    Missed
  3. Said on 7 Oct 2024

    Invest about ₹2,000 crore over 4–5 years in capacity, products and people.

    What happened

    A ₹300 crore expansion of the Mysuru insulation and components plant, announced Aug 2025, is part of this plan.

    Too early to tell
  4. Said on 7 Aug 2026

    Commission the about ₹2,000 crore Karjan large-transformer factory by Dec 2028.

    What happened

    Construction began in Jun 2026, the company said in the Q1 FY27 call.

    Too early to tell

07What could go wrong

What could go wrong for Hitachi Energy India?

  • Concentration

    Reliance on the Hitachi group

    The parent supplies the technology and group companies are large buyers. In FY26 the company paid ₹241.85 crore of royalty and technology fees, and group companies bought ₹1,928 crore, 23.7% of revenue (Cityfort calculation).

    Watch Royalty and group sales each year, against the FY27 limits approved on 12 Oct 2026.

  • Execution

    Large HVDC projects

    Two Indian HVDC orders were booked in FY25 and FY26; their values were not disclosed. Crisil names project implementation risk as a weakness. Management said in the 7 Aug 2026 call that HVDC revenue is lower in a project's first year.

    Watch Revenue growth against the ₹33,335 crore backlog (30 Sep 2026) each quarter.

  • Competition

    Competitive bidding

    Crisil says most large orders are won through competitive bidding, which puts pressure on profitability.

    Watch EBITDA margin each quarter (13.6% in Q2 FY27, Cityfort calculation).

  • Raw-material prices

    Materials and currency costs

    Materials and subcontractors took ₹58.1 of every ₹100 that came in during FY26. Crisil notes profitability is exposed to raw material price swings. Q1 FY27 included a ₹36.37 crore unrealised exchange loss. Q2 FY27 included a ₹56.07 crore loss on derivatives and exchange, shown inside expenses.

    Watch Material costs as a share of revenue and exchange gains or losses in each result.

  • Demand

    Power-sector spending cycles

    Crisil says the company is susceptible to capital investment cycles and structural issues in the power sector, and project deferrals can cause cost overruns.

    Watch Orders received each quarter (₹4,120.8 crore in Q2 FY27).

  • Execution

    Slower use of the QIP money

    ₹1,665.26 crore of the ₹2,485.37 crore net proceeds was unused on 30 Sep 2026. The monitoring agency's Sep 2026 report shows no delay on capex, but the ₹350 crore for working capital, planned for FY26, is unused and reported as delayed. The monitoring agency report says, based on a management undertaking and a chartered accountant's certificate dated 27 Oct 2026, that there is no immediate requirement for it.

    Watch Spending in each quarterly monitoring agency report.

  • Legal

    Tax disputes

    Tax authorities issued income-tax, customs and GST orders in Dec 2025 and Jan 2026, which the company says it will appeal or contest. Contingent liabilities were ₹124.74 crore on 31 Mar 2026.

    Watch Appeal outcomes and contingent liabilities in the annual report.

08Supporters and critics

What do supporters and critics point to?

Facts each side points to. We don't say which side is right.

What supporters point to

  • The order backlog was ₹32,222 crore on 30 Jun 2026, against FY26 revenue of ₹8,148 crore.
  • FY26 revenue rose 27.6% to ₹8,148 crore, and profit rose from ₹384 crore to ₹988 crore.
  • The company had no bank borrowings and ₹4,689 crore of cash and cash equivalents on 31 Mar 2026; Crisil rates it AAA/Stable.
  • Exports were 26.2% of FY26 revenue, and export orders were 33.6% of Q1 FY27 orders excluding HVDC.

What critics point to

  • It depends on its parent for technology: royalty and technology fees were ₹241.85 crore in FY26.
  • Of the ₹2,476.29 crore raised in the 2025 QIP, ₹634.63 crore had been used by 30 Jun 2026, behind the plan.
  • FY26 profit includes ₹240 crore of other income, 18.2% of profit before tax (Cityfort calculation).
  • It reports one segment and did not disclose the values of its large HVDC orders.

09What to watch next

What should you watch next at Hitachi Energy India?

Next event

Q3 FY27 results (date not announced; Q3 FY26 results came on 5 Feb 2026)

Date not announced yet.

  • HVDC revenue

    Management said in Aug 2026 that HVDC revenue picks up in a project's second and third years. The backlog was ₹33,335 crore on 30 Sep 2026.

  • Use of the QIP money

    ₹1,665.26 crore was unused on 30 Sep 2026, including the ₹350 crore set aside for working capital. The monitoring agency reports on it every quarter.

  • Margin after the currency loss

    EBITDA margin was 13.6% in Q2 FY27 (Cityfort calculation), including a ₹56.07 crore loss on derivatives and exchange. The company's operational EBITDA margin, which leaves out an ₹88.1 crore notional loss, was 16.5%.

  • Cash from operations

    Cash from operations was ₹91.33 crore in H1 FY27 (Apr–Sep 2026), against ₹874.18 crore a year earlier, as receivables and inventories rose. Capex was ₹369.52 crore.

10Key facts

Key facts about Hitachi Energy India

What does Hitachi Energy India do?
Hitachi Energy India Ltd makes and installs equipment for electricity grids: transformers, switchgear, HVDC (high-voltage direct current) links, grid automation systems and service. Its FY26 revenue from operations was ₹8,148 crore.
How does Hitachi Energy India make money?
Hitachi Energy India sells products and builds grid projects under contracts. In FY26 sale of products was 65.7% of its ₹8,148 crore revenue and projects and services contracts 28.9%. Sale of services was 2.7% and other operating revenue 2.8% (Cityfort calculation from the FY26 annual report).
Who are Hitachi Energy India's customers?
Hitachi Energy India sells to power utilities, renewable energy developers, industry, data centres, railways and metros, often through EPC contractors and equipment makers. In FY26, 26.2% of its revenue came from outside India, and Hitachi group companies and related parties bought ₹1,928 crore.
How big is Hitachi Energy India?
In FY26 (April 2025 to March 2026) Hitachi Energy India's revenue was ₹8,148 crore and profit ₹988 crore, against ₹6,385 crore and ₹384 crore in FY25. It had 2,777 employees on 31 Mar 2026.
Who owns Hitachi Energy India?
On 30 Sep 2026 Hitachi Energy Ltd of Zurich, owned by Japan's Hitachi Ltd, held 71.31% of Hitachi Energy India. Foreign investors held 11.96%, Indian institutions 6.54% and other shareholders 10.19%. No promoter shares were pledged.
How large is Hitachi Energy India's order backlog?
Hitachi Energy India's order backlog (orders won but not yet delivered) was ₹33,335 crore on 30 Sep 2026, 13.3% more than a year earlier. It received ₹4,120.8 crore of orders in Q2 FY27 (Jul–Sep 2026), up 85.9% from Q2 FY26.
Why does Hitachi Energy India's FY22 cover 15 months?
Hitachi Energy India moved from calendar years to April–March years. Its FY22 ran 15 months, from 1 Jan 2021 to 31 Mar 2022, so FY22 revenue of ₹4,884 crore does not compare with the 12-month years that followed.
Does Hitachi Energy India pay a royalty to its parent?
Yes. Hitachi Energy India paid royalty and technology fees of ₹241.85 crore in FY26 to its parent Hitachi Energy Ltd, against ₹254.75 crore in FY25. The FY26 amount was 2.97% of revenue (Cityfort calculation).
Does Hitachi Energy India have debt?
Hitachi Energy India had no borrowings on 30 Sep 2026, ₹83.66 crore of lease liabilities and ₹4,473 crore of cash and cash equivalents. Crisil rated its bank facilities AAA/Stable in a letter of 23 Jun 2026.

Terms on this page

Each explains the term in plain English, with the same number from other companies on Cityfort.

Go deeper

More detail from the same filings. Open any section.

11What it sells

11What it sells

What does Hitachi Energy India sell?

Hitachi Energy India makes the heavy equipment that carries electricity from power plants to cities and factories. It also builds whole substations and HVDC links, and services equipment already installed. It reports one business segment, so revenue by product line is not disclosed.
  • Transformers

    Power, dry-type and traction transformers. They change voltage so power can travel far and then be used safely; traction transformers power trains and metros.

  • High voltage products

    Switchgear, including gas-insulated switchgear (GIS) and disconnectors, that switches and protects high-voltage lines. Its EconiQ GIS uses no SF6 gas.

  • Grid integration

    HVDC (high-voltage direct current) systems that send large amounts of power over long distances, plus FACTS, power quality and substation projects of 220–765 kV. In Q1 FY27 it won its first battery storage project, 165 MW/330 MWh.

  • Grid automation

    Protection and control systems, substation automation and software that monitor and run the grid.

  • Service

    Repairs, refurbishment, upgrades and lifecycle service for equipment already installed.

Think of it like this

Think of the pumps, pipes and valves of a water network, but for electricity: it does not sell the power, it makes the equipment that moves it.

What it does

  • Does: Makes equipment in 19 manufacturing units across 8 locations in India (31 Mar 2026).
  • Does: Builds full substations and HVDC links under contracts that run for years.
  • Does: Exports to more than 70 countries, including to other Hitachi group companies.

What it does not do

  • Does not: Does not generate, transmit or sell electricity; it supplies the equipment.
  • Does not: Does not run its own R&D: management said in May 2026 that R&D spend is managed centrally by the group.
  • Does not: Is not ABB India: ABB India's power grids business was demerged into this company in 2019.
12How the money flows

12How the money flows · FY26

How does money flow through Hitachi Energy India?

Money in

  • Revenue from operations₹8,148 cr
  • Other income (mostly interest on deposits)₹240 cr

The company

Hitachi Energy India

₹8,388 cr came in

Money out

  • Materials, bought-out items and subcontractors₹4,874 cr
  • Employee costs₹643 cr
  • Royalty and technology fees to the parent₹242 cr
  • Other running costs₹1,137 cr
  • Depreciation, interest and one-off labour-code charge₹171 cr
  • Income tax₹333 cr
  • Net profit₹988 cr
  1. Customers paid Hitachi Energy India ₹8,148 crore in FY26 for equipment, projects and service.
  2. Other income, mostly interest on bank deposits, added ₹240 crore.
  3. Materials, bought-out items and subcontractors took ₹4,874 crore, more than half of all the money that came in.
  4. Staff cost ₹643 crore, royalty to the parent ₹242 crore and other running costs ₹1,137 crore.
  5. After depreciation, interest, a ₹54 crore labour-code charge and ₹333 crore of tax, ₹988 crore was profit.
13What it needs to run

13What it needs to run

What does Hitachi Energy India need to run?

  • Factories

    19 manufacturing units in 8 locations and 13 sales offices on 31 Mar 2026. A new large-transformer factory at Karjan, Vadodara, is targeted for Dec 2028.

  • Technology from the parent

    Its products use Hitachi Energy group technology. Royalty and technology fees to Hitachi Energy Ltd were ₹241.85 crore in FY26.

  • Materials and components

    Materials, components and project bought-outs cost ₹4,618 crore in FY26, its largest cost.

  • People

    2,777 employees on 31 Mar 2026, up from 2,481 a year earlier.

  • Bank facilities

    Crisil rates ₹6,000 crore of its bank facilities AAA/Stable (long term) and A1+ (short term), letter of 23 Jun 2026.

14Where it sells

14Where it sells · FY26

Where does Hitachi Energy India sell?

  • India73.8%
  • Other countries (more than 70)26.2%
15Where growth could come from

15Where growth could come from

Where could Hitachi Energy India's growth come from?

Management said in the 7 Nov 2025 Q2 FY26 call that its guidance to enter double-digit EBITDA margins remained. It said "we have entered much ahead of our own target" and would keep a double-digit margin year on year. In the 7 Aug 2026 call management said HVDC revenue is lower in a project's first year, then picks up.
Management statement, 7 Nov 2025. Reported as a statement, not our forecast.
  • HVDC power links

    Early

    2 Indian HVDC orders, FY25 and FY26; values not disclosed

    POWERGRID's Khavda–Nagpur link (booked Q3 FY25, with BHEL) and the Bhadla–Fatehpur link for an Adani Energy Solutions company (booked Q1 FY26). Management said on 7 Aug 2026 that Khavda is picking up and Bhadla is starting. Q1 FY27 orders included HVDC offshore grid-connection systems for a 2 GW European programme.

    Status: Early, too early to judge.

  • Exports

    Working

    ₹2,134 crore in FY26, up 23.6%

    Revenue from other countries rose from ₹1,726 crore in FY25 to ₹2,134 crore in FY26, 26.2% of revenue. Hitachi Energy USA Inc bought ₹582 crore and Hitachi Energy Sweden AB ₹277 crore. Export orders were 33.6% of Q1 FY27 orders excluding HVDC. In Q2 FY27 they rose 41% from a year earlier; the value was not disclosed.

    Status: Working, on track against what the company said.

  • Order backlog

    Working

    ₹33,335 crore, 30 Sep 2026

    The backlog rose from ₹7,230 crore on 31 Mar 2024 to ₹19,246 crore a year later and ₹29,555 crore on 31 Mar 2026. Q2 FY27 orders were ₹4,120.8 crore, up 85.9% from a year earlier, and the backlog reached ₹33,335 crore on 30 Sep 2026.

    Status: Working, on track against what the company said.

  • New capacity

    Mixed

    ₹820.11 crore of QIP capex spent by 30 Sep 2026, against ₹756.57 crore planned by FY26

    The company announced about ₹2,000 crore of investment over 4–5 years in Oct 2024, and about ₹2,000 crore more for a Karjan transformer factory in Jun 2026. Spending passed the FY26 plan only in Q2 FY27, and the monitoring agency's Sep 2026 report shows no delay on the capex object. The Q2 FY27 deck lists nine capacity projects at eight sites and says "Majority of capex will complete by 2028".

    Status: Mixed, partly on track.

  • Service

    Early

    5.3% of FY26 domestic third-party orders

    Management said in Nov 2025 that it had created a dedicated service business unit. Services were 5.3% of FY26 domestic third-party orders, up from 3% in FY25. The company said service orders rose 77% in Q2 FY27 from a year earlier.

    Status: Early, too early to judge.

Status compares progress with what the company itself said it would do: Working = on track against what the company said; Mixed = partly on track; Behind = behind the company's own plan; New = recently announced; Early = too early to judge.

16Financial strength and debt

16Financial strength · 31 Mar 2026

How much debt does Hitachi Energy India have?

On 31 Mar 2026 Hitachi Energy India had no bank borrowings and ₹4,689 crore of cash and cash equivalents.
  • Total debt₹0 cr
  • Cash and investments₹4,689 cr
  • Net cash (cash minus debt)₹4,689 cr
  • Net worth (shareholders' money)₹5,176 cr
Debt to equity
0×
₹ of debt for every ₹1 of shareholders' money
Contingent liabilities
₹125 cr
possible future payments, e.g. disputed claims
  • Advances from customers (money paid before delivery) were ₹2,723 crore on 31 Mar 2026, up from ₹1,604 crore a year earlier.
  • Lease liabilities (rent owed under leases) were ₹86 crore; these are not bank borrowings.
  • The auditor's report says ₹1,870 crore of unused QIP money was in bank fixed deposits on 31 Mar 2026.
  • Contingent liabilities (claims the company disputes) were ₹124.74 crore, mostly GST and income tax, plus ₹86.72 crore of other tax cases.
  • Cash here is cash and cash equivalents as reported.
17Who owns it

17Who owns it · Q2 FY27

Who owns Hitachi Energy India?

  • Promoters (founders or parent company)71.3%
  • Foreign institutions (FII)12.0%
  • Indian institutions (DII)6.5%
  • Public and others10.2%

Promoter pledge

No promoter shares were pledged in Q2 FY27.

How ownership changed
Hitachi Energy India shareholding by quarter, %
QuarterPromotersFIIDIIPublicPledged*
Q3 FY2475.0%4.1%8.5%12.4%0.0%
Q4 FY2475.0%3.5%9.8%11.8%0.0%
Q1 FY2575.0%5.0%8.5%11.4%0.0%
Q2 FY2575.0%5.1%9.0%10.9%0.0%
Q3 FY2575.0%4.5%9.2%11.3%0.0%
Q4 FY2571.3%5.0%12.3%11.4%0.0%
Q1 FY2671.3%7.2%10.3%11.2%0.0%
Q2 FY2671.3%9.7%7.9%11.1%0.0%
Q3 FY2671.3%10.7%7.2%10.8%0.0%
Q4 FY2671.3%11.7%7.0%10.1%0.0%
Q1 FY2771.3%12.4%6.3%9.9%0.0%
Q2 FY2771.3%12.0%6.5%10.2%0.0%

* Pledged = share of the promoters' own holding reported as pledged. In older filings this can include shares “otherwise encumbered”; the governance flags say when.

18What it does with profit

18What it does with profit

What does Hitachi Energy India do with its profit?

Dividend per share for each year; FY22's ₹3.00 covers 15 months. Payout = dividend per share ÷ earnings per share (Cityfort calculation). Dividends paid in cash were ₹26.65 crore in FY26.

Dividend per share

₹8.00FY26

Dividend paid for each share, by financial year.

₹ per share

See the numbers
Dividend per share (₹ per share)
YearDividend per shareShare of profit paid out
FY22₹3.006.3%
FY23₹3.4015.3%
FY24₹4.0010.4%
FY25₹6.006.6%
FY26₹8.003.6%
  • Money raised · 13 Mar 2025

    QIP (qualified institutional placement: new shares sold to large investors): 2,190,688 shares at ₹11,507 each. Net proceeds were ₹2,476.29 crore, and the promoter's holding fell from 75% to 71.31%.

    ₹2,521 cr

19Governance signals

19Governance signals

What do Hitachi Energy India's governance filings show?

Auditor
S.R. Batliboi & Associates LLP
Auditor changes
None in the period covered
Audit qualifications
None reported
Related-party dealings
Hitachi Energy India's largest related-party dealings are with Hitachi group companies. In FY26 it sold them ₹1,928 crore of goods and services and bought ₹1,350 crore of materials and project items. It also paid ₹361 crore for IT, engineering and other services and ₹242 crore of royalty and technology fees. On 12 Oct 2026 shareholders approved FY27 limits by postal ballot. They are up to ₹2,800 crore with Hitachi Energy Sweden AB, ₹1,900 crore with Hitachi Energy USA Inc and ₹1,300 crore with Hitachi Energy Ltd.
Credit rating
Crisil AAA (long term), A1+ (short term) (outlook Stable), 23 Jun 2026

A credit rating describes the company's ability to repay debt. It is not a rating of the share.

Flags to know about

  • related party · 12 Oct 2026

    Royalty to the parent

    Royalty and technology fees to Hitachi Energy Ltd were ₹241.85 crore in FY26 and ₹254.75 crore in FY25. Shareholders approved FY27 payments of up to ₹407.39 crore, within 5% of FY26 turnover.

  • other · 7 Aug 2026

    QIP money spent slower than planned

    The placement plan was ₹756.57 crore of capex and ₹350 crore of working capital by FY26. By 30 Jun 2026 ₹634.63 crore had gone to capex and none to working capital. Crisil Ratings, the monitoring agency, reports no deviation from the stated uses and a delay due to "adverse weather conditions and revision in project scope". The auditor's FY26 report also notes "certain delays".

  • regulatory · 24 Jan 2026

    Tax and customs orders (Dec 2025–Jan 2026)

    An income-tax order for AY 2022-23 demanded ₹16.40 crore of tax and ₹9.67 crore of interest. It cites alleged disallowance of interest on delayed receivables and a group management fee. The company calls the demand "arbitrary, unjustified and unsustainable in law" and will appeal. A Bengaluru customs order alleged non-compliance in filing bills of entry. It demanded ₹3.15 crore of duty, a ₹3.00 crore fine and a ₹3.15 crore penalty, which the company intends to contest. GST orders for FY 2021-22 demanded ₹9.02 crore of tax and a ₹0.90 crore penalty in Uttar Pradesh, ₹1.41 crore in Karnataka and under ₹0.03 crore in Tamil Nadu.

  • disclosure · 17 Oct 2025

    Sister company is separate

    On 17 Oct 2025 the company told the exchanges that a reported ₹2,000 crore Chennai investment was by sister company Hitachi Energy Technology Services Pvt Ltd, not the listed company.

  • disclosure

    One segment, no order values

    The company reports one segment, Power Grids, with no revenue by business unit. It did not disclose the values of its large HVDC orders.

20What the market paid

20What the market paid · price as of 13 Nov 2026

What did the market pay for Hitachi Energy India on 13 Nov 2026?

Price as of 13 Nov 2026 (shown for education; prices change daily).

Price as of 13 Nov 2026: the NSE closing price was ₹31,595. Market value = that price × 44,572,363 shares, about ₹140,826 crore (Cityfort calculation). P/E (price ÷ earnings per share) of 116.9 means the price was 116.9 times earnings per share of ₹270.24 over the four quarters to Q2 FY27. On FY26 earnings per share of ₹221.63 it was 142.6. P/B of 24.5 compares market value with equity of ₹5,756 crore on 30 Sep 2026.

Share price
₹31,595.00
Market value (market cap)
₹140,826 cr
P/E
116.9×
P/B
24.5×

Source: NSE security-wise historical price data, POWERINDIA EQ, 9-13 Nov 2026 (close 13 Nov 2026); Shareholding pattern, quarter ended Sep 2026 (XBRL); Q2 FY27 results, Integrated Filing (Financials) XBRL and 5 more

21How it got here

21How it got here

How did Hitachi Energy India get here?

  1. 2019

    Business-model change

    Demerged from ABB India

    Incorporated on 19 Feb 2019; ABB India's power grids business was demerged into it, effective 1 Dec 2019.

  2. 2020

    Milestone

    Listed on NSE and BSE

    The shares were listed on 30 Mar 2020.

  3. 2021

    Business-model change

    Hitachi group takes control

    On 5 Feb 2021 the 75% stake moved from ABB to Hitachi Energy Ltd, then Hitachi ABB Power Grids AG.

  4. 2021

    Milestone

    New name and a 15-month year

    Renamed Hitachi Energy India Ltd on 12 Nov 2021. To match its parent, FY22 ran 15 months, Jan 2021 to Mar 2022.

  5. 2022

    Milestone

    Hitachi owns all of the parent

    Hitachi Ltd bought the remaining 19.9% of Hitachi Energy Ltd in Dec 2022, Crisil says.

  6. 2024

    Milestone

    Khavda–Nagpur HVDC order

    POWERGRID awarded the Khavda–Nagpur 6,000 MW HVDC link to a consortium of the company and BHEL in Nov 2024.

  7. 2025

    Milestone

    ₹2,520.82 crore QIP

    New shares sold to large investors on 13 Mar 2025; the promoter's holding fell from 75% to 71.31%.

  8. 2025

    Milestone

    Second HVDC contract

    Signed the Bhadla–Fatehpur HVDC contract with an Adani Energy Solutions company on 3 Apr 2025.

  9. 2026

    Milestone

    Karjan factory announced

    About ₹2,000 crore for a large power transformer factory at Karjan, Vadodara, announced on 12 Jun 2026.

22What changed

22What changed · Q2 FY27

What changed in Q2 FY27?

Updated 16 Nov 2026

  • Revenue rose 63.5% to ₹2,996.51 crore in Q2 FY27 (Jul–Sep 2026), from ₹1,832.55 crore a year earlier. Profit rose 20.5% to ₹318.49 crore, and earnings per share were ₹71.46.
  • Q2 FY27 expenses include a ₹56.07 crore loss on derivatives and exchange, while Q2 FY26 other income had a ₹69.81 crore derivative gain. EBITDA was ₹406.3 crore, a 13.6% margin (Cityfort calculation). The company's operational EBITDA, which leaves out an ₹88.1 crore notional loss, was ₹494.4 crore, 16.5%.
  • Orders received rose 85.9% to ₹4,120.8 crore. The order backlog was ₹33,335 crore on 30 Sep 2026, up 13.3% from a year earlier; the company calls it its highest ever.
  • Cash from operations in H1 FY27 was ₹91.33 crore, against ₹874.18 crore a year earlier, as receivables and inventories rose. After ₹369.52 crore of capex, free cash flow was −₹278.19 crore (Cityfort calculation).
  • On 30 Sep 2026 the company had no borrowings, ₹83.66 crore of lease liabilities and ₹4,472.66 crore of cash and cash equivalents.
  • By 30 Sep 2026, ₹820.11 crore of the QIP money had gone to capex and ₹1,665.26 crore was unused. The monitoring agency now shows no delay on capex; the ₹350 crore for working capital is unused and reported as delayed. Net proceeds were revised to ₹2,485.37 crore from ₹2,476.29 crore because issue expenses were lower.

Used in a free classroom lesson: Four traps that make a comparison unfair.

23Sources and changes

Where every number on this page comes from

Sources (58 documents)
  1. S1Integrated Annual Report 2025-26 (FY26, Apr 2025-Mar 2026), incl. Board report, MD&A, BRSR and audited standalone financial statements · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 31 Jul 2026
  2. S2Integrated Annual Report 2024-25 (FY25) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 24 Jul 2025
  3. S3Annual Report 2023-24 (FY24) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 22 Jul 2024
  4. S4Annual Report 2022-23 (FY23; comparatives are the 15 months Jan 2021-Mar 2022) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 19 Jul 2023
  5. S5Annual Report 2021-22 (fifteen months, 1 Jan 2021-31 Mar 2022; name change, change of financial year, demerger history) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 25 Jun 2022
  6. S6Q1 FY27 unaudited results (quarter ended 30 Jun 2026) with limited review report and press release · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 7 Aug 2026
  7. S7Q1 FY27 results, Integrated Filing (Financials) XBRL · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 7 Aug 2026
  8. S8Q4 FY26 and FY26 audited results (quarter and year ended 31 Mar 2026), statement of assets and liabilities, cash flow · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 25 May 2026
  9. S9Q4 FY26 and FY26 results, Integrated Filing (Financials) XBRL · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 25 May 2026
  10. S10Q3 FY26 unaudited results (quarter ended 31 Dec 2025) with press release · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 5 Feb 2026
  11. S11Q3 FY26 results, Integrated Filing (Financials) XBRL · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 5 Feb 2026
  12. S12Q2 FY26 unaudited results (quarter ended 30 Sep 2025) with press release · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 3 Nov 2025
  13. S13Q2 FY26 results, Integrated Filing (Financials) XBRL · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 3 Nov 2025
  14. S14Q1 FY26 unaudited results (quarter ended 30 Jun 2025) with press release · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 30 Jul 2025
  15. S15Q1 FY26 results, Integrated Filing (Financials) XBRL · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 30 Jul 2025
  16. S17Q4 FY25 and FY25 results, Integrated Filing (Financials) XBRL · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 14 May 2025
  17. S18Q3 FY25 unaudited results (quarter ended 31 Dec 2024), integrated filing PDF · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 29 Jan 2025
  18. S19Q3 FY25 results XBRL · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 29 Jan 2025
  19. S20Q2 FY25 results XBRL (quarter ended 30 Sep 2024) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 29 Oct 2024
  20. S21Q1 FY27 investor presentation · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 7 Aug 2026
  21. S22Q4 FY26 / FY26 investor presentation · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 26 May 2026
  22. S23Transcript of Q1 FY27 analyst call held 7 Aug 2026 · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 14 Aug 2026
  23. S24Transcript of Q4 FY26 analyst call held 26 May 2026 · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 1 Jun 2026
  24. S26Transcript of Q2 FY26 analyst call (Nov 2025) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 13 Nov 2025
  25. S27Crisil Ratings rating rationale dated 24 Mar 2025 (Crisil AAA/Stable reaffirmed after the QIP), as filed with the exchanges on 25 Mar 2025 · Crisil Ratings Ltd (rationale filed by the company with NSE/BSE) · Tier 2: rating agency or regulator · 24 Mar 2025
  26. S28Crisil Ratings letter: Crisil AAA/Stable reaffirmed, Crisil A1+ reassigned on Rs 6,000 crore bank facilities (company intimation) · Crisil Ratings Ltd (letter filed by the company with NSE/BSE) · Tier 2: rating agency or regulator · 23 Jun 2026
  27. S29Monitoring agency (Crisil Ratings) report on use of QIP proceeds, quarter ended 30 Jun 2026 · Crisil Ratings Ltd as monitoring agency (filed by the company with NSE/BSE) · Tier 1: company or exchange filing · 7 Aug 2026
  28. S30QIP allotment: 21,90,688 shares at Rs 11,507 (Fund Raise Committee outcome) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 13 Mar 2025
  29. S32Order disclosure: POWERGRID awards Khavda-Nagpur 800 kV, 6,000 MW HVDC link to the Hitachi Energy India and BHEL consortium · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 25 Nov 2024
  30. S34Press release: Bhadla-Fatehpur HVDC contract signed 3 Apr 2025 (Rajasthan Part I PTL, an Adani Energy Solutions subsidiary); to be booked in Q1 FY26 · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 3 Apr 2025
  31. S36Press release: plan to invest about Rs 2,000 crore over 4-5 years (75 years in India) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 7 Oct 2024
  32. S37Revised press release (29 Aug 2025): Rs 300 crore expansion of the Mysuru insulation and components facility · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 1 Sep 2025
  33. S38Press release: about Rs 2,000 crore large power transformer factory at Karjan, Vadodara · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 12 Jun 2026
  34. S41Postal ballot notice: material related-party transactions for FY27 with Hitachi Energy Sweden AB, Hitachi Energy USA Inc and Hitachi Energy Ltd (royalty cap) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 11 Sep 2026
  35. S42Postal ballot results: related-party resolutions passed (deemed 12 Oct 2026) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 12 Oct 2026
  36. S43Clarification: Rs 2,000 crore Chennai media report relates to Hitachi Energy Technology Services Pvt Ltd, not the listed company · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 17 Oct 2025
  37. S44Reg. 30 disclosure: Uttar Pradesh GST order (GST audit) with tax and penalty demand · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 11 Dec 2025
  38. S45Reg. 30 disclosure: Bangalore customs order (duty, redemption fine, penalty) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 16 Dec 2025
  39. S46Reg. 30 disclosure: Karnataka GST order for FY 2021-22 · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 30 Dec 2025
  40. S47Reg. 30 disclosure: Tamil Nadu GST order for FY 2021-22 · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 30 Dec 2025
  41. S48Reg. 30 disclosure: income-tax assessment order for AY 2022-23 · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 24 Jan 2026
  42. S49Shareholding pattern, quarter ended Sep 2026 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 9 Oct 2026
  43. S50Shareholding pattern, quarter ended Jun 2026 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 15 Jul 2026
  44. S51Shareholding pattern, quarter ended Mar 2026 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 16 Apr 2026
  45. S52Shareholding pattern, quarter ended Dec 2025 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 9 Jan 2026
  46. S53Shareholding pattern, quarter ended Sep 2025 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 9 Oct 2025
  47. S54Shareholding pattern, quarter ended Jun 2025 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 10 Jul 2025
  48. S55Shareholding pattern, quarter ended Mar 2025 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 11 Apr 2025
  49. S56Shareholding pattern, quarter ended Dec 2024 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 10 Jan 2025
  50. S57Shareholding pattern, quarter ended Sep 2024 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 11 Oct 2024
  51. S58Shareholding pattern, quarter ended Jun 2024 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 9 Jul 2024
  52. S59Shareholding pattern, quarter ended Mar 2024 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 15 Apr 2024
  53. S60Shareholding pattern, quarter ended Dec 2023 (XBRL) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 10 Jan 2024
  54. S63Q2 FY27 unaudited results (quarter and half year ended 30 Sep 2026) with limited review report, statement of assets and liabilities, cash flow and press release · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 12 Nov 2026
  55. S64Q2 FY27 results, Integrated Filing (Financials) XBRL · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 12 Nov 2026
  56. S65Q2 FY27 investor presentation (analyst call 12 Nov 2026) · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 12 Nov 2026
  57. S66Monitoring agency (Crisil Ratings) report on use of QIP proceeds, quarter ended 30 Sep 2026 · Hitachi Energy India Ltd (filed with NSE/BSE; downloaded from NSE archives) · Tier 1: company or exchange filing · 12 Nov 2026
  58. S67NSE security-wise historical price data, POWERINDIA EQ, 9-13 Nov 2026 (close 13 Nov 2026) · National Stock Exchange of India · Tier 1: company or exchange filing · 13 Nov 2026
Changes to this page (v2 · 16 Nov 2026)
  1. v2 · 16 Nov 2026Added Q2 FY27 results (filed 12 Nov 2026), the Sep 2026 QIP monitoring report and the 13 Nov 2026 NSE closing price. The Q2 FY27 call transcript was not yet filed. (quarterly update, Q2 FY27)
  2. v1 · 12 Nov 2026First version. (first version)

Numbers come only from tier 1 and tier 2 sources. Read how we research.

Disclaimer

For learning only. Cityfort is not a SEBI-registered adviser and does not recommend buying or selling any security. Prices shown are dated and may be out of date.

Investing in securities involves risk, including loss of capital. Before making any investment decision, do your own research and consider consulting a SEBI-registered investment adviser.

Cityfort, its owners and contributors may or may not hold securities of companies covered. Content is not an offer or solicitation to buy or sell any security.

Read the full disclaimer

Cityfort publishes educational content that explains how listed companies work. Cityfort is not registered with the Securities and Exchange Board of India (SEBI) as an Investment Adviser or Research Analyst and does not provide investment advice, recommendations, ratings, price targets or any opinion on whether to buy, sell or hold any security.

All information is taken from publicly available sources, mainly company filings on BSE and NSE, which are listed on each page with dates. We work to keep it accurate and correct errors publicly, but we do not guarantee that it is complete, accurate or up to date. Any market price or price-based ratio shown is dated, may be out of date by the time you read it, and is included only to explain concepts.

Statements by company management are reported as statements, with their date and source; they are not our forecasts.